Lake Macquarie Parking Conditions

5 parking conditions imposed by Lake Macquarie across 4 development applications in our dataset. Parking conditions specify the number, layout and management of car, motorcycle, bicycle and accessible parking spaces, loading bays, and how parking is allocated and signposted.

Condition 4 DA/2630/2022 det. 22/05/2023 Health Services Facility

4. Fit-out and Use of Level 1 and Level 4 Prior to any occupation of Level 1 and/or Level 4 as identified by approved architectural plans prepared by Archadia Projects, Project No. A106 issue 3.2 dated May 2023, consent shall be obtained for the fit-out and any variation to the health services facility. Intent of Condition 4 The submitted plans and documentation indicated fit-outs of level 1 and 4 are subject to a separate application. Condition 4 was imposed to control the future fit-out of level 1 and 4 which had been considered as a medical centre and hospital respectively, which fall under the parent term of a health services facility. The condition became equally important to ensure…

DA/2087/2018/REV det. 20/12/2023

Maximum grades for sealed roads do not exceed 15 degrees and an average grade of not more than 10 degrees or other gradient specified by road design standards, whichever is the lesser gradient. There is a minimum vertical clearance to a height of 4 metres above the road at all times. The capacity of road surfaces and bridges is sufficient to carry fully loaded fire fighting vehicles (approximately 15 tonnes for areas with reticulated water, 28 tonnes or 9 tonnes per axle for all other areas). Bridges clearly indicate load rating. Public roads greater than 6.5 metres wide locate hydrants outside of parking reserves to ensure accessibility to reticulated water supply for fire suppression.…

DA/2630/2022 det. 22/05/2023

Where street trees cannot be retained, street trees shall be replaced at a rate and with species approved by Council’s Natural Assets section. • Geotechnical Report Compliance The recommendations of the Geotechnical Report Reference 210780 prepared by Douglas Partners dated 18 November 2022 shall be complied with. Any works undertaken in relation to the development shall embody all relevant recommendations of the Geotechnical Report. The engineering plans shall be certified as being designed in accordance with the approved Geotechnical Report. • Parking Areas and Access Ways A design plan for parking areas and access ways shall be submitted. The design shall include pavement design,…

DA/1651/2022/A det. 10/12/2025

Hunter Water Requirements The person with the benefit of this consent shall comply with Hunter Water’s requirements to provide the development with water supply and sewerage services. A copy of Hunter Water’s compliance certificate (Hunter Water Act 1991- Sect 50) shall be submitted with your Occupation Certificate application. Operational Conditions The person having the benefit of the consent shall comply with each of the following conditions during the operation of the development. Use and Allocation of Car Parking The car parking provided shall only be used in conjunction with the uses contained within the development and except as provided for in these conditions, shall not be used…

DA/2294/2021/A det. 03/11/2025

Washbay Construction and Operation Plans shall be submitted demonstrating the vehicle wash bay is roofed or covered and the floor area bunded, graded and drained to a suitable floor sump. In sewered areas plans shall be submitted demonstrating the vehicle wash bay/s shall be installed in accordance with Hunter Water Corporation requirements. In unsewered areas, plans shall be submitted demonstrating the vehicle wash bay wastewater is directed from a coalescing plate separator to an approved pump out facility for collection and disposal by a NSW Office of Environment and Heritage licensed waste removal contractor. Electric vehicle charging (Modification A) At least 5% of the parking spaces…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.