Lake Macquarie Erosion & Sediment Control Conditions

4 erosion & sediment control conditions imposed by Lake Macquarie across 4 development applications in our dataset. Erosion and sediment control conditions prevent soil and sediment leaving the site during construction — sediment fences, stabilised site access, dewatering controls and an erosion and sediment control plan.

DA/2087/2018/REV det. 20/12/2023

The development shall be carried out in accordance with the conditions of consent and the following documents (as may be varied by the conditions of consent). Plan of Proposed Subdivision (Dwg ref: 239736(5)-DA-101-R), ADW Johnson, 25 January 2023, Version R Concept Engineering Plans (Dwg ref: 239736(5)-CENG-001-602-T), ADW Johnson, 31 January 2023, Version T Concept Stormwater Management Plan (Ref: P1907408JR03V03), Martens Consulting Engineers, 11 September 2020, Version 3 Water Sensitive Urban Design by Martens Consulting Engineers dated 6 May 2020, Ver 4, reference P1907408JR01V04. Soil and Water Management Plan by ADW Johnson dated 11 August 2020, Rev F. Riparian Maintenance Access…

DA/2294/2021/A det. 03/11/2025

GT0122-00001 Construction Phase Monitoring programme and content: a) A monitoring programme must be submitted, for approval, to WaterNSW with the water supply work application. The monitoring programme must, unless agreed otherwise in writing by WaterNSW, include matters set out in any Guide published by the NSW Department of Planning Industry and Environment in relation to groundwater investigations and monitoring. Where no Guide is current or published, the monitoring programme must include the following (unless otherwise agreed in writing by WaterNSW): i. Pre-application measurement requirements: The results of groundwater measurements on or around the site, with a minimum of 3 bore…

DA/1651/2022/A det. 10/12/2025

Construction works shall not commence until a meeting between the contractor and a representative of the Council or Principal Certifying Authority has taken place on site. In accordance with Section 6.12 of the Environmental Planning and Assessment Act the Council or Principal Certifying Authority shall be given at least two days notice in writing prior to such meeting taking place. The notice shall also include the names of the contractor undertaking construction and the developer's supervising officer. Conditions to be satisfied during demolition and construction works The person having the benefit of the consent shall comply with each of the following conditions during demolition and…

DA/2630/2022 det. 22/05/2023

All works within the public domain shall be designed and constructed in accordance with the following publications (as amended or updated), as applicable:- • Australian Rainfall and Runoff, 1987. • Development Control Plan 2014 and supporting guidelines. • AUSTROADS Guide to Road Design Guide. • Roads and Maritime Services Delineation Guidelines. • Managing Urban Stormwater documents (2004) by Landcom. • The Constructed Wetlands Manual - Department of Land and Water Conservation, 1998. • WSUD Technical Design Guidelines for South East Queensland. • Healthy Waterways – Water by Design Guidelines. • Australian Standards including, but not limited to:- • AS1428 - Design for Access and…