9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Woollahra Stormwater Conditions

4 stormwater conditions imposed by Woollahra across 4 development applications in our dataset. Stormwater conditions control how a development collects, detains and discharges rainwater runoff — on-site detention (OSD), drainage easements, water-sensitive urban design and connection to council drainage systems.

DA 413/2024 det. 02/09/2025

Condition Reason: To ensure a waste and recycling storage area is provided. Utility Services Generally Before the issue of any construction certificate, the construction certificate plans and specifications required by clause 7 of the Development Certification and Fire Safety Regulation, must demonstrate that all utility services (telecommunications, electricity, gas, water and waste water) will be provided underground. All service ducts, pipes and conduits must be provided within the fabric of the building (excluding stormwater down pipes). A customer's electrical supply connection and point of connection must comply with the NSW Service and Installation Rules:…

DA2024/376/1 det. 10/04/2025

Do you need HELP indexing the levy? Please contact Council’s Customer Service Team on 02 9391 7000. Failure to correctly calculate the adjusted development levy will delay the issue of any certificate issued under section 6.4 of the Act and could void any such certificate (e.g. construction certificate, subdivision certificate, or occupation certificate). Condition Reason: To ensure any relevant contributions are paid. Erosion and Sediment Control Plan – Submission and Approval Before the issue of any construction certificate, an erosion and sediment control plan, prepared by a suitably qualified person in accordance with the following documents, must be submitted to the Principal…

DA 557/2024 det. 21/07/2025

PO Box 398 Parramatta NSW 2124 (i) not later than 28 days after the end of the water year (being 30 June) in which the water was taken, or (ii) if WaterNSW directs the person in writing to give the record to WaterNSW on an earlier date, by that date. GT0119-00001 All extracted groundwater must be discharged from the site in accordance with Council requirements for stormwater drainage or in accordance with any applicable trade waste agreement. GT0120-00001 The design and construction of the building must prevent: (a)any take of groundwater, following the grant of an occupation certificate (and completion of construction of development), by making any below-ground levels that may be impacted…

DA546/24 det. 18/09/2025

The Principal Certifier has no discretion to reduce or increase the number or area of car parking or commercial parking spaces required to be provided and maintained by this consent. Condition Reason: To ensure parking facilities are designed in accordance with the Australian Standard. D.19 Stormwater Management Plan Before the issue of any construction certificate, the applicant must submit, for approval by the Principal Certifier, detailed stormwater management plans prepared and certified by a chartered professional civil engineer, which detail the following: c) General design in accordance with the Stormwater Management Plan, referenced 230892 DA, Rev 4, prepared by Greenview…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.