Lake Macquarie Contamination Conditions

6 contamination conditions imposed by Lake Macquarie across 6 development applications in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.

DA/2087/2018/REV det. 20/12/2023

Extension of the left turn bay on Thomas Street. The Applicant is responsible for constructing the upgrades listed at (b) to (f) above at its own cost and must consult with the relevant roads authority in relation to the design of the works and obtain all necessary approvals prior to carrying out the works. The Applicant may be required to enter into an agreement with the relevant roads authority in relation to the upgrades listed at (b) to (f) (including a Works Authorisation Deed where TfNSW is the relevant roads authority) prior to the issue of a Subdivision Works Certificate for the first residential lot in any relevant stage (i.e. Stages 17, 18, 22, 23, 24, 25, 26, 27, 28, 29, or 30).…

DA/2294/2021/A det. 03/11/2025

Water NSW – General Terms of Approval (Modification A) Reference Number: S4551163340 Dewatering GT0115-00001 Groundwater must only be pumped or extracted for the purpose of temporary construction dewatering at the site identified in the development application. For clarity, the purpose for which this approval is granted is only for dewatering that is required for the construction phase of the development and not for any dewatering that is required once construction is completed. GT0119-00001 All extracted groundwater must be discharged from the site in accordance with Council requirements for stormwater drainage or in accordance with any applicable trade waste agreement. GT0120-00001 The…

DA/2630/2022 det. 22/05/2023

Any liquid gaseous wastes, emissions or odours shall be controlled and disposed of in accordance with the NSW Protection of the Environment Operations Act 1997 and Regulations 1997, as amended. Where it is proposed to treat and discharge waters to the Hunter Water Corporations Sewer, formal approval from the Corporation shall be obtained. • Emissions There shall be no interference with the amenity of the neighbourhood by reason of the emission of any "offensive noise" as defined in the Protection of the Environment Operations Act 1997, vibration, smell, fumes, smoke, vapour, steam, soot, ash or dust, or otherwise as a result of the development. • Medical / Pathology Waste Any contaminated…

DA/1651/2022/A det. 10/12/2025

Installation of tactile ground surface indicators as per manufacturers recommendations Review of works as executed with LMCC Senior Project Officer (Civil) prior to landscape compliance report sign off (hold point). Filling Importation and Compaction Prior to works commencing, documentary evidence shall be provided to Council demonstrating the proposed fill material is either: Virgin excavated natural material (VENM) as defined under the provisions of the NSW Protection of the Environment Operations Act 1997; or The material is from a known origin and composition, free of contamination from manufactured chemicals, process residues, building debris, sulfidic ores, or other foreign matter; or…

DA/1288/2023 det. 27/03/2024

Condition reason: To ensure appropriate notice is given 13 On Site Sewerage Management – Prior to Works Submit an overview of the decommissioning of all On-Site Sewerage Management Systems on the site. The scope is to include details of the removal of effluent liquor and sludge / grease in tanks and traps in addition to the remediation of soil within disposal areas (if applicable areas exist). Condition reason: To ensure on-site sewerage is decommissioned appropriately 14 Demolition Waste Management Plan Prior to work commencing on-site, a demolition waste management plan, prepared in accordance with the Lake Macquarie City Council Development Control Plan 2014, shall be submitted to and…

Condition 29 DA/430/2021/A det. 26/09/2023 Waste and Resource Management Facility - Change of Use

29. Screening of waste (Modification A) Waste being brought to the site shall be screened for waste classification prior to acceptance. Any loads containing waste not conforming to the category “General Solid Waste (non-putrescible)” or “Special Waste (Tyres)”as defined by the NSW Environment Protection Authority Waste Classification Guidelines – Part 1: Classification of Waste shall be rejected and shall not be processed through this facility.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.