Tree Management Conditions
Tree management conditions protect existing vegetation and require replacement planting — tree protection zones, arborist supervision, approved tree removals, root protection and landscaping.
692
Conditions
33
Councils
137
DAs
Tree Management conditions by council
Ku-ring-gai
93 conditions
Wollongong
77 conditions
Lane Cove
69 conditions
Cumberland
45 conditions
Hornsby
37 conditions
Bayside
35 conditions
Sutherland
32 conditions
Georges River
30 conditions
Inner West
30 conditions
Willoughby
29 conditions
Camden
26 conditions
City of Ryde
23 conditions
Burwood
19 conditions
Newcastle
18 conditions
City of Parramatta
13 conditions
Fairfield
13 conditions
Waverley
12 conditions
Strathfield
11 conditions
Wollondilly
11 conditions
Canterbury-Bankstown
10 conditions
Campbelltown
9 conditions
Canada Bay
8 conditions
Blue Mountains
8 conditions
Hawkesbury
7 conditions
Randwick
6 conditions
Mosman
6 conditions
Lake Macquarie
4 conditions
City of Sydney
3 conditions
Liverpool
3 conditions
North Sydney
2 conditions
Central Coast
1 conditions
Northern Beaches
1 conditions
Woollahra
1 conditions
Example tree management conditions
2. Compliance is required with Condition 6 of this consent. Condition reason: To ensure compliance with the affordable housing provisions in the Housing SEPP. 132 Storage Prior to issue of the whole of building Occupation Certificate, storage areas are to be provided in accordance with minimum requirements of the Apartment Design Guide (ADG) and generally as shown in the approved plans. Storage areas in the basement are to be secure areas (e.g. in mesh cage areas) for the…
3. No encroachment is to occur into public open space. Reason: To ensure works are contained wholly within the subject site. E.26 – Special condition – Stockpiling of Materials No stockpiling of materials, building equipment or additional activities listed in section 4.2 of AS4970-2009 The Protection of trees on Development Sites is to occur within designated tree protection areas or on the Council Owned Nature Strip. All building materials must be stored within the subject…
70. All lighting features in the public domain shall be detailed in the Public Domain Construction Documentation in accordance with the following requirements. Confirmation that existing street lighting levels in Shirley Street meet AS1158 requirements accounting for the impact of development uplift and land use changes. New poles and streetlights are to be coordinated on CC drawings as required. Luminaires to be LED. Street lighting for the internal road and Link Park is to…
2. Verify that any water management basins have been completed in accordance with the approved plans and provide the following details: a. Levels and dimensions to verify the storage volume of any water management facilities. b. Levels and other relevant dimensions of: OFFICIAL i. Internal drainage pipes. ii. Orifice plates. iii. Outlet control devices and pits. iv. Weirs (including widths). c. Verification that the orifice plates have been fitted and the diameter of the…
2. DAGCA02 - Approved Plans and Supporting Documents The development must be carried out in accordance with the following endorsed plans and documents, except as otherwise provided by the conditions of this consent. Reference/Dwg No Title/Description Prepared By Date/s DA-B-00-0000 Rev F Cover Sheet and PTW 24/02/2025 Drawing List DA-B-00-0002 Rev F Development Data PTW 24/02/2025 Sheet 1/2 DA-B-00-0003 Rev D Development Data PTW 24/02/2025 Sheet 2/2 DA-B-10-0070 Rev D…
56. TREE PROTECTION Precautions shall be taken when working near trees to ensure their retention, including the following: (a) Do not store harmful or bulk materials or spoil under or near trees; (b) Prevent damage to bark and root system; (c) Do not use mechanical methods to excavate within root zones; (d) Do not add or remove topsoil from under the drip line; (e) Do not compact ground under the drip line; (f) Do not mix or dispose of liquids within the drip line of the…
1. The Clause 4.6 written request to the exceedance of the Height of Buildings development standard in clause 4.3 of the North Sydney Local Environmental Plan 2013 (“the LEP”) does not demonstrate that compliance with the development standard was unnecessary or unreasonable in the circumstances of the case or that the written request identified sufficient environmental planning grounds to justify the contravention. Voting was as follows: Panel Member Yes No Community…
55. Public Domain Improvements – Design for Construction Certificate. This consent does not approve any public domain works outside of the site. The public domain is to be upgraded in the Terry Road frontage of the development site in generally in accordance with approved landscape plans, to plans and specifications that are to the Council’s satisfaction. The works shall include the undergrounding of powerlines shall along the Terry Road frontage of the site (in accordance…
93. Final Landscape Plan Requirements The submission of a final Landscape Plan to the Principal Certifying Authority, prior to the release of the Construction Certificate. The final Landscape Plan shall address the following requirements: • Further detail is required to address the maintenance protocol to undertake maintenance of the green roof areas/planting on podium/mass planting beds within 2m of a building edge where the fall height is greater than 1m to identify and…
24. Works near Trees (Mod B & C) All required tree protection measures are to be maintained in accordance with AS 4373-2009 (Section.4) for the duration of the construction period for all stages of the development. All construction works within the Tree Protection Zones (TPZ) of trees T51, T52, T53 & Tree Group B must be conducted under the supervision of the Project Arborist. The construction work area within a TPZ must not exceed 20% of the TPZ, and an area equivalent to…
Snippets shown for reference. Always verify against the original consent on the NSW Planning Portal.
Search all Tree Management conditions
Filter by council, keyword or DA.