Waverley Heritage Conservation Conditions
8 heritage conservation conditions imposed by Waverley across 3 development applications in our dataset. Heritage conservation conditions protect items and areas of heritage significance — heritage impact statements, archival photographic recording, conservation works and use of sympathetic materials.
29. DILAPIDATION REPORT Before any site work commences, a dilapidation report must be prepared by a suitably qualified engineer detailing the structural condition of adjoining buildings, structures or works and public land to the satisfaction of the Principal Certifying Authority. At minimum, the following building is to be included: (a) Heritage Item 4571740 – Sewerage pumping station, which is a Sydney Water Asset. Where access has not been granted to an adjoining property to prepare the dilapidation report, the report must be based on a survey of what can be observed externally and demonstrate, in writing, to the satisfaction of the Principal Certifying Authority that all reasonable…
49. BONDI - ROSE BAY SAND BODY This site may be located within the Bondi - Rose Bay Sand Body as identified in Council’s Aboriginal Cultural Heritage Study 2009. After demolition of the existing building and prior to any excavation, a suitably qualified archaeologist must inspect the site to determine if the site needs further investigation. Should an object of potential Aboriginal or archaeological significance be discovered during the demolition, excavation or construction period associated with this development, works are to immediately cease and the NSW National Parks and Wildlife Service must be contacted. Waverley Council must be notified of any referral to the NSW National Parks and…
9. BONDI - ROSE BAY SAND BODY This site may be located within the Bondi - Rose Bay Sand Body as identified in Council’s Aboriginal Cultural Heritage Study 2009. Should an object of potential Aboriginal or archaeological significance be discovered during the demolition, excavation or construction period associated with this development, works are to immediately cease and the NSW National Parks and Wildlife Service must be contacted. Waverley Council must be notified of any referral to the NSW National Parks and Wildlife Service and be provided with a copy of any subsequent response.
32. HERITAGE NSW CONDITIONS A S140 permit from the Heritage Council of NSW is required for archaeological monitoring prior to commencement of any site works. The application to ‘Heritage NSW’ must include an archaeological assessment report, archaeological research design, excavation methodology, prepared by a suitably qualified person. The application shall also nominate an appropriately qualified excavation director. Condition reason: To ensure the appropriate approvals are obtained from Heritage NSW.
36. HERITAGE NSW CONDITIONS A S140 permit from the Heritage Council of NSW is required for archaeological monitoring prior to commencement of any site works. The application to ‘Heritage NSW’ must include an archaeological assessment report, archaeological research design, excavation methodology, prepared by a suitably qualified person. The application shall also nominate an appropriately qualified excavation director. Condition reason: To ensure the appropriate approvals are obtained from Heritage NSW.
58. PEST CONTROL A Pest and Vermin Control Management Plan (PVCMP) is to be submitted for the approval of Council’s Executive Manager, Compliance (or delegate) prior to the issue of an Occupation Certificate. All recommendations within the PVCMP are to be implemented with the ongoing operations of the premises. Condition reason: To reduce and control pests and vermin.
63. PEST CONTROL A Pest and Vermin Control Management Plan (PVCMP) is to be submitted for the approval of Council’s Executive Manager, Compliance (or delegate) prior to the issue of an Occupation Certificate. All recommendations within the PVCMP are to be implemented with the ongoing operations of the premises. Condition reason: To reduce and control pests and vermin.
81. PEST CONTROL A Pest and Vermin Control Management Plan (PVCMP) is to be submitted for the approval of Council’s Executive Manager, Compliance (or delegate) prior to the issue of an Occupation Certificate. All recommendations within the PVCMP are to be implemented with the ongoing operations of the premises. VEHICLE ACCESS AND PARKING
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Heritage Conservation conditions in other councils
Inner West
34 conditions
Wollongong
27 conditions
Hornsby
17 conditions
Camden
16 conditions
Sutherland
16 conditions
Newcastle
15 conditions
Lane Cove
15 conditions
Strathfield
13 conditions
City of Ryde
12 conditions
Blue Mountains
11 conditions
City of Sydney
8 conditions
Willoughby
8 conditions
Burwood
7 conditions
Canada Bay
7 conditions
North Sydney
7 conditions
Randwick
7 conditions
Canterbury-Bankstown
6 conditions
Central Coast
6 conditions
Lake Macquarie
6 conditions
City of Parramatta
5 conditions
Campbelltown
5 conditions
Fairfield
5 conditions
Hawkesbury
5 conditions
Ku-ring-gai
5 conditions
Wollondilly
5 conditions
Woollahra
5 conditions