Hawkesbury Bushfire Protection Conditions

3 bushfire protection conditions imposed by Hawkesbury across 2 development applications in our dataset. Bushfire protection conditions apply to bushfire-prone land — asset protection zones (APZ), Bushfire Attack Level (BAL) construction standards, dedicated water supply for firefighting and emergency access.

DA0266/23 det. 15/12/2023

Condition reason: Statutory requirement 13 Internal Roads – Design Requirements All provisions for internal roads must comply with the Planning for Bush Fire Protection 2019 (or be otherwise supported by the Rural Fires Service in a Bushfire Safety Authority), Section 3.1.1 of the Jacaranda Development Control Plan and Hawkesbury Development Control Plan, Appendix E: Civil Works Specification. Details demonstrating compliance with the above requirement are to be submitted to Council for all subdivision Development Applications. Condition reason: To ensure suitable road layout provided and in compliance with relevant standards. 14 Stormwater quantity control – Design Requirements All…

Condition 80 DA0190/22 det. 07/12/2022 Educational Establishment

80. Suitability of Glazing - Windows and Doors Glazing materials installed in the building must be in accordance with Australian Standards AS 1288 - 'Glass in Buildings - Selection and Installation' and AS 2047 - 'Windows and external glazed doors in buildings', e.g. windows, doors, footlights, balustrades and shower screens. A Certificate of Compliance is required to be provided to the Principal Certifier prior to the issue of an Occupation Certificate for the relevant stage. Note: The certificate is required to be signed by the manufacturer and the installer.

Condition 81 DA0190/22 det. 07/12/2022 Educational Establishment

81. Suitability of Glazing - Balustrades Glass balustrades must be designed and installed in accordance with Australian/New Zealand Standard AS/NZS 1170.1 - 'Structural design action s- Permanent, imposed and other actions'. Engineering certification must be provided to the Principal Certifier for glass balustrading used in the development prior to the issue of an Occupation Certificate for the relevant stage.