9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

North Sydney Stormwater Conditions

8 stormwater conditions imposed by North Sydney across 5 development applications in our dataset. Stormwater conditions control how a development collects, detains and discharges rainwater runoff — on-site detention (OSD), drainage easements, water-sensitive urban design and connection to council drainage systems.

Condition 113 DA34/2025 det. 21/07/2025 Demolition and adaptive reuse

113. Existing Ausgrid easements, leases and/or right of ways must be maintained at all times to ensure 24 hour access. No temporary or permanent alterations to this property tenure can occur without written approval from Ausgrid. For further details refer to Ausgrid’s Network Standard 143. (Reason: Ausgrid conditions to ensure due consideration to the compatibility of the proposed development with existing Ausgrid infrastructure) Dilapidation Report Damage to Public Infrastructure C3. A dilapidation survey and report (including photographic record) must be prepared by a suitably qualified consultant which details the predeveloped condition of the existing public infrastructure in the…

Condition 3 DA34/2025 det. 21/07/2025 Demolition and adaptive reuse

3. Enquiries regarding making an application for an “unjustifiable hardship exemption” under the accessibility standards can be made with the Building Commission NSW. (Reason: To ensure the provision of equitable and dignified access for all people in ATTACHMENT A – 8 WEST STREET, NORTH SYDNEY DEVELOPMENT APPLICATION NO. 34/25 Page 29 of 58 accordance with disability discrimination legislation and relevant Australian Standards) Privacy C43. The following privacy amendments are to be provided: i. The podium planter on the northern side boundary of the common open space and the north western Unit 0105 on Level 1 is to be landscaped with suitable screening species capable 3.0 metres above the…

Condition 1

1. To modify Conditions A1, C13, C32, C33, C34, G14 and I2 as follows: Development in accordance with Plans/Documentation (D132/23/2) A1. The development must be carried out in accordance with the following drawings and documentation and endorsed with Council’s approval stamp, except where amended by the following conditions of this consent. Plan Nos. Title Prepared by Dated Rev S4.55.01 Rev A Site Analysis Plan Mathieson 8 August 2025 S4.55.02 Rev A Lower Ground Floor Mathieson 8 August 2025 S4.55.03 Rev A Ground Floor Mathieson 8 August 2025 S4.55.04 Rev A Level 1 Mathieson 8 August 2025 S4.55.05 Rev A Level 2 Mathieson 8 August 2025 S4.55.06 Rev A Roof Plan Mathieson 8 August 2025…

Condition 2 DA34/2025 det. 21/07/2025 Demolition and adaptive reuse

2. Following application, a ‘Notice of Requirements’ will be forwarded detailing water and sewer extensions to be built and charges to be paid. Please make early contact with the Coordinator since building of water/sewer extensions can be time consuming and may impact on other services and building, driveway or landscape design. (Reason: To ensure compliance with Sydney Water requirements) Release of Strata Certificate K4. The Strata Certificate that authorises registration of the Strata Plan, Strata Plan of Subdivision or Notice of Conversion at NSW Land Registry Services shall not be issued until bounding walls, floors and ceilings between proposed strata lots have been constructed in…

350/24 det. 26/09/2025

(Reason: To ensure the proper management of contaminated land) Transport for NSW • A) Detailed design plans and hydraulic calculations of any changes to the stormwater drainage system that impact upon Berry Street and/or the Pacific Highway are to be submitted to TfNSW for approval, prior to the issue of a Construction Certificate and commencement of any works. Please send all documentation to development.sydney@transport.nsw.gov.au. A plan checking fee will be payable, and a performance bond may be required before TfNSW approval is issued. B) Any public utility adjustment/relocation works on the state road network will require detailed civil design plans for road opening /underboring to be…

DA258/2023 det. 15/05/2025

The following must be complied with at all times: (a) Materials must not be burnt on the site. (b) Vehicles entering and leaving the site with soil or fill material must be covered. (c) Dust suppression measures must be carried out to minimise wind-borne emissions in accordance with the NSW Department of Housing’s 1998 guidelines - Managing Urban Stormwater: Soils and Construction. (d) Odour suppression measures must also be carried out where appropriate so as to prevent nuisance occurring at adjoining properties. (Reason: To ensure residential amenity is maintained in the immediate vicinity) Noise and Vibration • All works must be undertaken in accordance with the “Interim Construction…

Condition 1 DA387/2024 det. 29/09/2025 Alterations and Additions for the Purpose of a Commercial Office Building

1. All buildings and structures together with any improvements integral to the future use of the site (apart from any kerb and gutter replacement, stormwater/drainage works, and required public utility works) are to be wholly within the freehold property unlimited in height or depth along the Pacific Highway boundary

Condition 1 DA387/2024 det. 29/09/2025 Alterations and Additions for the Purpose of a Commercial Office Building

1. All buildings and structures together with any improvements integral to the future use of the site (apart from any kerb and gutter replacement, stormwater/drainage works, and required public utility works) are to be wholly within the freehold property unlimited in height or depth along the Pacific Highway boundary

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.