Lake Macquarie Stormwater Conditions
5 stormwater conditions imposed by Lake Macquarie across 5 development applications in our dataset. Stormwater conditions control how a development collects, detains and discharges rainwater runoff — on-site detention (OSD), drainage easements, water-sensitive urban design and connection to council drainage systems.
An updated traffic assessment, including microsimulation modelling, may be required by the relevant roads authority prior to its approval of any upgrade works. The roads authority may agree to works that differ from the above list of works, if those alternative works are considered more appropriate at the time based on the updated traffic assessment. Agreement with roads authority prior to the issue of a Subdivision Works Certificate for stages 17, 18, 22, 23, 24, 25, 26, 27, 28, 29, or 30 Prior to the issue of any subdivision works certificate for stages 17, 18, 22, 23, 24, 25, 26, 27, 28, 29, or 30 (excluding any certificate relating only to bulk earthworks or remediation), the Applicant…
Conditions to be satisfied prior to the issue of the Construction Certificate The person having the benefit of the consent shall comply with each of the following conditions prior to the issue of a Construction Certificate. Any documentation required to be submitted for the Construction Certificate shall be submitted to the Certifying Authority unless otherwise specified. • Construction Certificate Prior to the commencement of building work a Construction Certificate shall be obtained. • Stormwater Disposal - Stormwater Detention and Harvesting A Stormwater Management Plan shall be submitted. The plan shall be generally in accordance with the plans approved by the Development Consent…
Reference Number: S4551163340 Dewatering GT0115-00001 Groundwater must only be pumped or extracted for the purpose of temporary construction dewatering at the site identified in the development application. For clarity, the purpose for which this approval is granted is only for dewatering that is required for the construction phase of the development and not for any dewatering that is required once construction is completed. GT0119-00001 All extracted groundwater must be discharged from the site in accordance with Council requirements for stormwater drainage or in accordance with any applicable trade waste agreement. GT0120-00001 The design and construction of the building must prevent:…
Earthworks methodologies; Haulage routes; Retaining structure construction methodologies; Concrete jointing methodologies; Subsoil drainage installation methodologies; Stormwater drainage infrastructure installation methodologies; Stormwater Quality Improvement Device installation methodologies; Road construction methodologies; Accessways and footway construction methodologies; Landscaping installation methodologies; Utility and services installation methodologies Construction and installation methodologies of other structures not otherwise covered above. All works on site shall be undertaken in accordance with the approved CMP. Notice of Commencement of Works within the Public Domain…
Conditions of Consent - DA/1288/2023 General Conditions Table 1 - Response 1 Erosion and sediment control plan Before site work commences, an erosion and sediment control plan must be prepared by a suitably qualified person in accordance with the following documents and provided to Council for approval: a. Council’s relevant development control plan, b. the guidelines set out in 'Managing Urban Stormwater: Soils and Construction’ prepared by Landcom (the Blue Book) (as amended from time to time), and c. the ‘Do it Right On-Site, Soil and Water Management for the Construction Industry' (Southern Sydney Regional Organisation of Councils and the Natural Heritage Trust) (as amended from time to…
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Stormwater conditions in other councils
Lane Cove
139 conditions
Cumberland
136 conditions
Wollongong
116 conditions
Willoughby
101 conditions
Burwood
80 conditions
Ku-ring-gai
78 conditions
Bayside
75 conditions
Georges River
53 conditions
Waverley
50 conditions
Campbelltown
45 conditions
Fairfield
45 conditions
Camden
38 conditions
Newcastle
36 conditions
Sutherland
36 conditions
City of Parramatta
35 conditions
City of Ryde
34 conditions
Hornsby
34 conditions
Strathfield
30 conditions
Randwick
27 conditions
Canterbury-Bankstown
24 conditions
Inner West
24 conditions
Wollondilly
20 conditions
Canada Bay
15 conditions
Mosman
15 conditions
Hawkesbury
13 conditions
Northern Beaches
12 conditions
City of Sydney
10 conditions
North Sydney
8 conditions
Liverpool
7 conditions
Blue Mountains
7 conditions
Woollahra
4 conditions