9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

North Sydney Bushfire Protection Conditions

4 bushfire protection conditions imposed by North Sydney across 2 development applications in our dataset. Bushfire protection conditions apply to bushfire-prone land — asset protection zones (APZ), Bushfire Attack Level (BAL) construction standards, dedicated water supply for firefighting and emergency access.

Condition 3 DA

3. Business Items The North Sydney Local Planning Panel is a NSW Government mandated Local Planning Panel exercising the functions of North Sydney Council, as the Consent Authority, under Section 4.8(2) of the Environmental Planning and Assessment Act, 1979 as amended, and acts pursuant to a Direction of the Minister for Planning issued under Section 9.1 of the Act, dated 23 February 2018. The Panel has considered the following Business Items and resolves to determine each matter as described within these minutes. NORTH SYDNEY LOCAL PLANNING PANEL – 03/12/2025 Page No 2 ITEM 1 DA No: DA 289/25 (PAN-566279) ADDRESS: 22 Chuter Street, McMahons Point PROPOSAL: Demolition of existing dwelling…

Condition 4 DA 392/22 det. 06/02/2025 Mixed-use Development

4. Cross Sectional Drawings showing the showing the relationship of the proposed development with respect to TAHE land/easements and the operational rail corridor. The drawings must include the rail corridor, sub soil profile, proposed basement excavation and/or structural design of sub ground support, and above- ground building (including balconies). All measurements are to be verified by a Registered Surveyor.

Condition 4 DA 392/22 det. 06/02/2025 Mixed-use Development

4. Cross Sectional Drawings showing the showing the relationship of the proposed development with respect to TAHE land/easements and the operational rail corridor. The drawings must include the rail corridor, sub soil profile, proposed basement excavation and/or structural design of sub ground support, and above- ground building (including balconies). All measurements are to be verified by a Registered Surveyor.

Condition 4 DA

4. Add an additional condition is to be imposed requiring deletion of the rooftop safety balustrade. Panel Reason: The Panel based its decision on the following reasons:

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.