Newcastle Waste Management Conditions

7 waste management conditions imposed by Newcastle across 4 development applications in our dataset. Waste management conditions cover how waste is stored, collected and minimised — waste management plans, bin storage rooms, recycling provision and access for collection vehicles.

Condition 53 DA2023/01154 det. 18/03/2025 Residential flat building

53. Public infrastructure - rectification of damage Before the issue of the first occupation certificate for the development (i.e., whether for part or whole of a building), any public infrastructure (including all public footways, foot paving, kerbs, gutters and road pavement) damaged during the works (including damage caused by, but not limited to, delivery vehicles, waste collection, contractors, sub-contractors, concreting vehicles) are to be immediately fully repaired following the damage, to a condition that provides for safe use by pedestrians and vehicles, to the written satisfaction of Council, and at no cost to Council. Condition reason: to ensure rectification of any damage to…

Condition 69 DA2023/01154 det. 18/03/2025 Residential flat building

69. Public infrastructure - rectification of damage Before the issue of an occupation certificate, any public infrastructure (including all public footways, foot paving, kerbs, gutters and road pavement) damaged during the works (including damage caused by, but not limited to, delivery vehicles, waste collection, contractors, sub-contractors, concreting vehicles) are to be immediately fully repaired following the damage, to a condition that provides for safe use by pedestrians and vehicles, to the written satisfaction of Council, and at no cost to Council. Condition reason: to ensure rectification of any damage to public infrastructure. COMPLETION AND ONGOING USE Condition

Condition 39 DA2024/00151 det. 25/03/2025 Affordable housing residential flat building

39. Public infrastructure - rectification of damage Prior to occupation of the development, any public infrastructure (including all public footways, foot paving, kerbs, gutters and road pavement) damaged during the works (including damage caused by, but not limited to, delivery vehicles, waste collection, contractors, sub-contractors, concreting vehicles) are to be immediately fully repaired following the damage, to a condition that provides for safe use by pedestrians and vehicles, to the written satisfaction of Council, and at no cost to Council. Condition reason: to ensure rectification of any damage to public infrastructure.

Condition 72 DA2023/01154 det. 18/03/2025 Residential flat building

72. Waste management operation - storage areas During occupation and ongoing use, waste management (recyclable and non-recyclable) is to be collected from the refuse storage areas, as identified on the approved plans, serviced and returned immediately to the refuse storage areas. Under no circumstances are garbage bins to be presented to the kerb for collection. Condition reason: to require appropriate use of waste storage areas.

Condition 47 DA2024/00151 det. 25/03/2025 Affordable housing residential flat building

47. Waste management operation - storage areas During occupation and ongoing use, waste management (recyclable and non-recyclable) is to be collected from the refuse storage areas, as identified on the approved plans, serviced and returned immediately to the refuse storage areas. Under no circumstances are garbage bins to be presented to the kerb for collection. Condition reason: to require appropriate use of waste storage areas.

Condition 120 MA2023/00221 det. 02/04/2024 Sec 4.55(2) Modification to DA2019/01169

120. Waste collection from the proposed development being restricted to between 7:00am and 6:00pm daily.

Condition 120 MA2024/00381 det. 14/07/2025 Sec 4.55 (2) Modification to DA2019/01169

120. Waste collection from the proposed development being restricted to between 7:00am and 6:00pm daily.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.