9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Woollahra Erosion & Sediment Control Conditions

3 erosion & sediment control conditions imposed by Woollahra across 3 development applications in our dataset. Erosion and sediment control conditions prevent soil and sediment leaving the site during construction — sediment fences, stabilised site access, dewatering controls and an erosion and sediment control plan.

DA 413/2024 det. 02/09/2025

For more information go to www.sydneywater.com.au/section73 or call 1300 082 746 to learn more about applying through an authorised WSC or Sydney Water. Where private sewer pipes are old, may leak or may be subject to root invasion (whether from existing or proposed private or public landscaping) that existing cast iron, concrete, earthenware or terracotta systems are replaced with new UPVC or copper continuously welded pipes between all sanitary fixtures and Sydney Waters sewer main as part of the development. Leaking sewer pipes are a potential source of water pollution, unsafe and unhealthy conditions which must be remedied in the public interest. Condition Reason: To ensure that private…

DA546/24 det. 18/09/2025

All new guttering is to comply with the provisions of AS3500. • Condition Reason: To ensure that works are carried out in accordance with the Building Code of Australia and any required contract of insurance is in force. (Autotext 1E) E.2 Erosion and Sediment Controls – Installation Before any building work commences, water pollution, erosion and sedimentation controls must be installed and maintained in accordance with: a) The Soil and Water Management Plan if required under this consent; b) “Do it Right On Site, Soil and Water Management for the Construction Industry” and accompanying factsheets published by the Southern Sydney Regional Organisation of Councils, and c) “Managing Urban…

DA 557/2024 det. 21/07/2025

• See Over our Dead Body Society Inc v Byron Bay Community Association Inc [2001] NSWLEC 125. Condition Reason: To ensure appropriate conditions are complied with for development for the alteration and extension of an existing building. (Autotext 1B) B.2 Erosion and Sediment Controls – Installation Before any site work commences, water pollution, erosion and sedimentation controls must be installed and maintained in accordance with: a) “Do it Right On Site, Soil and Water Management for the Construction Industry” and accompanying factsheets published by the Southern Sydney Regional Organisation of Councils, and b) “Managing Urban Stormwater - Soils and Construction” 2004 published by the…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.