9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Woollahra Contamination Conditions

5 contamination conditions imposed by Woollahra across 5 development applications in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.

DA 413/2024 det. 02/09/2025

Before the issue of the construction certificate, the applicant must submit, for approval by the Principal Certifier, a detailed geotechnical report prepared by a Geotechnical Engineer with National Engineering Register (NER) credentials in accordance with Chapter E2 of Council’s DCP and Council’s document “Guidelines for Preparation of Geotechnical and Hydrogeological Reports”. The report must include a Geotechnical / Hydrogeological Monitoring Program together with civil and structural engineering details for foundation retaining walls, footings, basement tanking, and subsoil drainage systems, as applicable, prepared by a professional engineer, who is suitably qualified and experienced in…

DA2024/376/1 det. 10/04/2025

• The project arborist must provide written certification of compliance to the Principal Certifier with the above conditions. Condition Reason: To ensure the protection of existing trees Standard Condition B.5 Identification of Hazardous Material Prior to any site works, and in accordance with Australian Standard AS2601: The Demolition of Structures, all hazardous substances located on the site must be identified, including asbestos, polychlorinated biphenyls (PCBs), lead paint, underground storage tanks, chemicals, etc. In this regard, prior to any site works, Council must be provided with a written report prepared by a suitably qualified competent person detailing: • all hazardous…

DA546/24 det. 18/09/2025

• provisions of the Protection of the Environment Operations Act 1997 have overriding effect if offensive noise or odour arises from the use. Applicants must pay attention to the location of air intakes and air exhausts relative to • sources of potentially contaminated air and neighbouring windows and air intakes respectively, see section 2 and 3 of AS 1668.2 Condition Reason: To ensure the development is provided with adequate light and ventilation. (Autotext 59D) D.24 Acoustic Certification of Mechanical Plant and Equipment Before the issue of any construction certificate, the construction certificate plans and specifications required under clause 7 of the Development Certification and…

DA 557/2024 det. 21/07/2025

Applicant. Site means the land being developed subject to this consent. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Woollahra LEP means Woollahra Local Environmental Plan 2014 Woollahra DCP means Woollahra Development Control Plan 2015 Work for the purposes of this consent means: DA557/2024/1 2 of 75 4 Manning Road DOUBLE BAY • the use of land in connection with development, • the subdivision of land, • the erection of a building, • the carrying out of any…

DA489/24 det. 07/10/2025

Applicant. Site means the land being developed subject to this consent. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Woollahra LEP means Woollahra Local Environmental Plan 2014 Woollahra DCP means Woollahra Development Control Plan 2015 Work for the purposes of this consent means: the use of land in connection with development, • the subdivision of land, • the erection of a building, • the carrying out of any work, • 2 the use of any site crane, machine,…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.