9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Lake Macquarie Heritage Conservation Conditions

6 heritage conservation conditions imposed by Lake Macquarie across 5 development applications in our dataset. Heritage conservation conditions protect items and areas of heritage significance — heritage impact statements, archival photographic recording, conservation works and use of sympathetic materials.

DA/2630/2022 det. 22/05/2023

• Formwork inspection (hold point) • Pre pour inspections for pavement and pathways (hold point) • Installation of tactile ground surface indicators as per manufacturers recommendations • Review of works as executed with LMCC Senior Project Officer (Civil) prior to landscape compliance report sign off (hold point). • Archaeological test excavation The person having the benefit of the consent shall ensure that archaeological test excavation is carried out in accordance with the Code of Practice for Archaeological Investigation of Aboriginal Objects in New South Wales, as identified in the Aboriginal Cultural Heritage Assessment Report by Heritage Now dated 10/11/2022. A copy of the result of…

DA/1651/2022/A det. 10/12/2025

Review of works as executed with LMCC Senior Project Officer (Civil) prior to landscape compliance report sign off (hold point). Filling Importation and Compaction Prior to works commencing, documentary evidence shall be provided to Council demonstrating the proposed fill material is either: Virgin excavated natural material (VENM) as defined under the provisions of the NSW Protection of the Environment Operations Act 1997; or The material is from a known origin and composition, free of contamination from manufactured chemicals, process residues, building debris, sulfidic ores, or other foreign matter; or Fill which has been characterised and validated by a suitably qualified and…

DA/1288/2023 det. 27/03/2024

General Conditions Table 1 - Response 1 Erosion and sediment control plan Before site work commences, an erosion and sediment control plan must be prepared by a suitably qualified person in accordance with the following documents and provided to Council for approval: a. Council’s relevant development control plan, b. the guidelines set out in 'Managing Urban Stormwater: Soils and Construction’ prepared by Landcom (the Blue Book) (as amended from time to time), and c. the ‘Do it Right On-Site, Soil and Water Management for the Construction Industry' (Southern Sydney Regional Organisation of Councils and the Natural Heritage Trust) (as amended from time to time). Condition reason: To ensure…

DA/2087/2018/REV det. 20/12/2023

Landscape Plans (Ref: 1671 Rev E), Moir Landscape Architecture, 27 April 2023, Rev E Preliminary Geotechnical Assessment by Qualtest dated 19 November 2018, Rev 0, reference NEW18P-0178A-AB. Addendum to Preliminary Geotechnical Assessment by Qualtest dated 7 June 2019, reference NEW18P-0178A-AD. Detailed Contamination Assessment by Qualtest dated 16 November 2018, Rev 1, reference NEW18P-0178A-AA. Remediation Action Plan by Qualtest dated 25 January 2023, Rev 2, reference NEW18P-0178A-Acv2. Conservation Management Plan by ERM dated 22 August 2017, reference 0408695RP01_Final03. Aboriginal Cultural Heritage Management Plan by McCardle Cultural Heritage Pty Ltd dated 17 November 2015, Report…

DA/2294/2021/A det. 03/11/2025

Plans shall be certified as being designed in accordance with the approved Acoustic Report reference 212129-9347-R2 prepared by Spectrum Acoustics dated 20 August 2021. Washbay Construction and Operation Plans shall be submitted demonstrating the vehicle wash bay is roofed or covered and the floor area bunded, graded and drained to a suitable floor sump. In sewered areas plans shall be submitted demonstrating the vehicle wash bay/s shall be installed in accordance with Hunter Water Corporation requirements. In unsewered areas, plans shall be submitted demonstrating the vehicle wash bay wastewater is directed from a coalescing plate separator to an approved pump out facility for collection…

DA/1288/2023 det. 27/03/2024

Thanks for providing the amended dra(cid:332) condi(cid:415)ons of consent in response to our comments from yesterday. We have considered the proposed changes and confirm that the dra(cid:332) condi(cid:415)ons of consent are acceptable. Appreciate your assistance with this ma(cid:425)er. Feel free to contact me if any issues. Kind regards, Heath Dennerley Senior Environmental Planner, Heritage, Environment and Planning NSW Public Works M 0400560094 E heath.dennerley@pwa.nsw.gov.au From: Rhiannon McLardy <rmclardy@lakemac.nsw.gov.au> Sent: Thursday, 30 November 2023 5:06 PM To: Heath Dennerley <heath.dennerley@pwa.nsw.gov.au> Cc: Mark Lyndon <mark.lyndon@pwa.nsw.gov.au> Subject: Amended…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.