Hawkesbury Traffic & Access Conditions

8 traffic & access conditions imposed by Hawkesbury across 4 development applications in our dataset. Traffic and access conditions address vehicle and pedestrian movement — driveway and vehicle crossing design, sight lines, road and footpath works, traffic management plans and access for service and emergency vehicles.

DA0092/22 det. 29/05/2023

No works other than those approved are permitted by this consent. Note: This consent permits the staging of the development in terms of both Subdivision Works Certificates and Subdivision Certificates. Any applications for a staged Subdivision Works Certificate (construction) or Subdivision Certificate (registration) shall clearly detail the allotments covered and demonstrate the availability of infrastructure and services. Staged Subdivision Works Certificates and staged Subdivision Certificates can define different lot and road groupings provided infrastructure and services are provided. • Integrated Development – General Terms of Approval The following General Terms of Approval, as…

Condition 23 DA0190/22 det. 07/12/2022 Educational Establishment

23. Traffic Management Plan A detailed Traffic Management Plan must be submitted to the Certifier prior to the issue of the Construction Certificate indicating how construction vehicles will safely enter and exit the site in a practical manner whilst minimising any negative effects on the surrounding roads and community. The Traffic Management Plan must include the following: a) construction access to the site is to be solely from Collith Avenue / Tasman Place; b) the proposed method of loading and unloading excavation and construction machinery, excavation and building materials, formwork and the erection of any part of the structure within the site; c) all loaded vehicles entering or…

DA0266/23 det. 15/12/2023

Condition reason: 12 Works within the Road Reserve To undertake works within the road reserve approval under section 138 of the Roads Act 1993 must be obtained from Council for local and regional roads or from TFNSW for State roads. Note: private accredited certifiers do not have any authority to issue engineering approvals or carry out inspections for works on public roads under the Roads Act 1993 Condition reason: Statutory requirement 13 Internal Roads – Design Requirements All provisions for internal roads must comply with the Planning for Bush Fire Protection 2019 (or be otherwise supported by the Rural Fires Service in a Bushfire Safety Authority), Section 3.1.1 of the Jacaranda…

Condition 27 DA0190/22 det. 07/12/2022 Educational Establishment

27. Section 307 Compliance Certificates - Council Infrastructure (Water Supply and Sewerage) The applicant is required to apply to Council (as the infrastructure authority) under Section 305 of the Water Management Act 2000 for a Section 307 Compliance Certificate (issued under the Water Management Act 2000). Prior to the issue of any Construction Certificate either a Section 306 ‘Notice of Requirements’ or a Section 307 Compliance Certificate under the Water Management Act 2000 must be provided to the Accredited Certifier. Notes: Application forms and other related documents associated with connection to Council’s sewer are available at Council website:…

Condition 24 DA0190/22 det. 07/12/2022 Educational Establishment

24. Traffic Control Plan A Traffic Control Plan prepared in accordance with the Roads and Maritime Services publication ‘Traffic Control at Worksites’ is to be prepared by an appropriately qualified person and submitted to Council, prior to commencement of any works, for approval. Where the site adjoins a Roads and Maritime Service controlled road, the Traffic Management Plan is to be approved by Roads and Maritime Services before submission to Council for approval. Details demonstrating compliance with these requirements are to be submitted to the Certifier prior to the issue of the Construction Certificate.

Condition 1 DA0190/22 det. 07/12/2022 Educational Establishment

1. Integrated Development - General Terms of Approval The general terms of approval from the following Authorities, as referred to in Section 4.47(2) of the Environmental Planning and Assessment Act 1979, and referenced below, are attached and form part of the consent conditions for this approval: a) NSW Rural Fire Service - The General Terms of Approval, Reference DA20220704009053- Original-1 and dated 29 November 2022 are attached and form part of this consent.

Condition 43 DA0190/22 det. 07/12/2022 Educational Establishment

43. Bushfire Construction Requirements – NSW Rural Fire Service The development approved under this consent must comply with the conditions numbered 1, 2, 3, 4, 5, 6 and 7 of the NSW Rural Fire Service General Terms of Approval, Reference DA20220704009053-Original-1, dated 29 November 2022. Details demonstrating compliance with the above must be provided to the Certifying Authority prior to the issue of a Construction Certificate.

Condition 3

3. Bushfire Risk Positioning of the proposed building has allowed for the creation of an APZ with minimum vegetation removal. However, around 0.38ha of native vegetation is required be managed as an IPA. The application was referred to Rural Fire Service and General Terms of Approval have issued. If complied with those terms of approval are expected to suitably address bushfire risk.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.