Flood Management Conditions
Flood management conditions address building on flood-prone land — minimum habitable floor levels, flood-compatible materials and construction, evacuation planning and protection of overland flow paths.
286
Conditions
32
Councils
105
DAs
Flood Management conditions by council
Willoughby
34 conditions
Wollongong
30 conditions
Cumberland
29 conditions
Bayside
25 conditions
City of Ryde
15 conditions
Ku-ring-gai
15 conditions
Burwood
13 conditions
Sutherland
12 conditions
Canterbury-Bankstown
11 conditions
Campbelltown
11 conditions
Hawkesbury
11 conditions
City of Parramatta
9 conditions
Camden
9 conditions
Waverley
7 conditions
Fairfield
6 conditions
Newcastle
6 conditions
Randwick
6 conditions
Canada Bay
5 conditions
Hornsby
5 conditions
Inner West
4 conditions
Woollahra
4 conditions
Lake Macquarie
3 conditions
Penrith
3 conditions
City of Sydney
2 conditions
Central Coast
2 conditions
Blue Mountains
2 conditions
Wollondilly
2 conditions
Georges River
1 conditions
North Sydney
1 conditions
Strathfield
1 conditions
Lane Cove
1 conditions
Mosman
1 conditions
Example flood management conditions
209. Universal Council Key/Access. Where there is a lockable door to access a bin room or hardwaste storage room, the universal Council key should be installed so the contractor can access the room for servicing bins or collect the household cleanup items. Where there will be secure access in place to the loading dock area, a lock box accessed by the Council universal key must be provided on the outside of the roller shutter doors. The building access fob will be housed in…
50. Stormwater Drainage & Flood Management The site stormwater drainage system is to be provided in accordance with the following requirements; a) The stormwater drainage system must be provided in accordance with the relevant requirements of Building Code of Australia and the conditions of this consent, to the satisfaction of the Principal Certifier and details are to be included in the Stage 2 construction certificate. i. The stormwater must be discharged (by gravity)…
1. Approved development Development must be carried out in accordance with the following approved plans and documents, except where the conditions of this consent expressly require otherwise. Drawing Title Drawing No/Ref Issue/Revision Author Dated STAGE 1 - DA 23-034-DA-01-C010 - Infrastructure 08.07.2025 DRAWINGS & Development Consulting GENERAL 23034DA01C100 D Infrastructure 08.07.2025 ARRANGEMENT & PLAN Development Consulting NOTES AND 23-034-DA-01-C105 D…
6. A garbage container with a tight-fitting lid. Condition reason: To protect workers, the public and the environment. 29 Hours of Work Demolition work must only be carried out between the following times: For building work, demolition or vegetation removal from 7:00am to 5:00pm on Monday to Saturday. No works to be carried out on Sunday and public holidays. Site work is not to be carried out outside of these times except where there is an emergency, or for urgent work…
2. Approved Plans and Supporting Documentation The development must be carried out in accordance with the approved plans and supporting documentation listed below which have been endorsed by Council's approved stamp, except where amended in red on the plans and/or amended by other conditions of consent: a) Plans Reference: Drawing Drawing Description Prepared by Issue Date Ref. No. No. DA02 Overall Site Plan DTA Architects DA04 24/11/22 DA03 A-Site Plan DTA Architects DA01…
19. STORMWATER MANAGEMENT To ensure that stormwater runoff from the development is drained in an appropriate manner, without impact to neighbouring properties and downstream systems, a detailed plan and certification of the development’s stormwater management system must be submitted and approved by Council’s Executive Manager, Infrastructure Services (or delegate) prior to the issue of the relevant Construction Certificate. The submitted civil drawings prepared by Warren…
12. DACCA01 - Amendments to Approved Plans Amended plans/documents shall be submitted to the Council or registered certifier prior to the issue of a Construction Certificate to address the following matters: Design of privacy screens to “Open Hallways” The design of privacy screens situated along the “Open Hallways” on the Ground Floor Level and Level 1 of the building shall comprise fixed angled louvres to ensure view lines are redirected away from the neighbouring property…
13. Submit the Following Information to Willoughby City Council Prior to the lodgement of an application for a construction certificate, the applicant shall submit plans and specifications satisfying the following requirements to Willoughby City Council for approval. Documentation confirming approval by Willoughby City Council shall then be submitted to the Certifier for the application of a construction certificate. (a) Detailed stormwater plans for the site that include…
88. Works as executed plans for stormwater management 88. Works as executed plans for stormwater management To enable the Condition to be satisfied prior to the issue of and disposal and disposal the ‘relevant’ Occupation Certificate and enable the Prior to issue of any Occupation Certificate, a registered Prior to issue of any the relevant Occupation Certificate, a flexibility to provide staged Occupation Certificates. surveyor must provide a works as executed survey of the…
32. Adjacent to Easement Sites located adjacent to Council’s drainage easement and/or sites affected by flooding shall comply with the following: a. The proposed building(s) including eaves and gutters shall be located clear of existing and proposed Council easements within the site. Plans demonstrating this requirement are to be submitted to the certifier before the issue of the relevant construction certificate. All approved construction details shall be consistent with…
Snippets shown for reference. Always verify against the original consent on the NSW Planning Portal.
Search all Flood Management conditions
Filter by council, keyword or DA.