Liverpool Operational Noise Conditions

14 operational noise conditions imposed by Liverpool across 2 development applications in our dataset. Operational noise conditions limit noise from a development once it is in use — acoustic reports, plant and equipment noise limits, restricted hours of operation and mechanical ventilation noise.

Condition 5 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

5. The lounge garden operable facade and roof shall be fully enclosed from 10pm ­ 7am. Condition reason: To protect the amenity of the local area 196. (G340) Noise Complaints register The operator must keep a legible record of all complaints received in an up­to date Complaints Register. The Complaints Register must record, but not necessarily be limited to: (a) the date and time, where relevant, of the complaint; (b) the means by which the complaint was made (telephone, mail or email); (c) any personal details of the complainant that were provided, or if no details were provided, a note to that effect; (d) the nature of the complaint; (e) any action(s) taken by the Applicant in relation to…

Condition 3 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

3. A copy of the plans must be provided to Council with the OCCUPATION CERTIFICATE. Condition reason: To confirm the location of works once constructed that will become council assets. 146. (E005) Occupation Certificates The premises must not be occupied until an Occupation Certificate (OC) is issued by the Principal Certifier. Copies of all documents relied upon for the issue of the OC must be attached to the OC and registered with Council via the NSW Planning Portal. 28 Without prejudice draft conditions Condition reason: To ensure the development is in accordance with the approval and the use meets health, safety and amenity provisions. 147. (E010) Certificates All required documentary…

Condition 4 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

4. Are JPEG or PNG files at a minimum of 2 mega pixels. Condition reason: To ensure fairness, transparency and probity. 158. (E075) Road Works All redundant vehicular crossings shall be removed and replaced with Council’s standard kerb and gutter at no cost to Council. The removal and replacement of a standard driveway with standard integral kerb and gutter shall be subject of a driveway application to Council and works supervised by that driveway inspection process. Condition reason: To protect and maintain Council infrastructure to an appropriate standard. 159. (E105) Certification of acoustic measures Before the issue of an occupation certificate, a suitably qualified person must provide…

Condition 20 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

20. Before the issue of a construction certificate, the certifier must be satisfied that the recommendations provided in the approved Acoustic report are implemented and incorporated into the design and construction of the development, and shown on plans accompanying the construction certificate application. The construction methodology and plans accompanying the construction certificate application must be assessed and certified in writing by a suitably qualified Acoustic consultant to verify conformance with the requirements of the approved Acoustic report. The written certification from the suitably qualified Acoustic consultant must be submitted to and approved by the certifier before…

DA-263/2018/C det. 16/10/2025

Namely: This modification application has been considered in accordance with the requirements of the EP&A Act and the Regulations as outlined in this report. Following a thorough assessment of the relevant planning controls, aerotropolis provisions, and the key issues identified in this report, it is considered that the application can be supported. The key issues around this application are building car park layout, noise, processing capacity, and demonstrating that the proposal results in substantially the same development. These have been addressed, and on balance, it is considered that the development is compatible with the locality and worthy of approval. Based on the assessment…

Condition 116 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

116. The proposed use of the premises and/or machinery equipment must not create offensive noise so as to interfere with the amenity of the neighbouring properties. Should an offensive noise complaint be received and verified by Council an acoustic assessment is to be undertaken (by an appropriately qualified consultant, and an acoustic report is to be submitted to Liverpool City Council for review. Any noise attenuation recommendations approved by Council must be implemented. The assessment is to obtain relevant background readings for the approved Noise Impact Assessment. The use of the premises and/or machinery equipment installed must not give rise to offensive noise so as to interfere…

Condition 9 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

9. Condition 36B has been added to Development Consent DA-263/2018 and reads as follows: Acoustic Report 36B Before the issue of a Construction Certificate, an acoustic report shall be prepared by a suitably qualified acoustic consultant to demonstrate that the development will meet the relevant provisions of Australian Standard AS 2021:2015 Acoustics – Aircraft noise intrusion – Building siting and construction with respect to interior noise levels. The recommendations provided in the acoustic report shall be implemented and incorporated into the design and construction of the development and be shown on plans accompanying the Construction Certificate application. The construction…

Condition 91 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

91. A Compliance Certificate or other documentation deemed suitable demonstrating compliance with the following is to be submitted to the Principal Certifying Authority: a) The building has been constructed to meet the relevant noise criteria’s in accordance with the approved acoustic report; and b) All relevant recommendations within the approved acoustic report have been adopted. Upon completion of works and before the issue of any occupation certificate, written certification prepared by a suitably qualified Acoustic consultant must be submitted to and approved by the certifier. The written certification prepared by the suitably qualified Acoustic consultant must confirm that the…

Condition 17 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

17. Condition 102A has been added to Development Consent DA-263/2018 and reads as follows: Recommendations of Acoustic Report (Aircraft Noise Intrusion) 102A Upon completion of works and prior to the issue of any Occupation Certificate, written certification prepared by a suitably qualified acoustic consultant shall be submitted to and approved by the Principal Certifying Authority (PCA) prior to issue of any Occupation Certificate. The written certification prepared by the suitably qualified acoustic consultant shall confirm that the development meets the relevant provisions of Australian Standard AS 2021:2015 Acoustics – Aircraft noise intrusion – Building siting and construction with…

Condition 10 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

10. Condition 36C has been added to Development Consent DA-263/2018 and reads as follows: Mechanical Plant and Equipment 36C Before the issue of a construction certificate, the certifier must be satisfied that mechanical plant and equipment were selected in consultation with a suitably qualified acoustic consultant in accordance with the recommendations of the approved acoustic report. Note: The ‘suitably qualified acoustic consultant’ must be a member of the Australian Acoustical Society or employed by an Association of Australasian Acoustical Consultants (AAAC) member firm.

Condition 13 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

13. Condition 84B has been added to Development Consent DA-263/2018 and reads as follows: Acoustic Report 84B The construction requirements recommended in the approved acoustic report are to be implemented by the consent holder during the construction of the development.

Condition 6 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

6. Condition 20 of Development Consent DA-263/2018 (as amended by DA- 263/2018/A) has been amended to read as follows: Recommendations of Acoustic Report

Condition 15 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

15. Condition 91 of Development Consent DA-263/2018 has been amended to read as follows: Recommendations of Acoustic Report

Condition 26 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

26. Condition 116 of Development Consent DA-263/2018 has been amended to read as follows: Offensive Noise – Acoustic Report

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.