9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Wollondilly Operational Noise Conditions

4 operational noise conditions imposed by Wollondilly across 2 development applications in our dataset. Operational noise conditions limit noise from a development once it is in use — acoustic reports, plant and equipment noise limits, restricted hours of operation and mechanical ventilation noise.

DA/2021/305/1 det. 11/03/2022

• Arboricultural Impact Assessment– Rev 1.1 – Quality Tree Services – 16 November 2020 • Picton Cultural, Community and Civic Precinct Stage 1 - Aboriginal Archaeological Due Diligence Assessment– Rev 02 – Ecological – 23 November 2020 • Access Report - Building E1 - New Performing Arts Centre - Rev A – Access Consulting – 29 March 2021 • New Performing Arts Centre– Rev A – Access Consulting – 29 March 2021 • Environmental Acoustic Assessment Building E1: Performing Arts Centre – Rev 01 – Marshall Day Acoustics – 13 April 2021 • Civil Design Report –Rev 03 - WSP – 20 September 2021 • Detailed Site Investigation –Rev 01 - SMEC – 29 September 2021 • Fire Safety Strategy Report – Omni…

DA/2021/305/1 det. 11/03/2022

 Picton Cultural, Community and Civic Precinct Stage 1 - Aboriginal Archaeological Due Diligence Assessment– Rev 02 – Ecological – 23 November 2020  Access Report - Building E1 - New Performing Arts Centre - Rev A – Access Consulting – 29 March 2021  New Performing Arts Centre– Rev A – Access Consulting – 29 March 2021  Environmental Acoustic Assessment Building E1: Performing Arts Centre – Rev 01 – Marshall Day Acoustics – 13 April 2021  Civil Design Report –Rev 03 - WSP – 20 September 2021  Detailed Site Investigation –Rev 01 - SMEC – 29 September 2021  Fire Safety Strategy Report – Omni Consulting Fire Engineers – 26 March 2020  Geotechnical Investigation – Douglas Partners – Rev…

Condition 60 DA/2025/239/1 det. 24/10/2025 New Sports Precinct at Wollondilly Anglican College

60. Offensive Noise POEO Act The person(s) having the benefit of this consent is advised that Council reserves the right to restrict the days and hours of operation of specific activities if considered necessary to prevent the emission of an “offensive noise” as defined in the Protection of the Environment Operations Act, 1997. Offensive Noise means noise: a) That by reason of its level, nature, character or quality or the time at which it is made, or any other circumstances: i. Is harmful to (or is likely to be harmful to) a person who is outside the premises from which it is emitted; or ii. Interferes unreasonably with (or is likely to interfere unreasonably with) the comfort or repose of…

Condition 9 DA/2025/239/1 det. 24/10/2025 New Sports Precinct at Wollondilly Anglican College

9. Acoustic Report Development shall take place in accordance with the submitted Acoustic Report titled ‘Noise Impact Assessment – WAC Sports Precinct’ prepared by Rodney Stevens Acoustics, reference R241055R1 and dated 1 July 2025, except as modified by Council and/or any conditions of this consent. Condition reason: To protect the amenity of the local area.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.