9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Canterbury-Bankstown Accessibility / DDA Conditions

4 accessibility / dda conditions imposed by Canterbury-Bankstown across 4 development applications in our dataset. Accessibility conditions ensure a development is usable by people with disability — compliance with AS 1428, accessible parking and sanitary facilities, continuous paths of travel and adaptable housing.

DA-1049/2024 det. 15/04/2025

Before the commencement of any construction works, a dilapidation report must be prepared by a suitably qualified engineer detailing the structural condition of adjoining buildings, structures or works and public land, for the following properties: 173 Weston St, Panania, NSW 2213 173A Weston St, Panania, NSW 2213 8 Hinemoa St, Panania, NSW 2213 Where access has not been granted to any adjoining properties to prepare the dilapidation report, the report must be based on a survey of what can be observed externally and demonstrate, in writing, that all reasonable steps were taken to obtain access to the adjoining properties. No less than 14 days before any site work commences, adjoining…

DA-289/2025 det. 26/08/2025

Condition reason: To provide and maintain orderly and safe areas for vehicular and pedestrian movement / parking. Access Intercom Where a boom gate or barrier control is in place, the visitor spaces must be accessible to visitors by the location of an intercom (or card controller system) at the car park entry, installed at least 4 metres recessed into the site, when measured from the property boundary with the street. The intercom is to be wired to all units. The intercom must comply with Australian Standard AS 1428.2: Design for access and mobility - Enhance and additional requirements - Building and facilities Sections 22 and 23. 2.111 Condition reason: To provide and maintain orderly and…

Condition 3 DA-1524/2023

3. DA-1524/2023 - 67 Auld Avenue, 41 and 77 Keys Parade, 1 Luderick Avenue, 40 Prescot Parade and 265 Horsley Road, Milperra (previously known as 40 and 56 Prescott Parade, 67, 67A, 90 and 100 Auld Avenue and 265 Horsley Road, Milperra) Construction of a publicly accessible shared cycleway and pedestrian access path along the Georges River, including elevated sections, and a bridge over mangroves and the northern creek, and ancillary works. The proposed development is designated development, and nominated integrated development requiring a Controlled Activity Approval under the Water Management Act 2000 from the NSW Department of Primary Industries (Water). Site Visit An inspection of the…

Condition 53 DA-1182/2024 det. 13/02/2026 Compass Centre

53. Recycling Cupboards on each floor The certifier must not issue a relevant construction certificate unless provided with detailed plans that form part of the construction certificate for the recycling cupboards that comply with the following requirements as well as the requirements of Council’s “Waste Management Guide for New Developments”: a. Maximum distance of 30 metres from all dwellings; b. Access is to be in accordance with AS 1428 (Set): ‘Design for access and mobility’; c. Located directly adjacent to the chute hopper and contain one 240L recycling bin and one FOGO bin/bucket; DA-1182/2024 23 d. Designed to fit 2x240L bins facing forward; e. Designed so the doors are of…