Lake Macquarie Flood Management Conditions

3 flood management conditions imposed by Lake Macquarie across 3 development applications in our dataset. Flood management conditions address building on flood-prone land — minimum habitable floor levels, flood-compatible materials and construction, evacuation planning and protection of overland flow paths.

DA/2294/2021/A det. 03/11/2025

Where street trees cannot be retained, street trees shall be replaced at a rate and with species approved by Council’s Natural Assets section. To obtain the Roads Act 1993 s138 approval, an application for Minor Public Works shall be made to Council. Application can be made via Council’s website. Stormwater Disposal and Harvesting (Modification A) A Stormwater Management and Harvesting Plan shall be submitted. The plan shall be generally in accordance with the plans approved by the Development Consent prepared by Northrop Engineers, Ref: NL183048-01 Rev. B dated 29/09/2025. The stormwater plans approved by this development consent are not approved for construction. The stormwater plans…

DA/2087/2018/REV det. 20/12/2023

AS2890 - Off Street Parking Catchments and Creeks Pty Ltd documents (www.catchmentandcreeks.com.au) Rock sizing for Multi-Pipe and Culvert Outlets (August 2017) Rock sizing for single pipe outlets (April 2015) Where any inconsistency exists between these documents the relevant standard to be adopted shall be verified in writing with Council. Show Lots Clear of 100 Year Flood Level Stormwater designs and calculations shall be submitted to show that all lots are clear of the 1:100 year flood level. This condition shall also apply to lots which would be affected by substantial overland flow, which may necessitate the carrying out of works to ensure properly drained and flood free conditions.…

DA/2630/2022 det. 22/05/2023

Any documentation required to be submitted for the Construction Certificate shall be submitted to the Certifying Authority unless otherwise specified. • Construction Certificate Prior to the commencement of building work a Construction Certificate shall be obtained. • Stormwater Disposal - Stormwater Detention and Harvesting A Stormwater Management Plan shall be submitted. The plan shall be generally in accordance with the plans approved by the Development Consent prepared by Northrop, Ref: NL211248 dated 19.04.2023. The stormwater plans approved by this development consent are not approved for construction. The stormwater plans shall comply with the following: • Stormwater shall be…