17 traffic & access conditions imposed by Canterbury-Bankstown across 6 development applications in our dataset. Traffic and access conditions address vehicle and pedestrian movement — driveway and vehicle crossing design, sight lines, road and footpath works, traffic management plans and access for service and emergency vehicles.

Condition 43 DA-1182/2024 det. 13/02/2026 Compass Centre

43. Traffic Management Plan Before the issue of the first construction certificate for this development, the consent holder must obtain approval from Council’s Traffic Section for a Site, Pedestrian and Traffic Management Plan (SPTMP). This Plan must address the measures that will be implemented for pedestrian safety and traffic management as specified below. A PRIVATE CERTIFIER CANNOT APPROVE YOUR SITE, PEDESTRIAN & TRAFFIC MANAGEMENT PLAN This plan shall include details of the following: a. Proposed ingress and egress points for vehicles to and from the construction site; b. Proposed protection of pedestrians, adjacent to the constructions site; c. Proposed pedestrian management whilst…

DA-1049/2024 det. 15/04/2025

Furthermore, for internal driveways with a gradient exceeding 10% (1 in 10), longitudinal profiles of all vehicular driveways and ramps shall demonstrate compliance before the commencement of any construction works. The maximum grade of the driveway/ramp shall not exceed 25% and shall comply with AS 2890 parking series. The profile shall be drawn at a reduction ratio of 1 to 25 vertical and horizontal and shall be related to the datum used for the issue of the footway design levels and shall also show the road centre line levels, Council issued footway design levels and gutter levels. Council's Car Clearance Profile in Council's Development Engineering Standards, (Plan No. S 006) shall be…

DA-289/2025 det. 26/08/2025

New or modified connection To apply to connect or modify a connection for a residential or commercial premises. Ausgrid recommends the proponent to engage an Accredited Service Provider and submit a connection application to Ausgrid as soon as practicable. Visit the Ausgrid website for further details; https://www.ausgrid.com.au/Connections/Get-connected Additional information can be found in the Ausgrid Quick Reference Guide for Safety Clearances “Working Near Ausgrid Assets - Clearances". This document can be found by visiting the following Ausgrid website: HYPERLINK…

DA-2/2025 det. 08/09/2025

Aboricultural Impact Assessment Report, prepared by Rain Tree Consulting, dated 24 June 2025. Archaeological Assessment, prepared by CRM, dated May 2025. Research Design for Archaeology, prepared by CRM, dated June 2025. EXCEPT AS AMENDED by the General Terms of approval: Heritage consultant A suitably qualified and experienced heritage consultant must be nominated for this project. The nominated heritage consultant must provide input into the detailed design, provide heritage information to be imparted to all tradespeople during site inductions, and oversee the works to minimise impacts to heritage values. The nominated heritage consultant must be involved in the selection of appropriate…

Condition 59 DA-1182/2024 det. 13/02/2026 Compass Centre

59. On-Site Waste Collection within Basement Before the issue of any relevant construction certificate, the certifier must receive written confirmation from Council, that Council has been provided to its satisfaction with the following: a. Detailed plans showing that the waste storage rooms identified on stamped plans will be capable of being accessed from the designated access roadway by a Heavy Rigid Vehicle (HRV) in accordance with AS2890.2, DA-1182/2024 26 and that a loading area is available for the vehicle when collecting waste that meets the following requirements: i. Within 5 metres of all waste storage rooms or temporary holding area; ii. A separate parking area for the collection…

Condition 44 DA-1182/2024 det. 13/02/2026 Compass Centre

44. Construction Site Management Plan Before the issue of the first construction certificate, a Construction Site Management Plan (CSMP) must be prepared and approved by the certifier. The plan must include the following matters: a. The location and materials for protective fencing and hoardings on the perimeter of the site; b. Provisions for public safety; c. Pedestrian and vehicular site access points and construction activity zones; d. Details of construction traffic management including: i. Proposed truck movements to and from the site; ii. Estimated frequency of truck movements; and iii. Measures to ensure pedestrian safety near the site; e. Details of bulk earthworks to be carried…

Condition 56 DA-1182/2024 det. 13/02/2026 Compass Centre

56. Private on-site waste collection Before the issue of any relevant construction certificate, the certifier must receive written confirmation from Council, that Council has been provided to its satisfaction with the following: a. Detailed plans showing that the waste storage rooms identified on stamped plans will be capable of being accessed from the designed access roadway by a Small Rigid Vehicle (SRV) in accordance with AS2890.2, and that a loading area is available for the vehicle when collecting waste that meets the following requirements: i. Within 5 metres of all waste storage rooms or temporary holding area; ii. A separate parking area for the collection vehicle; and iii. Include…

Condition 2 DA-1182/2024 det. 13/02/2026 Compass Centre

2. Design Amendments for access Before the issue of the relevant construction certificate, the certifier must ensure the approved construction certificate plans (and specifications) detail the following required design amendments to the approved plans (stamped by Council) and supporting documentation. a. Breakthrough panels shall be provided within the basement parking of the development to allow future vehicle access to 62 The Mall for light vehicles only, subject to demonstrating that it is impractical or unreasonable for the development to provide access to any vehicle other than light vehicles through the breakthrough panels whilst maintaining the original design intent as shown in the…

Condition 179 DA-1182/2024 det. 13/02/2026 Compass Centre

179. Parking spaces No part of the common property, apart from the visitor vehicle spaces which are to be used only by visitors to the building, and service vehicle spaces which are to be used only by service vehicles, is to be used for the parking or storage of vehicles or boats. Condition reason: To ensure the development is built and remains consistent with approved plans and documentation. Taxi and coach drop-off/pick-up As no on-site parking has been provided for taxi and coaches, these 180. vehicles are to utilise existing on-street parking spaces in accordance with the sign-posted time limits and NSW Road Rules. As agreed, Council will not be installing any on-street parking spaces…

Condition 151 DA-1182/2024 det. 13/02/2026 Compass Centre

151. Install traffic signals Before the issue of an occupation certificate, the principal certifier is to ensure that the traffic signalling system required has been installed to the following specifications: a. The system of traffic lights and/or mirrors must be installed at the ends of any single lane ramp(s), to indicate traffic movement on the ramp(s). b. The system using traffic light signals must maintain a green signal to entering vehicles at the point of entry and must maintain a red signal when an exiting vehicle is detected upon the ramp or driveway. Condition reason: To protect and enhance the amenity of the occupants of the development site and the occupants of adjoining sites.…

Condition 5 DA-1524/2023

5. Delete Condition 169. Vote: 4 – 0 in favour Reasons for decision The Panel determines to approve the Development Application for the reasons set out in the Assessment Report. The Panel took into accounts residents’ objections to the development, and the Panel was satisfied that the Council Assessment Report and the Conditions imposed adequately considered those issues. Prior to consideration of the following item, Elisabeth Peet declared a pecuniary conflict of interest in the matter as she is employed by Transport for NSW and Roads and Maritime Services is one of the owners of the land. Ms Peet left room prior to consideration of the matter and did not vote on the matter in closed…

Condition 67 DA-783/2024 det. 17/12/2024 New Community Hub

67. Plan of Management The Operational Plan of Management submitted in support of this application prepared by Canterbury-Bankstown Council, dated, 12 June 2024, as amended by Condition 4A, forms part of the development consent and must be complied with at all times. In the event of any inconsistency, the conditions of this consent will prevail over the plan of management. Any amendments to the Operational Plan of Management are to be submitted to and approved by Council's Manager Development. Condition reason: To ensure the development is built and remains consistent with approved plans and documentation.

Condition 188 DA-1182/2024 det. 13/02/2026 Compass Centre

188. Traffic signal maintenance Any system using traffic light signals must maintain a green signal to entering vehicles at the point of entry and must maintain a red signal when an exiting vehicle is detected upon the ramp or driveway. This is to ensure that vehicles entering the site do not have to wait at the top of the ramp, and vehicles wishing to exit the site must wait for entering vehicle in the basement at the waiting bay. Condition reason: To provide and maintain orderly and safe areas for vehicular and pedestrian movement / parking.

Condition 206 DA-1182/2024 det. 13/02/2026 Compass Centre

206. Future subdivision needs Development consent Any proposal for strata subdivision will require a separate application to Council to obtain development consent and the subsequent approval of the plan of subdivision and issue of a subdivision certificate under Section 6.15 of the Environmental Planning and Assessment Act 1979. Condition reason: To ensure compliance with the relevant New South Wales legislation. DA-1182/2024 62 GENERAL TERMS OF APPROVAL Condition

Condition 207 DA-1182/2024 det. 13/02/2026 Compass Centre

207. Water NSW General Terms of Approval The General Terms of Approval dated 7 July 2025 from the nominated State Agency form part of this development consent and must be complied with to the satisfaction of that Agency pursuant to Section 4.47 of the Environmental Planning and Assessment Act 1979. Condition reason: To ensure compliance with the relevant New South Wales legislation. AIRSPACE OPERATIONS - CONTROLLED ACTIVITY Condition

Condition 129 DA-1182/2024 det. 13/02/2026 Compass Centre

129. Internal Ramps The internal vehicle access ramps are to be line marked with additional Raised Pavement Markers installed in the centre of each ramp to allow a B85 and B99 vehicle to safely pass one another. Condition reason: To ensure compliance with the relevant Australian Standards.

Condition 153 DA-1182/2024 det. 13/02/2026 Compass Centre

153. Agreement with Council Before the issue of any occupation certificate, an agreement must be entered into with Council on terms satisfactory to Council for the collection of waste. Condition reason: To ensure compliance with the relevant Canterbury Bankstown policy.