North Sydney Construction Management Conditions
5 construction management conditions imposed by North Sydney across 5 development applications in our dataset. Construction management conditions govern how building work is carried out — construction management plans, approved work hours, site fencing and hoarding, dust and noise control, and protection of public roads and infrastructure.
DA.38) prepared by Brick Architects and dated 3 February 2025, unless otherwise modified by Council in writing. Substitution of materials must not be undertaken, except where otherwise approved in writing by Council. (Reason: To ensure that the form of the development undertaken is in accordance with the determination of Council, Public Information) The issue of Construction Certificates shall be staged as follows: A4. CC1 – Site Preparation and Demolition: This Construction Certificate shall include works for site set-up, strip out, disconnection and demolition of above ground building fabric and structure and services only (excluding any excavation or demolition of below ground services…
(Reason: To ensure residential amenity is maintained in the immediate vicinity) Noise and Vibration • All works must be undertaken in accordance with the “Interim Construction Noise Guideline” published by the Department of Environment and Climate Change NSW dated July 2009, to ensure excessive levels of noise and vibration do not occur so as to minimise adverse effects experienced on any adjoining land. (Reason: To ensure residential amenity is maintained in the immediate vicinity) Compliance with Construction Noise Management Plan • All works conducted on site which form part of this development must be carried out in accordance with the submitted Construction Noise Management Plan…
T5 & T6 Platanus x acerifolia (20x16m) council verge in front of 20 Berry Street - (Berry St frontage) 20x16m Minor pruning only shall be permitted. No more than 10% of canopy shall be removed. Hoardings/scaffolding shall be designed so as to minimse the need for any pruning and shall be installed under supervision of project arborist. Marked up pictures of proposed pruning shall be provided to council’s Landscape Development Officer for approval prior to any pruning being permitted. A report detailing the measures to be employed during works authorised by this consent shall be submitted to Council and the Principal Certifier for approval prior to the issue of any Construction Certificate.…
1. If, in complying with this condition, amendments to the development are required, the design changes must be submitted for the approval of Council prior to a Construction Certificate being RE: 100 CHRISTIE STREET, ST LEONARDS DEVELOPMENT CONSENT NO. 392/22 Page 26 of 68 issued. Approval of a modification application may be required.
1. The Principal Certifier issuing the relevant Construction Certificate has no power to remove the requirements to upgrade the existing building as required by this condition.
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Construction Management conditions in other councils
Cumberland
138 conditions
Burwood
129 conditions
Willoughby
95 conditions
Wollongong
95 conditions
City of Parramatta
82 conditions
Ku-ring-gai
79 conditions
Bayside
68 conditions
Lane Cove
64 conditions
Fairfield
60 conditions
City of Ryde
51 conditions
Sutherland
40 conditions
Waverley
40 conditions
City of Sydney
39 conditions
Campbelltown
38 conditions
Canterbury-Bankstown
35 conditions
Randwick
35 conditions
Newcastle
32 conditions
Inner West
31 conditions
Hornsby
30 conditions
Strathfield
23 conditions
Georges River
22 conditions
Hawkesbury
19 conditions
Wollondilly
15 conditions
Camden
12 conditions
Blue Mountains
12 conditions
Mosman
9 conditions
Liverpool
7 conditions
Woollahra
6 conditions
Canada Bay
5 conditions
Lake Macquarie
5 conditions
Central Coast
4 conditions