Newcastle Flood Management Conditions
6 flood management conditions imposed by Newcastle across 3 development applications in our dataset. Flood management conditions address building on flood-prone land — minimum habitable floor levels, flood-compatible materials and construction, evacuation planning and protection of overland flow paths.
6. The proposed floodlighting of the premises is to be designed, positioned, and installed, including appropriate shielding and orientation of the lighting fixture, as to not give rise to obtrusive light, interfere with traffic safety or detract from the amenity of surrounding properties in accordance with Australian Standard 4282:1997 - Control of the obtrusive effects of outdoor lighting. Full details are to be included in the documentation for a Construction Certificate application.
6. The proposed floodlighting of the premises is to be designed, positioned, and installed, including appropriate shielding and orientation of the lighting fixture, as to not give rise to obtrusive light, interfere with traffic safety or detract from the amenity of surrounding properties in accordance with Australian Standard 4282:1997 - Control of the obtrusive effects of outdoor lighting. Full details are to be included in the documentation for a Construction Certificate application.
59. Flooding - caution signage Before the issue of an occupation certificate, a clear warning notice is to be erected and maintained at all points of entry to the site advising, that the premises is subject to flooding and that caution should be observed at times of heavy or prolonged rainfall. Such notice is to also provide advice regarding the availability of further information sources in respect of possible flooding. Condition reason: to protect the public from floodwaters.
65. Development applications for each stage shall be accompanied by a Stormwater Management Plan which includes details of connections to the existing drainage infrastructure, any infrastructure upgrades and details of stormwater harvesting for re- use within the development. Calculations to show the stormwater harvesting volumes proposed to meet the requirements of NDCP 2012 for retention volume shall also be detailed on the plans. Flood Mitigation
19. Flooding - verifying floor levels Before the issue of a construction certificate, full details are to be provided demonstrating that the floor level of all proposed buildings or building additions are to be no lower than 3.6 m Australian Height Datum. Condition reason: to require verification of proposed floor level heights.
67. A flood assessment prepared by a qualified hydraulic engineer shall accompany the development application for each stage of the project. Surrender of consent
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Flood Management conditions in other councils
Willoughby
34 conditions
Wollongong
30 conditions
Cumberland
29 conditions
Bayside
25 conditions
City of Ryde
15 conditions
Ku-ring-gai
15 conditions
Burwood
13 conditions
Sutherland
12 conditions
Canterbury-Bankstown
11 conditions
Campbelltown
11 conditions
Hawkesbury
11 conditions
City of Parramatta
9 conditions
Camden
9 conditions
Waverley
7 conditions
Fairfield
6 conditions
Randwick
6 conditions
Canada Bay
5 conditions
Hornsby
5 conditions
Inner West
4 conditions
Woollahra
4 conditions
Lake Macquarie
3 conditions
Penrith
3 conditions