9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Liverpool Stormwater Conditions

7 stormwater conditions imposed by Liverpool across 3 development applications in our dataset. Stormwater conditions control how a development collects, detains and discharges rainwater runoff — on-site detention (OSD), drainage easements, water-sensitive urban design and connection to council drainage systems.

Condition 13 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

13. A garbage container with a tight­fitting lid. Condition reason: To provide details of measures for the safe and appropriate disposal of demolition waste and the protection of the public and surrounding environment during the carrying out of demolition works on the site 255. (C055) Site Facilities Adequate refuse disposal methods and builders storage facilities shall be installed on the site. Builders’ wastes, materials or sheds are not to be placed on any property other then that which this approval relates to. Condition reason: To ensure the required site management measures are implemented before the commencement of building work. 256. (C117) Erosion and sediment controls in place…

DA-229/2025 det. 30/10/2025

Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities relating to: the collection of stormwater, the reuse of stormwater, the detention of stormwater, the controlled release of stormwater, and connections to easements and public stormwater…

Condition 13 DA-263/2018/D det. 16/10/2025 Modification Application - Resource Recovery Facility

13. Landscaping Plan December 55 Martin Ecological 2018 Road Consultants Australia Addendum to the 24/09/2019 18580 Rev. Benbow Environmental impact 1 Environmental Statement, including Appendices: D. Architectural Plans and (see above) Visual Impact Assessment E. Landscaping Plan Updates September 55 Martin Ecological 2019 Road Consultants Australia Landscape Plan January Version: Ecological 2025 Final Consultants Australia Pty Ltd F. Civil and Stormwater Plans (see above) G. Traffic Impact Letter 29/08/2019 19115L1 Transport & Urban Planning Noise Impact Assessment April 2025 241115_NI Benbow A_Rev4 Environmental I. Air Quality Statement Letter 13/09/2019 EH/snb Benbow Environmental J.…

Condition 112 DA-263/2018/D det. 16/10/2025 Modification Application - Resource Recovery Facility

112. All work and storage areas where chemical spillage may occur shall be bunded. The capacity of the bunded area shall be calculated as being equal to 110% of the largest storage or process vessel/container in the area or 10% 25% of the total volume of vessels/containers accommodated in the area, whichever is the greater. All bunded areas shall be graded to a blind sump or sewer to facilitate collection and disposal of wastewater in accordance with Sydney Water’s requirements. All bunded areas shall be suitably treated to prevent ingress of stormwater.

Condition 6 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

6. Erosion and sediment control measures which are to be implemented during demolition and methods to prevent material being tracked off the site onto surrounding roadways

Condition 3 DA-263/2018/D det. 16/10/2025 Modification Application - Resource Recovery Facility

3. Stormwater Management 17/01/2019 2017/01 Ultramark Plan and Report

Condition 1 DA-26/2025 det. 02/09/2025 Alterations and additions to existing pub (Crossroads Hotel)

1. All stormwater drainage systems and storage systems; and

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.