Hawkesbury Demolition Conditions

9 demolition conditions imposed by Hawkesbury across 3 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

Condition 61 DA0190/22 det. 07/12/2022 Educational Establishment

61. Asbestos Removal Works (a) All works removing asbestos containing materials must be carried out by a suitably licensed asbestos removalist duly licensed with Safework NSW, holding either a Friable (Class A) or a Non- Friable (Class B) Asbestos Removal Licence which ever applies. A copy of the relevant licence shall be made available to any authorised Council officer on request within 24 hours. (b) Five days prior to the commencement of licensed asbestos removal, Safework NSW must be formally notified of the works. All adjoining properties and those opposite the development must be notified in writing of the dates and times when asbestos removal is to be conducted. The notification must…

Condition 69 DA0190/22 det. 07/12/2022 Educational Establishment

69. Site Management During Construction The following requirements relating to site management apply during and immediately following construction: a) All materials and equipment must be stored wholly within the work site unless an approval to store them elsewhere is held. b) Waste materials (including excavation, demolition and construction waste materials) must be managed on the site and then disposed of at a waste management facility. c) Copies of receipts stating the following must be given to the Principal Certifier: (i) the place to which waste materials were transported; (ii) the name of the contractor transporting the materials; and (iii) the quantity of materials transported…

Condition 10 DA0190/22 det. 07/12/2022 Educational Establishment

10. Asbestos Removal If asbestos containing materials are encountered during construction or demolition work; measures must be in place in accordance with SafeWork NSW guidelines and the Occupational Health & Safety Regulation 2001. Work must not commence or continue until all the necessary safeguards required by SafeWork NSW are fully in place. In accordance with Safework NSW requirements, a SafeWork NSW licensed Asbestos Removalist is to be engaged to undertake asbestos removal. Prior to commencing demolition of buildings likely to comprise asbestos containing material(ACM), a commercially manufactured sign containing the words ’DANGER ASBESTOS REMOVAL IN PROGRESS’ measuring 400mm x 300mm…

Condition 62 DA0190/22 det. 07/12/2022 Educational Establishment

62. Asbestos Material Handling Work involving bonded asbestos removal work (of an area of more than 10 square metres) or friable asbestos removal work must be undertaken by a person who carries on a business of such removal work in accordance with a licence under Clause 458 of the Work Health and Safety Regulation 2017. In addition to the above, the following must be satisfied: a) the person having the benefit of this consent must provide the Principal Certifier with a copy of a signed contract with such a person before any development or works commence; b) any such contract must indicate whether any bonded asbestos material or friable asbestos material will be removed, and if so, must…

DA0266/23 det. 15/12/2023

• Contamination management strategy. • Road hierarchy plan. • Vegetation management plan. This consent endorses the documents submitted and approved, however the delivery of further development in accordance with this masterplan is to be the subject of subsequent development applications. This consent only approves the following stage 1 works: • Demolition of all structures on the site and all improvements to the land within precincts C & D. • Demolition of all poultry sheds within precinct B. • Dewatering of all dams on the site except the small dam along Currency Creek within precinct D. • Remediation works. • Bulk earthworks including the precinct A lake. • Removal of trees and…

DA0092/22 det. 29/05/2023

Waste Management Plan A Waste Management Plan is required to be prepared: a) identifying all waste (including excavation, demolition and construction waste materials) that will be generated by the work on the site; b) identifying the quantity of waste material to be: (i) reused onsite; (ii) recycled onsite and off-site; (iii) disposed of off-site; c) if waste materials are to be reused or recycled onsite – specify how the waste material will be reused or recycled onsite; and d) if waste materials are to be disposed of or recycled off-site – specify the contractor who will be transporting the materials and the waste facility or recycling outlet to which the materials will be taken. Garbage…

Condition 59 DA0190/22 det. 07/12/2022 Educational Establishment

59. Demolition - Notice a) Notice is to be given to Council of the date on which it is proposed to commence demolition. This notice must: (i) be given not less than two days before the date on which it is proposed to commence demolition work; (ii) provide details of the name, contact details of the demolisher/contractor undertaking the work; (iii) provide the relevant SafeWork NSW License details of the demolisher/contractor; and (iv) details of the demolisher/contractors current Public Liability/Risk Insurance Policy providing for a minimum cover of $10 million. b) Notice is to be given to adjoining property owners of the date on which it is proposed to commence demolition. This notice…

Condition 56 DA0190/22 det. 07/12/2022 Educational Establishment

56. Principal Certifier Site Sign A sign must be erected in a prominent position on any site on which building work, subdivision work or demolition work is being carried out: a) showing the name, address and telephone number of the Principal Certifier for the work; b) showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours; and c) stating that unauthorised entry to the work site is prohibited. Any such sign is to be maintained while the building work, subdivision work or demolition work is being carried out, but must be removed when the work has been completed.

Condition 63 DA0190/22 det. 07/12/2022 Educational Establishment

63. Demolition - Work Plans The demolition work must comply with the provisions of Australian Standard AS 2601 - 'The Demolition of Structures'. The work plans required by Australian Standard AS 2601 - 'The Demolition of Structures' must be accompanied by a written statement from a suitably qualified person that the proposals contained in the work plan comply with the safety requirements of the Standard. The work plans and the statement of compliance must be submitted and be to the satisfaction of the Principal Certifier prior to the commencement of works.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.