Fairfield Flood Management Conditions

6 flood management conditions imposed by Fairfield across 4 development applications in our dataset. Flood management conditions address building on flood-prone land — minimum habitable floor levels, flood-compatible materials and construction, evacuation planning and protection of overland flow paths.

Condition 1 DA 250.1/2024 det. 11/09/2025 Resource Transfer Station

1. Approved Plans and Supporting Documentation Development must be carried out in accordance with the following approved plans and supporting documentation (stamped by Council), except where the conditions of this consent expressly require otherwise. Plan No. : Revision No. : Plan Title : Drawn By : Date : DA01 C Cover Sheet Lime Architects 29.05.2025 DA02 C Site Plan Lime Architects 29.05.2025 DA03 C Existing Ground Plan Lime Architects 29.02.2025 DA04 C Operations Ground Plan Lime Architects 29.05.2025 DA05 C Elevations Lime Architects 29.05.2025 DA06 C Landscape Plan Lime Architects 29.05.2025 Plan Title Drawn By Plan No Revision No Date BCA Design Compliance Report MBC Group 25000083 01…

Condition 70 DA 69.1/2024 det. 17/03/2025 Amending DA to mixed use development (PAN-415907)

70. On Site Detention System Registration – Works-As-Executed On completion of the drainage works and prior to the relevant Occupation Certificate, Works- As-Executed plans certified by a Registered Surveyor are to be submitted to the Certifying Authority to verify that the drainage works have been completed in accordance with the approved plans. The following details are to be on the Works-As-Executed plans and shall be marked in red on a copy of the original plan approved at the Construction Certificate stage. a. Sufficient levels and dimensions to verify the On-Site Detention storage volumes. b. Location and surface levels of all drainage pits, weir levels and dimensions. c. Invert…

Condition 33 DA 3.1/2024 det. 11/11/2024 Waste or resource transfer station

33. Flood Affected Development The development the subject of this consent is located within flood prone land. The following shall be complied with during the construction process: Page 11 of 15 ATTACHMENT R a. Only flood resistant materials shall be used below the designated floor level. b. All services and utilities connected to the property are required to be flood proofed. c. There is to be no alteration to the existing ground levels. d. A flood evacuation plan prepared by a qualified consultant shall be kept within the premises. Reason: To ensure the safety of occupants and to ensure the development is carried out in accordance with flood prone land requirements.

Condition 37 DA 43.1/2025 det. 13/08/2025 Karitane Redevelopment

37. Flood Affected Development The development the subject of this consent is located within flood prone land. The following shall be complied with during the construction process: a. Only flood resistant materials shall be used below the designated floor level. b. All services and utilities connected to the property are required to be flood proofed. c. There is to be no alteration to the existing ground levels. d. A Flood Evacuation Plan prepared by a suitably qualified consultant shall be kept within the premises. Reason: To ensure the safety of occupants and to ensure the development is carried out in accordance with flood prone land requirements.

Condition 58 DA 69.1/2024 det. 17/03/2025 Amending DA to mixed use development (PAN-415907)

58. Flood Affected Development The development the subject of this consent is located within flood prone land. The following shall be complied with during the construction process: a. Only flood resistant materials shall be used below the designated floor level. b. All services and utilities connected to the property are required to be flood proofed. c. There is to be no alteration to the existing ground levels. d. A Flood Evacuation Plan prepared by a qualified Consultant shall be kept within the premises. Reason: To ensure the safety of occupants and to ensure the development is carried out in accordance with flood prone land requirements.

Condition 34 DA 3.1/2024 det. 11/11/2024 Waste or resource transfer station

34. Flood Affected Development The development the subject of this consent is located within flood prone land, affected by the Probable Maximum Flood (PMF). The following shall be complied with during the construction process: a. There is to be no alteration to the existing ground levels. b. A flood evacuation plan prepared by a qualified consultant shall be kept within the premises. Reason: To ensure the safety of occupants and to ensure the development is carried out in accordance with flood prone land requirements.