Fairfield Contamination Conditions

7 contamination conditions imposed by Fairfield across 2 development applications in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.

Condition 1 DA 205.1/2024 det. 27/06/2025 Warehouse and distribution centre and ancillary works

1. Approved Plans and Supporting Documentation Development must be carried out in accordance with the following approved plans and supporting documentation (stamped by Council), except where the conditions of this consent expressly require otherwise. Plan No. : Revision No. : Plan Title : Drawn By : Date : DA000 F Cover Sheet sba 07.04.2025 DA010 C Perspectives sba 04.02.2025 DA100 E Site Plan and Warehouse Plan sba 07.04.2025 DA101 E Roof Plan sba 07.04.2025 DA201 E Office and Carpark A sba 07.04.2025 DA202 E Office and Carpark B sba 07.04.2025 DA250 D Dock Office Plan and Elevations sba 04.02.2025 Warehouse Elevations and DA300 D sba 07.04.2025 Section DA301 C Office Elevations sba…

Condition 25 DA 205.1/2024 det. 27/06/2025 Warehouse and distribution centre and ancillary works

25. Dilapidation Report a. A dilapidation report shall be carried out on all adjoining properties, public road reserve area and the extent of Newton Road accessed by construction vehicles by the Applicant prior to the commencement of any works on site. The required dilapidation report, to be prepared by a suitably qualified structural engineer, shall be submitted to Fairfield City Council prior to the commencement of any works on site. The report shall cover structural and geotechnical factors likely to arise from the development. A copy of this report shall be submitted to Council as a record. b. During construction, excavation and compaction associated with the development, the builder…

Condition 42 DA 69.1/2024 det. 17/03/2025 Amending DA to mixed use development (PAN-415907)

42. Dilapidation Report a. A dilapidation report shall be carried out on all adjoining properties by the Applicant prior to the commencement of any works on site. The required dilapidation report, to be prepared by a suitably qualified structural engineer, shall be submitted to Fairfield City Council prior to the commencement of any works on site. The report shall cover structural and geotechnical factors likely to arise from the development. A copy of this report shall be submitted to Council as a record. b. During construction, excavation and compaction associated with the development, the builder shall be responsible in monitoring vibration impact upon neighbouring properties to ensure…

Condition 50 DA 69.1/2024 det. 17/03/2025 Amending DA to mixed use development (PAN-415907)

50. Soil Management While site work is being carried out, the Principal Certifier must be satisfied all soil removed from or imported to the site is managed in accordance with the following requirements: a. All excavated material removed from the site must be classified in accordance with the EPA’s Waste Classification Guidelines before it is disposed of at an approved waste management facility and the classification and the volume of material removed must be reported to. b. All fill material imported to the site must be: i. Virgin Excavated Natural Material as defined in Schedule 1 of the Protection of the Environment Operations Act 1997, or ii. a material identified as being subject to a…

Condition 6 DA 69.1/2024 det. 17/03/2025 Amending DA to mixed use development (PAN-415907)

6. Site Remediation and Validation Report Prior to the issue of a Construction Certificate, a Site Remediation and Validation Report shall be prepared by a suitably qualified contaminated land consultant and be provided to Fairfield City Council for review and acceptance. The Site Remediation and Validation Report shall be prepared in accordance with State Environmental Planning Policy (Resilience and Hazards) 2021, National Environment Protection (Assessment of Site Contamination) Measure (NEPM) 1999 (April 2013), and all NSW Environment Protection Authority Guidelines, including but not limited to, Consultants Reporting on Contaminated Land, Contaminated Land Guidelines Dated 5 May 2020.…

Condition 38 DA 205.1/2024 det. 27/06/2025 Warehouse and distribution centre and ancillary works

38. Environmental Reports Certification Before the issue of the relevant Occupation Certificate, written certification from a suitably qualified person(s) shall be submitted to the Principal Certifier and Fairfield City Council, stating that all works/methods/procedures/control measures/recommendations approved by Fairfield City Council’s Environmental Health Officer and the following reports have been completed: a) Noise and Vibration Impact Assessment, prepared by E-Lab Consulting, dated 24 April 2024 b) Detailed Site Investigation Report, pared by EP Risk, dated 22 April 2024 c) Preliminary Risk Screening, prepared by Riskcon, dated 15 March 2024 d) Air Quality Impact Assessment,…

Condition 103 DA 69.1/2024 det. 17/03/2025 Amending DA to mixed use development (PAN-415907)

103. Waste classification Any soil requiring removal from the site, as part of future site works, shall be classified in accordance with the “Waste Classification Guidelines, Part 1: Classifying Waste” NSW EPA (2014). Reason: To ensure compliance with statutory requirements. Page 36 of 40 18626402.1 ATTACHMENT *