Hawkesbury Operational Noise Conditions

6 operational noise conditions imposed by Hawkesbury across 3 development applications in our dataset. Operational noise conditions limit noise from a development once it is in use — acoustic reports, plant and equipment noise limits, restricted hours of operation and mechanical ventilation noise.

Condition 58 DA0190/22 det. 07/12/2022 Educational Establishment

58. Demolition - General All demolition works must be carried out in accordance with the following: a) all demolition work must be carried out strictly in accordance with Australian Standard AS 2601 - 'The Demolition of Structures'; b) demolition works involving the removal and disposal of asbestos cement must only be undertaken by contractors who hold a current SafeWork NSW 'Demolition License' and an appropriate SafeWork NSW Asbestos License and comply with SafeWork NSW Code of Practice ‘How to Safely Remove Asbestos’; c) site safety/security fencing must be provided prior to commencement of any work on- site and must be removed only when all hazards, including site waste, have been…

DA0092/22 det. 29/05/2023

• Assessment of the negative effects of runoff from disturbed areas on local waterways during storm events specifically looking at the size of disturbed areas, volume of runoff, the amount of both coarse and fine material carried by runoff and the size of receiving waterway. • Recommendations to the maximum area of disturbed area that should be permitted at any one time in order safeguard local waterways from permanent adverse effects during construction. Vibration Management All plant and equipment to be used or installed on the premises must comply with the vibration limits specified in ‘Assessing Vibration: A Technical Guideline’ prepared by the NSW Environment Protection Authority, at…

DA0266/23 det. 15/12/2023

Condition reason: To protect local amenity. 59 Vibration Impacts All plant and equipment to be used or installed on the premises must comply with the vibration limits specified in 'Assessing Vibration: a technical guideline' prepared by the NSW Environment Protection Authority at the boundary of any affected receiver. A certificate from an appropriately qualified person must be submitted to the Principal Certifier prior to the commencement of work, certifying that all plant and equipment on the site, together with the proposed plant and equipment, will comply with the requirements of this condition.. Condition reason: To protect local amenity. 60 Demolition – General All demolition works…

Condition 45 DA0190/22 det. 07/12/2022 Educational Establishment

45. Compliance with Acoustic Report Any new noise generating equipment such as air-conditioning plant shall be selected so as to comply with the noise levels in Table 5.1 of Acoustic DA Report - Bede Polding College, Windsor (Ref: ID: 113CED R01v2) by PKA Acoustic Consulting dated 26 May 2022. Details demonstrating compliance with these requirements must be submitted to the Certifier prior to the issue of the Construction Certificate.

Condition 100 DA0190/22 det. 07/12/2022 Educational Establishment

100. Waste Generation All waste generated on the site is to be stored, handled and disposed of in such a manner as to not create air pollution (including odour), offensive noise or pollution of land and/or water as defined by the Protection of the Environment Operations Act 1997.

Condition 99 DA0190/22 det. 07/12/2022 Educational Establishment

99. Neighbourhood Amenity Any activity associated with the operation of the educational establishment shall not give rise to offensive noise, air pollution (including odour) or pollution of land and/or water as defined by the Protection of the Environment Operations Act 1997.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.