Waverley Contamination Conditions
24 contamination conditions imposed by Waverley across 4 development applications in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.
137. WASTE STORAGE AREAS • The proposal must have a bin storage point for a minimum; • Residential (90 88 residential units) • 9 x 660L Mobile Garbage Bins (MGBs) for general waste compacted at 2:1 collected weekly • 6 x 660L MGB for container recycling collected fortnightly • 6 x 660L MGB for paper and cardboard recycling collected fortnightly • Residential bulky waste storage of 11m2 in addition to 2m2 for additional problem waste (13m2 total) • Commercial – (Restaurant and Office space) • 8 x 660L Mobile Garbage Bins (MGBs) for general waste collected 3 x weekly • 2 x 660L MGB for comingled recycling collected 3 x weekly • Extra space for the storage of excess waste, bulk cardboard, and…
101. ELECTRIC VEHICLE CHARGING POINTS A minimum of 2 ‘Level 2’ AC fast electric vehicle charging points are to be installed. They are to be located so that it can be accessed from a visitor parking space. All resident car spaces must be ‘EV Ready’ and provided a dedicated circuit with a minimum current of 16A and cable storage for each parking space with power demand management system to enable all circuits to be used simultaneously. Electrical circuit have capacity to deliver a minimum 15 kWh between 11pm-7am. All visitor car spaces require an EV charger with a 3-phase - 32A connection as a minimum. Electrical circuit have capacity to deliver a minimum 15 kWh between 9am-5pm. ADVISORY…
31. STORMWATER AND PUBLIC INFRASTRUCTURE MANAGEMENT To ensure that stormwater runoff from the development is drained in an appropriate manner, without impact to neighbouring properties and downstream systems, a detailed plan and certification of the development’s stormwater management system must be submitted and approved by the Executive Manager, Infrastructure Services (or delegate) prior to the issue of the relevant Construction Certificate. The submitted stormwater management plan prepared by Mance Arraj Engineering Pty Ltd, Project No. 7102-DA, Drawing No. SW001, SW010, SW011, SW020, SW030, SW031, SW032, SW040, SW050, SW060, SW070 Issue B, dated 05/12/2023 are considered concept only.…
4. PUBLIC DOMAIN IMPROVEMENTS The public domain is to be upgraded on Curlewis Street frontage for the development site in accordance with the current Waverley Council Development Control Plan (DCP) and Public Domain Technical Manual (PDTM) at the time of engineering plan approval. These works are to be designed in conjunction with Council’s Curlewis Street Streetscape Upgrade works planned for 2023/2024 financial year. A public domain plan for the following works shall be submitted to Council, and approved by the Executive Manager, Infrastructure Services (or delegate) prior to the issue of the relevant Construction Certificate. • Vehicular crossing; • Street tree planting and landscaping;…
32. STORMWATER AND PUBLIC INFRASTRUCTURE MANAGEMENT To ensure that stormwater runoff from the development is drained in an appropriate manner, without impact on neighbouring properties and downstream systems, a detailed plan and certification of the development’s stormwater management system must be submitted and approved by the Executive Manager, Infrastructure Services (or delegate) prior to the issue of the relevant Construction Certificate. The submitted stormwater management plan prepared by Enscape Studio, Project No. 0333, Drawing No. C-01 Rev. A, C-05 Rev. A, C-10 Rev. B, C-11 Rev. C, C-12 Rev. C, C-13 Rev. C, C-14 Rev. A, C-15 Rev. C, C-16 Rev. A dated 08/07/2024 are considered…
13. PLANNING AGREEMENT After a Development Application has been approved with a Planning Agreements, the legal agreement must be drafted by Council, exhibited and endorsed by Council prior to fulfilling the requirements of the DA condition. This process will take a minimum of 4 months, so please contact the Strategic Town Planning team (email strategictownplanning@waverley.nsw.gov.au) at least 4 months before you intend to obtain the relevant Construction Certificate associated with the VPAs under this DA to commence the process. DA-22/2024 Dictionary The following terms have the following meanings for the purpose of this determination (except where the context clearly indicates otherwise):…
13. PUBLIC ART DA-455/2022 42 Specific details and design of the proposed public art features shall be undertaken with Council's Cultural Development Officer. DA-455/2022 43 Dictionary The following terms have the following meanings for the purpose of this determination (except where the context clearly indicates otherwise): Approved plans and documents means the plans and documents endorsed by the consent authority, a copy of which is included in this notice of determination. AS means Australian Standard published by Standards Australia International Limited and means the current standard which applies at the time the consent is issued. Building work means any physical activity involved in…
1. APPROVED PLANS AND DOCUMENTATION The development must be in accordance with: (a) Architectural Plans prepared by PBD Architects of Project No: 2223 including the following: Plan Number Plan description Plan Date Date received by and Revision Council DA098 Rev. P L Basement 02 Floor Plan 8/7/24 2/8/24 01/05/2025 23/05/2025 DA099 Rev. P L Basement 01 Floor Plan 8/7/24 2/8/24 01/05/2025 23/05/2025 DA100 Rev. V S Ground Floor Plan 18/9/24 18/9/24 01/05/2025 23/05/2025 DA101 Rev. R M Level 01 Plan 8/7/24 2/8/24 30/04/2025 23/05/2025 DA102 Rev. Q M Level 02 Plan 8/7/24 2/8/24 01/05/2025 23/05/2025 DA103 Rev. P M Level 03 Plan 8/7/24 2/8/24 30/04/2025 23/05/2025 DA104 Rev. S N Roof Plan 29/7/24…
47. GEOTECHNICAL RISK MANAGEMENT The following geotechnical risk management measures must be followed: (a) The applicant must comply with all the requirements stipulated in the Geotechnical Investigation Report prepared by Geo-environment engineering, Proposed Seniors Living Development 671 – 683 Old South Head Road, Vaucluse NSW Prepared for OSHR at Vaucluse Holdings Pty Ltd, Report ID: G21071VAU-R01F, dated 8 October 2021. (b) A qualified Geotechnical Engineer and/or Structural Engineer must be engaged to review the full detailed design including the temporary and permanent excavation, and shoring support systems. This review and findings must be submitted to the Principle Certifying…
80. PLAN OF MANAGEMENT - WASTE AND RECYCLING STORAGE A Waste Management Plan must be submitted to Council’s Executive Manager, Environmental Sustainability (or delegate) and include the following where relevant: (a) All arrangements including relevant and current contracts for recyclables and all other waste (collection and disposal) (b) The waste storage area and bins must be cleaned and maintained regularly with appropriate lighting. (c) The role and responsibility of managing composting facilities (if provided). (d) Clear signage identifying the different bin types and storage area for bulky household waste and problem waste must be displayed. (e) The recycling bins must be placed…
47. REMEDIATION REQUIREMENTS The following requirements apply to the remediation works required on-site: (a) A sign displaying the contact details of the remediation contractor (and site facilitator if different to remediation contractor) shall be displayed on the site adjacent to the site access. This sign shall be displayed throughout the duration of the remediation works. Owners and/or occupants of the premises adjoining the site shall be notified, in writing, at least seven days prior to the commencement of remediation works. (b) Remediation work shall not be carried out within 4 metres of the base of a tree, or adversely affect the appearance, health or stability of a tree, where works…
29. DEMOLITION – ASBESTOS AND HAZARDOUS MATERIALS The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with the relevant requirements of SafeWork NSW and the NSW Environment Protection Authority (EPA), including: • Work Health and Safety Act 2011; • Work Health and Safety Regulation 2017; • SafeWork NSW Code of Practice for the Safe Removal of Asbestos; • Australian Standard 2601 (2001) – Demolition of Structures; • Protection of the Environment Operations Act 1997. » At least 5 days prior to the demolition, renovation work or alterations and additions to any building, the person acting on the consent shall…
33. DEMOLITION – ASBESTOS AND HAZARDOUS MATERIALS The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with the relevant requirements of SafeWork NSW and the NSW Environment Protection Authority (EPA), including: • Work Health and Safety Act 2011; • Work Health and Safety Regulation 2017; • SafeWork NSW Code of Practice for the Safe Removal of Asbestos; • Australian Standard 2601 (2001) – Demolition of Structures; • Protection of the Environment Operations Act 1997. » At least 5 days prior to the demolition, renovation work or alterations and additions to any building, the person acting on the consent shall…
54. DEMOLITION – ASBESTOS AND HAZARDOUS MATERIALS The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with the relevant requirements of SafeWork NSW and the NSW Environment Protection Authority (EPA), including: • Work Health and Safety Act 2011; • Work Health and Safety Regulation 2017; • SafeWork NSW Code of Practice for the Safe Removal of Asbestos; • Australian Standard 2601 (2001) – Demolition of Structures; • Protection of the Environment Operations Act 1997. At least 5 days prior to the demolition, renovation work or alterations and additions to any building, the person acting on the consent shall…
50. DEMOLITION – ASBESTOS AND HAZARDOUS MATERIALS The demolition, removal, storage, handling and disposal of products and materials containing asbestos must be carried out in accordance with the relevant requirements of SafeWork NSW and the NSW Environment Protection Authority (EPA), including: • Work Health and Safety Act 2011; • Work Health and Safety Regulation 2017; • SafeWork NSW Code of Practice for the Safe Removal of Asbestos; • Australian Standard 2601 (2001) – Demolition of Structures; • Protection of the Environment Operations Act 1997. At least 5 days prior to the demolition, renovation work or alterations and additions to any building, the person acting on the consent shall…
33. SITE AUDIT STATEMENT Once the demolition of the existing buildings has been completed and the recommendations provided in the Detailed Site Investigation E2360-1-Rev A prepared by Geotechnical Consultants Australia dated 6 November 2023 have been implemented, a Site Audit Statement (SAS) prepared by a NSW Environment Protection Authority (EPA) accredited site auditor is to be submitted to Council certifying that the site is suitable for the intended use. This is to occur prior to the issue of the relevant construction certificate for any works associated with the basement levels and erection of the approved building for the land to which the SAS applies. Recommendations of the SAS must…
48. USE OF FILL ON SITE All fill imported on to the site shall be free of building and other demolition waste, and contain virgin excavated natural material (VENM) as defined in Part 3 of Schedule 1 of the Protection of the Environment Operations Act, 1997 and Sampling and analysis of the fill material should be conducted in accordance with the NSW EPA Sampling Design Guidelines (1995) to ensure that the material is not contaminated. Any other waste derived material the subject of a resource recovery exemption under cl. 51A of the Protection of the Environmental Operations (Waste) Regulations 2014 that is permitted to be used as fill material. Any waste derived material the subject of…
34. TEMPORARY DEWATERING OF UNDERGROUND STRUCTURES If any temporary dewatering is required during the construction of underground structures an application must be made with WaterNSW to obtain relevant approval and determine if a licence is required under the Water Management Act 2000, for temporary dewatering. A copy of the aforementioned approval must be submitted to Council. Note that permanent dewatering is not allowed. If temporary dewatering is required and approved, a separate Waverley Council temporary de-watering application must be submitted and approved by the Executive Manager, Infrastructure Services (or delegate) and associated fees paid prior to release of any construction…
19. SITE AUDIT STATEMENT A Site Audit Statement (SAS) prepared by a NSW Environment Protection Authority (EPA) accredited site auditor is to be submitted to Council certifying that the site is suitable for the intended use prior to the issue of a construction certificate for any works associated with the approved building. Conditions on the SAS must form part of the conditions of consent of the Notice of Determination. Where the Site Audit Statement is subject to conditions that require ongoing review by the Auditor or Council these conditions should be discussed with Council before the Site Audit Statement is issued. Condition reason: To ensure the site is suitable for the intended use.
60. CLASSIFICATION OF WASTE/ DISPOSAL OF EXCAVATED SOILS Prior to the exportation of waste (including fill or soil) from the site the material must be classified in accordance with the provisions of the Protection of the Environment Operations Act, 1997 and the NSW EPA Waste Classification Guidelines 2014. Condition reason: To ensure compliance with the Protection of the Environment Operations Act 1997 and the NSW EPA Waste Classification Guidelines 2014.
38. CLASSIFICATION OF WASTE/ DISPOSAL OF EXCAVATED SOILS Prior to the exportation of waste (including fill or soil) from the site the material must be classified in accordance with the provisions of the Protection of the Environment Operations Act, 1997 and the NSW EPA Waste Classification Guidelines 2014. Condition reason: To ensure compliance with the Protection of the Environment Operations Act 1997 and the NSW EPA Waste Classification Guidelines 2014.
43. CLASSIFICATION OF WASTE/ DISPOSAL OF EXCAVATED SOILS Prior to the exportation of waste (including fill or soil) from the site the material must be classified in accordance with the provisions of the Protection of the Environment Operations Act, 1997 and the NSW EPA Waste Classification Guidelines 2014. Condition reason: To ensure compliance with the Protection of the Environment Operations Act 1997 and the NSW EPA Waste Classification Guidelines 2014.
52. CLASSIFICATION OF WASTE/ DISPOSAL OF EXCAVATED SOILS Prior to the exportation of waste (including fill or soil) from the site the material must be classified in accordance with the provisions of the Protection of the Environment Operations Act, 1997 and the NSW EPA Waste Classification Guidelines 2014.
32. DETAIL SITE INVESTIGATION REPORT RECOMMENDATIONS The recommendations provided in the Detailed Site Investigation E2360-1-Rev A prepared by Geotechnical Consultants Australia dated 6 November 2023 are to be implemented in full. (Amended DA-472/2022/A)
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Contamination conditions in other councils
Wollongong
94 conditions
Cumberland
65 conditions
Bayside
64 conditions
Hornsby
61 conditions
Lane Cove
53 conditions
City of Sydney
49 conditions
Newcastle
49 conditions
City of Parramatta
48 conditions
Randwick
41 conditions
City of Ryde
37 conditions
Inner West
36 conditions
Camden
34 conditions
Willoughby
34 conditions
Burwood
31 conditions
Canterbury-Bankstown
24 conditions
Canada Bay
24 conditions
Campbelltown
23 conditions
Sutherland
21 conditions
Liverpool
19 conditions
Wollondilly
18 conditions
Blue Mountains
17 conditions
Hawkesbury
13 conditions
Strathfield
12 conditions
Georges River
11 conditions
Ku-ring-gai
11 conditions
Mosman
11 conditions
North Sydney
8 conditions
Fairfield
7 conditions
Central Coast
6 conditions
Lake Macquarie
6 conditions
Northern Beaches
5 conditions
Woollahra
5 conditions
Penrith
3 conditions
Hunters Hill
3 conditions