Wollondilly Erosion & Sediment Control Conditions

6 erosion & sediment control conditions imposed by Wollondilly across 2 development applications in our dataset. Erosion and sediment control conditions prevent soil and sediment leaving the site during construction — sediment fences, stabilised site access, dewatering controls and an erosion and sediment control plan.

DA/2021/305/1 det. 11/03/2022

These conditions have been imposed to ensure that developments within the Shire are of a standard which is both safe and acceptable to Council and members of the public. • All civil and road works are to be designed and carried out in accordance with Wollondilly shire Council’s adopted Design and Construction Specifications. • Prior to issue of Construction Certificate, a "Soil and Water Management Plan" (SWMP) that outlines the measures that will be taken to limit and contain sediment laden runoff during construction shall be submitted to Council. The measures shall be in accordance with Council's Construction specification and the Department of Housing's "Blue Book". The plan is to be…

Condition 89 DA/2023/707/1 det. 28/06/2024 Subdivision of land

89. Soil and Water Management Stockpiles of construction and landscaping materials, and site debris are to be located clear of drainage lines and in such position that they are within the erosion containment boundary or are equivalently protected from erosion and do not encroach upon any footpath, natural strip or roadway. Condition reason: Construction works should have minimal impact on the general public and environment.

Condition 90 DA/2023/707/1 det. 28/06/2024 Subdivision of land

90. Soil and Water Management Stockpiles of materials must be covered, grassed or actively managed to limit the dispersal of material from the site. Topsoil stripped from the construction site is to be stockpiled and protected from erosion until re- used during landscaping. Condition reason: Construction works should have minimal impact on the general public and environment.

Condition 86 DA/2023/707/1 det. 28/06/2024 Subdivision of land

86. Soil and Water Management The person or entity having the benefit of this consent must ensure adjoining roads and properties are not impacted by dust, mud, sediment, soil or any other material created from the construction works. Condition reason: Construction works should have minimal impact on the general public and environment.

Condition 87 DA/2023/707/1 det. 28/06/2024 Subdivision of land

87. Soil and Water Management All disturbed areas are to be stabilised by turfing, mulching, paving or otherwise suitably stabilised prior to the release of a subdivision certificate. Condition reason: Construction works should have minimal impact on the general public and environment.

Condition 54 DA/2023/707/1 det. 28/06/2024 Subdivision of land

54. Soil Stabilisation A Soil Stabilisation Strategy must be prepared to detail the measures to progressively stabilise the earthworks, and control erosion and sediment pollution from the development. Condition reason: Controls are to minimise impact to the environment.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.