Stormwater Conditions
Stormwater conditions control how a development collects, detains and discharges rainwater runoff — on-site detention (OSD), drainage easements, water-sensitive urban design and connection to council drainage systems.
1,357
Conditions
35
Councils
168
DAs
Stormwater conditions by council
Lane Cove
139 conditions
Cumberland
136 conditions
Wollongong
116 conditions
Willoughby
101 conditions
Burwood
80 conditions
Ku-ring-gai
78 conditions
Bayside
75 conditions
Georges River
53 conditions
Waverley
50 conditions
Campbelltown
45 conditions
Fairfield
45 conditions
Camden
38 conditions
Newcastle
36 conditions
Sutherland
36 conditions
City of Parramatta
35 conditions
City of Ryde
34 conditions
Hornsby
34 conditions
Strathfield
30 conditions
Randwick
27 conditions
Canterbury-Bankstown
24 conditions
Inner West
24 conditions
Wollondilly
20 conditions
Canada Bay
15 conditions
Mosman
15 conditions
Hawkesbury
13 conditions
Northern Beaches
12 conditions
City of Sydney
10 conditions
North Sydney
8 conditions
Liverpool
7 conditions
Blue Mountains
7 conditions
Lake Macquarie
5 conditions
Woollahra
4 conditions
Penrith
2 conditions
Hunters Hill
2 conditions
Central Coast
1 conditions
Example stormwater conditions
113. Existing Ausgrid easements, leases and/or right of ways must be maintained at all times to ensure 24 hour access. No temporary or permanent alterations to this property tenure can occur without written approval from Ausgrid. For further details refer to Ausgrid’s Network Standard 143. (Reason: Ausgrid conditions to ensure due consideration to the compatibility of the proposed development with existing Ausgrid infrastructure) Dilapidation Report Damage to Public…
5. Inspect the works as they progress at frequencies determined by the geotechnical engineer (where necessary). The professional recommendations shall be implemented in full during the relevant stages of excavation and construction. Note: A failure by contractors to adequately assess and seek professional engineering (geotechnical) advice to ensure that appropriate underpinning and support to adjoining land is maintained prior to commencement may result in damage to…
3. DAGCZ01 - Modification of Development Consent 2022/0776 Development consent 2024/0331 relating to 1/4-4A Terminal Place, part 5 and part 7 McLeod Road Merrylands amends and changes various aspects of development consent DA2022/0776. Pursuant to Section 4.17(1)(b) of the Environmental Planning and Assessment Act 1979, development consent 2022/0776 relating to 1/4-4A Terminal Place, part 5 and part 7 McLeod Road Merrylands must be modified in the following manner: The…
1. Shared use Pathways on the sub arterial road (Road 108) must be increased to a minimum 3.0 metres wide. Condition reason: To ensure compliance with WGA DCP 2021 Council Comment Landcom Comment Council had previously understood that the applicant Regarding the shared path in the sub-arterial road, our had agreed to 3m sharepaths as per request for intent with the last RFI response was to ensure 2.5m shared information (RFI) response dated 8 September 2023 paths on either…
2. A.3 - Payment of security deposits (if applicable) Before the commencement of any works on the site or the issue of the relevant construction certificate, the applicant must make all of the following payments to Council and provide written evidence of these payments to the Certifier: Security Deposit Type Amount Refunded post OC if deemed satisfactory by Council Infrastructure Damage Bond $24,000.00 Yes Inspection Fee: $210 per visit $2,100.00 No Civil Reconstruction Work…
1. Approved Plans and Supporting Documentation Development must be carried out in accordance with the following approved plans and supporting documentation (stamped by Council), except where the conditions of this consent: Revision Plan No.: Plan Title: Prepared By: Date: No.: Architectural Plans MA000 8 Cover Sheet Level 33 27/02/2025 MA010 8 Summary Level 33 27/02/2025 MA011 5 Unit Schedule Level 33 16/01/2025 MA020 5 GFA Diagrams Level 33 16/01/2025 MA021 5 GFA Diagrams…
2. The approved plans must be lodged to Sydney Water Tap In to determine whether the development will affect Sydney Water’s sewer and water mains, storm water drains and/or easements, and if further requirements need to be met. Item 0.0 Page 43 Plans will be appropriately stamped. For the Sydney Water Tap In Service details please refer to the web site www.sydneywater.com.au or telephone 13 20 92. Landscaping Conditions 42) Tree planting in accordance with Australian…
106. Final inspection – Works as Executed plans Prior to Council or the appointed Principal Certifier issuing an Subdivision Certificate, the applicant shall submit to Council a copy of a work as executed plan, certified by a qualified surveyor, which has been prepared in accordance with the requirements detailed in Council's Specification for Construction of Subdivisional Road and Drainage Works (as amended) and Engineering Design for Development (as amended) guide.…
66. Community Centre Completion (Mod B) The approved community centre/Leisure Centre for the retirement village must be completed and operational. CONDITIONS OF CONCURRENCE - TRANSPORT FOR NSW (LETTER DATED 17 OCTOBER 2011) The following conditions of consent are from the nominated State Agency pursuant to Section 4.13 of the Environmental Planning and Assessment Act 1979 and must be complied with to the satisfaction of that Agency. 66A. TfNSW Condition 1 (Mod C) The…
71. The Street Tree Specifications for the Detailed Public Domain Construction Drawings are as follows: Botanical name Common Name Pot Quantity Spacing size Angophora Rough-barked 200L 15 Average floribunda Apple 8m Banksia Coastal Banksia 200L 2 As drawn integrifolia Buckinghamia Ivory Curl Tree 200L 10 As drawn celsissima Corymbia Lemon Scented 200L 9 As drawn citriodora Gum ‘Scentuous’ Corymbia Spotted Gum 200L 8 As drawn maculata Cupaniopsis Tuckeroo 200L 9 As drawn…
Snippets shown for reference. Always verify against the original consent on the NSW Planning Portal.
Search all Stormwater conditions