Canterbury-Bankstown BASIX Compliance Conditions
5 basix compliance conditions imposed by Canterbury-Bankstown across 3 development applications in our dataset. BASIX conditions require residential development to meet NSW targets for water use, thermal comfort and energy efficiency, with the commitments on the BASIX certificate shown on plans and certified at completion.
Building Plan Approval (including Tree Planting Guidelines) The plans must be approved by Sydney Water prior to demolition, excavation or construction works commencing. This allows Sydney Water to determine if sewer, water or stormwater mains or easements will be affected by any part of your development. Any amendments to plans will require re-approval. Please go to Sydney Water Tap in® to apply. Sydney Water recommends developers apply for a Building Plan Approval early as to reduce unnecessary delays to further referrals or development timescales Condition reason: To ensure compliance with the relevant New South Wales legislation. BASIX Certificate The development must be carried out in…
Refer to HYPERLINK "http://www.sydneywater.com.au/tapin" www.sydneywater.com.au/tapin for Sydney Water’s Guidelines for building over or next to assets, visit HYPERLINK "http://www.sydneywater.com.au" www.sydneywater.com.au ‘Plumbing, building & developing’ then ‘Building Plan Approvals’ or call 13000 TAPINTM. Sydney Water must issue either a Building Plan Assessment letter which states that the application is approved, or the appropriate plans must be stamped by a Water Servicing Coordinator. 2.202.S Condition Reason: To protect existing public and private infrastructure and building works during demolition, construction and ongoing use of the development. BASIX Certificate The development…
65. Air conditioning units – BASIX requirements The location of any air-conditioning and hot water units and associated infrastructure must be located to ensure that they are not visible from the street, and that they do not result in a non-compliance with the relevant built form controls and private open space controls contained within the Apartment Design Guide. Confirmation from a suitably qualified architect that the BASIX commitments do not compromise the design guidance as contained within the Apartment Design Guide must be provided to the certifier before the issue of a relevant construction certificate. Condition reason: To protect and enhance the amenity of the occupants of the…
17. BASIX Certificate The development must be carried out in accordance with the commitments shown on the submitted BASIX Certificate. The BASIX commitments must be reflected in the construction certificate plans and specifications for the relevant construction certificate. Any proposed changes to the BASIX commitments after the construction certificate has been issued will require an updated BASIX Certificate. Condition reason: To ensure compliance with the relevant New South Wales legislation.
87. BASIX commitments While building work is being carried out, the consent holder must undertake the development strictly in accordance with the commitments listed in the BASIX certificate(s) approved by this consent, for the development to which the consent applies. Condition reason: Prescribed condition under section 75 of the Environmental Planning and Assessment Regulation 2021.
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
BASIX Compliance conditions in other councils
City of Parramatta
18 conditions
Ku-ring-gai
16 conditions
City of Ryde
11 conditions
Willoughby
9 conditions
Hornsby
6 conditions
Wollongong
5 conditions
Georges River
4 conditions
Campbelltown
4 conditions
Canada Bay
4 conditions
Newcastle
4 conditions
Lane Cove
4 conditions
Waverley
4 conditions
Fairfield
3 conditions