Liverpool Contamination Conditions
19 contamination conditions imposed by Liverpool across 3 development applications in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.
2. All fill material imported to the site must be: Virgin Excavated Natural Material as defined in Schedule 1 of the Protection of the Environment Operations Act 1997; or a material identified as being subject to a resource recovery exemption by the NSW EPA; or a combination of Virgin Excavated Natural Material as defined in Schedule 1 of the Protection of the Environment Operations Act 1997 and a material identified as being subject to a resource recovery exemption by the NSW EPA. Condition reason: To ensure soil removed from the site is appropriately disposed of and soil imported to the site is not contaminated and is safe for future occupants. 109. (D430) Unidentified Contamination Any…
3. Approved final design. Condition reason: To ensure fairness, transparency and probity. 87. (D096) Disabled Access Access, parking and facilities for persons with disabilities to be provided in accordance with the provisions of the National Construction Code (NCC/BCA). Condition reason: To require any new building, part of a building and the affected part of the existing building to comply with the Premises Standards, National Construction Code (NCC/BCA) and Australian Standard. 88. (D100) General Site Works Surface Contours Alterations to the natural surface contours must not impede or divert natural surface water runoff, so as to cause a nuisance to adjoining property owners.…
5. The lounge garden operable facade and roof shall be fully enclosed from 10pm to 7am. Condition reason: To protect the amenity of the local area (b) Notwithstanding (a) above, live or amplified music indoors is permissible until 2am on Friday and Saturday nights for a trial period of 12 months from the date of issue of any Occupation Certificate. Council’s Health and Building Unit is to be informed in writing of the date of commencement of the trial hours. (c) A further application may be lodged to continue the operating hours outlined in (b) above not less than 30 days before the end of the trial period. Council’s consideration of a proposed continuation and/or extension of the hours…
1. Development the subject of this determination notice must be carried out strictly in accordance with the following plans/reports marked, except where modified by the undermentioned conditions. Plan Name Plan Number Rev Date Prepared By Location Plan P513-DA-01 D 23/09/2019 PTI Architecture Demolition Plan P513-DA-02 B 23/01/2025 PTI Architecture Site Plan with P513-DA-03 B 23/01/2025 PTI Architecture Approved DA Footprint Overlayed Site Plan with P513-DA-03 K 12/02/2025 PTI Approved DA Architecture Footprint Overlayed Detailed Shed P513-DA-04 E 23/09/2019 PTI Architecture Plan Detailed Shed P513-DA-04 G 01/05/2025 PTI Plan Architecture Detailed Site Plan P513-DA-05 N 23/09/2019 PTI…
11. The protective measures for the preservation of trees onsite and in adjoining public areas including measures in accordance with: AS 4970 – Protection of trees on development sites; An applicable Development Control Plan; An arborist’s report approved as part of this consent A copy of the construction site management plan must be kept onsite at all times while work is being carried out. Condition reason: To require details of measures that will protect the public, and the surrounding environment, during site works and construction. 239. (B532) Waste Management Plan requirements Before work commences, a waste management plan for the development must be prepared and provided to the…
18. Condition 102B has been added to Development Consent DA-263/2018 and reads as follows: Operational Environmental Management Plan 102B Before the issue of any Occupation Certificate, an Operational Environmental Management Plan (OEMP) shall be prepared for the facility and be submitted to Liverpool City Council for review and approval. The Plan shall be prepared or reviewed and certified by a suitably qualified environmental consultant and address means by which the commitment in the Environmental Impact Statement and other environmental assessment reports will be fully implemented. The OEMP shall also provide a framework for managing and mitigating environmental impacts for the life of…
23. Condition 102G has been added to Development Consent DA-263/2018 and reads as follows: Operational Environmental Management Plan 102G Before the issue of any Occupation Certificate, an Operational Environmental Management Plan (OEMP) shall be prepared for the facility and be submitted to Liverpool City Council for review and approval. The Plan shall be prepared or reviewed and certified by a suitably qualified environmental consultant and address means by which the commitment in the Environmental Impact Statement and other environmental assessment reports will be fully implemented. The OEMP shall also provide a framework for managing and mitigating environmental impacts for the life of…
128. Within twelve (12) months of the commencement of operations, and every twelve (12) months thereafter unless Liverpool City Council directs otherwise, the operator shall at its own expense commission an independent Environmental Audit of the project. This audit must: a) Be carried out by a suitably qualified, experienced and independent audit team; b) Be consistent with guidelines and standards relating to Principles for Environmental Auditing; c) Include consultation with Liverpool City Council and the Appropriate Regulatory Authority; d) Assess whether the project is complying with the approved Operational Environmental Management Plan, conditions of both this consent and any licence…
8. Condition 36A has been added to Development Consent DA-263/2018 and reads as follows: Design Amendments 36A Before the issue of a construction certificate, the certifier must ensure the construction certificate plans and specifications detail the following required amendments to the approved plans and documents: a) All pedestrian paths and shared zones identified by a diagonal hatch on the plan named ‘Detailed Site Plan (Part B) – Martin Rd East, Revision D, dated 02/05/2025, prepared by PTI Architecture’ must incorporate a change in colour and/or texture to provide clear demarcation between pedestrian and vehicle spaces.
13. Unexpected Finds Protocol. The CEMP must be kept on site for the duration of the works and must be made available to Council Officers upon request Condition reason: To require details of measures that will protect the public, and the surrounding environment, during site works and construction. 238. (B361) Construction Site Management Plan 43 Without prejudice draft conditions Before the issue of a construction certificate, a construction site management plan must be prepared, and provided to the principal certifier. The plan must include the following matters:
19. Condition 102C has been added to Development Consent DA-263/2018 and reads as follows: Operational Environmental Management Plan – Compliance Certificate 102C Prior to the issue of any Occupation Certificate, a Compliance Certificate prepared by a suitably qualified and experienced environmental consultant shall be submitted to Liverpool City Council certifying that all components of the development comply with the approved Operational Environmental Management Plan and that all recommendations have been adopted.
102. All areas to be trafficable by vehicles (being the area annotated with ‘Concrete Driveway & Manoeuvring Area’ and ‘driveway’, and the car spaces depicted on the plans prepared by ‘PTI Architecture’, Sheets DA 05 Revision N DA 05, Detailed Site Plan (Part A) – Lawson Rd West, Revision P, dated 01/05/2025 and DA 04, Detailed Site Plan (Part B) – Martin Rd East, Revision D, dated 02/05/2025), are to be concreted to an appropriate engineering specification prior to the issuing of an Occupation Certificate.
24. Condition 102H has been added to Development Consent DA-263/2018 and reads as follows: Operational Environmental Management Plan 102H Prior to the issue of an Occupation Certificate, a Compliance Certificate prepared by a suitably qualified and experienced environmental consultant shall be submitted to Liverpool City Council certifying that all components of the development comply with the approved Operational Environmental Management Plan and that all recommendations have been adopted.
102. All areas to be trafficable by vehicles (being the area annotated with ‘Concrete Driveway & Manoeuvring Area’ and ‘driveway’, and the car spaces depicted on the plans prepared by ‘PTI Architecture’, Sheets DA 05 Revision N, and DA 06 Revision J, dated 23/09/2019 DA 04, Detailed Site Plan (Part B) – Martin Rd East, Revision D, dated 02/05/2025, are to be concreted to an appropriate engineering specification prior to the issuing of an Occupation Certificate.
121. The operation of the development shall comply with the approved Operational Environmental Management Plan at all times. A spill kit shall be provided on site at all times to clean up any minor liquid spillages. A permanent record of receipts for the removal of both liquid and solid waste from the site shall be kept and maintained up to date at all times. Such record shall be made available to Liverpool City Council’s Officers upon request.
1. All excavated material removed from the site must be classified in accordance with the EPA’s Waste Classification Guidelines before it is disposed of at an approved waste management facility and the classification and the volume of material removed must be reported to the principal certifier.
2. Geotechnical Investigation, December 17/3905 A STS Geo- Preliminary Acid Sulfate Soils 2018 Environmental Assessment, Salinity Assessment, and Wastewater Assessment On-Site Wastewater Report May 2025 1294-WW- Broadcrest A-03 Environmental Pty Ltd
28. Condition 121 has been added to Development Consent DA-263/2018 and reads as follows: Operational Environmental Management Plan
11. Preliminary Site January 18/0089 STS Geo- Investigation 2018 Environmental
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Contamination conditions in other councils
Wollongong
94 conditions
Cumberland
65 conditions
Bayside
64 conditions
Hornsby
61 conditions
Lane Cove
53 conditions
City of Sydney
49 conditions
Newcastle
49 conditions
City of Parramatta
48 conditions
Randwick
41 conditions
City of Ryde
37 conditions
Inner West
36 conditions
Camden
34 conditions
Willoughby
34 conditions
Burwood
31 conditions
Canterbury-Bankstown
24 conditions
Canada Bay
24 conditions
Waverley
24 conditions
Campbelltown
23 conditions
Sutherland
21 conditions
Wollondilly
18 conditions
Blue Mountains
17 conditions
Hawkesbury
13 conditions
Strathfield
12 conditions
Georges River
11 conditions
Ku-ring-gai
11 conditions
Mosman
11 conditions
North Sydney
8 conditions
Fairfield
7 conditions
Central Coast
6 conditions
Lake Macquarie
6 conditions
Northern Beaches
5 conditions
Woollahra
5 conditions
Penrith
3 conditions
Hunters Hill
3 conditions