Woollahra Construction Management Conditions

6 construction management conditions imposed by Woollahra across 4 development applications in our dataset. Construction management conditions govern how building work is carried out — construction management plans, approved work hours, site fencing and hoarding, dust and noise control, and protection of public roads and infrastructure.

DA2024/376/1 det. 10/04/2025

• Upon completion of each section of road, drainage and landscape work to Council's satisfaction, 90% of the bond monies held by Council for these works will be released upon application. 10% may be retained by Council for a further 6 month period and may be used by Council to repair or rectify any defects or temporary works during the 6 month period. • The Refund of Security Bond Application form can be downloaded from www.woollahra.nsw.gov.au Condition Reason: To ensure any relevant security and fees are paid. Dilapidation Reports for Existing Buildings Before any site work commences, dilapidation surveys and dilapidation reports must be conducted and prepared by a professional structural…

Condition 3 DA2024/376/1 det. 10/04/2025

3. the land is zoned R3 Medium Density Residential and the hoarding is located in a lane or street that does not have through traffic (e.g. a cul-de-sac or no through road). • Artwork and historic images for the hoardings are assessed and approved in accordance with the Creative Hoardings Policy. Details of the artwork or images proposed to be affixed to the hoardings must be submitted with Council’s form “Application for a permit to use a footpath for the erection of a hoarding/scaffolding”. The Creative Hoardings Policy can be downloaded from www.woollahra.nsw.gov.au Condition Reason: To ensure public safety. Site Signs Before any site work commences, the sign/s required by clauses 70 of…

DA 413/2024 det. 02/09/2025

Condition Reason: To ensure the protection of existing trees Standard Condition B.5 Construction Management Plan Arborist Review Prior to any site works, the Construction Management Plan must be reviewed and certified by the Project Arborist confirming that appropriate tree protection measures are implemented. The Construction Management Plan must be prepared in accordance with all tree protection measures specified within this consent. The plan must address: • Drawings and method statement showing details and the location of hoarding and scaffold and any pruning required to accommodate the hoarding and scaffolding; • The movement and positioning of heavy machinery, lifting cranes, pier…

Condition 3 DA489/24 det. 07/10/2025

3. the land is zoned R3 Medium Density Residential and the hoarding is located in a lane or street that does not have through traffic (e.g. a cul-de- sac or no through road). Artwork and historic images for the hoardings are assessed and approved in accordance • with the Creative Hoardings Policy. Details of the artwork or images proposed to be affixed to the hoardings must be submitted with Council’s form “Application for a permit to use a footpath for the erection of a hoarding/scaffolding”. The Creative Hoardings Policy can be downloaded from www.woollahra.nsw.gov.au Condition Reason: To ensure public safety. (Autotext 22B) B.20 Site Signs Before any site work commences, the sign/s…

Condition 1 DA 557/2024 det. 21/07/2025

1. the capital investment value of the work to which the hoarding relates is less than $1 million, or 2. the land is zoned R2 Low Density Residential, or

Condition 1 DA489/24 det. 07/10/2025

1. the capital investment value of the work to which the hoarding relates is less than $1 million, or 2. the land is zoned R2 Low Density Residential, or

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.