8 demolition conditions imposed by Liverpool across 3 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

Condition 3 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

3. The results of any chemical testing of fill material. Condition reason: To ensure fairness, transparency and probity. 139. (D668) Traffic Management Applications must be made to Council’s Traffic & Transport Section for any road closures. The applicant is to include a Traffic Control Plan, prepared by a suitably qualified person, which is to include the date and times of closures and any other relevant information. Condition reason: To ensure fairness, transparency and probity. 140. (D670) Construction Traffic Management Plan The endorsed Construction Traffic Management Plan is to be implemented during the entire construction phase. Condition reason: To ensure fairness, transparency and…

DA-229/2025 det. 30/10/2025

Occupation certificate means a certificate that authorises the occupation and use of a new building or a change of building use for an existing building in accordance with this consent. Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities…

Condition 12 DA-263/2018/C det. 16/10/2025 Modification Application to Development Consent DA-263/2018

12. Condition 84A has been added to Development Consent DA-263/2018 and reads as follows: Demolition of Septic Tank and Effluent Disposal Area 84A Any existing effluent disposal area is to be demolished and back filled with Virgin Excavated Natural Material (VENM). Any septic tank, collection well or aerated wastewater treatment system is to be removed or reused in accordance with NSW Advisory Note 3 – Destruction, Removal or Reuse of Septic Tanks, Collection Wells and Aerated Wastewater Treatment Systems and other Sewage Management Facility Vessels available from the NSW Health website (www.health.nsw.gov.au)

Condition 6 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

6. A garbage container with a tight­fitting lid Condition reason: To ensure fairness, transparency and probity. 254. (C049) Demolition management plan Before demolition work commences, a demolition management plan must be prepared by a suitably qualified person. 47 Without prejudice draft conditions The demolition management plan must be prepared in accordance with Australian Standard 2601 – The Demolition of Structures, the Code of Practice – Demolition Work, Liverpool Development Control Plan 2008 and must include the following matters:

Condition 4 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

4. Details of demolition traffic management, including proposed truck movements to and from the site, estimated frequency of those movements, and compliance with AS 1742.3 Traffic Control for Works on Roads and parking for vehicles

Condition 1 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

1. Only an asbestos removal contractor who holds the required class of Asbestos Licence issued by SafeWork NSW must carry out the removal, handling and disposal of any asbestos material;

Condition 8 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

8. Details of the equipment that is to be used to carry out demolition work and the method of loading and unloading excavation and other machines

Condition 10 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

10. Details of re­use and disposal of demolition waste material in accordance with Liverpool Development Control Plan 2008