Sutherland Tree Management Conditions
32 tree management conditions imposed by Sutherland across 3 development applications in our dataset. Tree management conditions protect existing vegetation and require replacement planting — tree protection zones, arborist supervision, approved tree removals, root protection and landscaping.
6. Annexure D: Tree Protection Details of the Approved Arboricultural Impact Assessment Report by Ross Jackson dated 16/5/25. The tree protection measures detailed under ‘BEFORE BUILDING WORKS COMMENCES’ in the condition ‘Tree Protection Measures’ must be maintained during construction, including the following measures: i) The supervising Consulting Arborist must be present during any approved excavation/earthworks (including basement excavation) and under boring works (including all underground services) within the Tree Protection Zone (TPZ) of Tree 3, Tree 10 and neighbouring trees identified for retention and protection DA25/0286 PAGE 17 and have the authority to direct works to ensure…
14. Tree protection measures Before any site work commences, the certifier, must be satisfied the measures for tree protection detailed in the Appendix 5: Tree Protection Plan and outlined in the Appendix 6: General Tree Protection Specification of the approved Arboricultural Impact Assessment (dated Nov 2024) and the approved Construction Management Plan (L700 Issue 6) are in place. A copy of the approved Arboricultral Impact Assessment Tree Protection Specification and the approved Construction Management Plan must be kept on-site at all times while work is being carried out. Prior to the commencement of any demolition, excavation or construction works on site the applicant must engage a…
14. Tree protection measures Before any site work commences, the certifier, must be satisfied the measures for tree protection detailed in the Appendix 5: Tree Protection Plan and outlined in the Appendix 6: General Tree Protection Specification of the approved Arboricultural Impact Assessment (dated Nov 2024) and the approved Construction Management Plan (L700 Issue 6) are in place. A copy of the approved Arboricultral Impact Assessment Tree Protection Specification and the approved Construction Management Plan must be kept on‐site at all times while work is being carried out. Prior to the commencement of any demolition, excavation or construction works on site the applicant must engage a…
50. Pruning of trees on private land All pruning must be carried out by an AQF Level 3 arborist and conform to the provisions of AS4373 - 2007 Australian Standard for Pruning of Amenity Trees. Approval is granted for the following pruning activity to be carried out to retained trees on site listed in the within this consent for trees identified in the table below and/or as marked on attachment Plate 7 of the approved Arboricultural Impact Assessment prepared by Tree IQ dated 22/05/2024. Tree No. Tree Species (botanical Location Pruning Works name) T19 Eucalyptus saligna (Sydney North of proposed Reduction pruning as Blue Gum) ramp to eastern per Plate 7 on the boundary. approved…
32. Supervising Arborist Prior to the commencement of any demolition, excavation or construction works on site the applicant must provide clear evidence of the appointment of an appropriately qualified, experienced and certified supervising AQF Level 5 Arborist, to oversee the measures for protection of trees to be retained on site and adjoining sites, to the satisfaction of the principal certifier. Note: A Consulting Arborist is a person with a current membership of the Institute of Australian Consulting Arboriculturists (IACA) or alternatively a person who has obtained an Australian Qualifications Framework AQF Level 5 in Arboriculture. Condition reason: To ensure an appropriate person is…
60. Certification of tree retention and protection The principal certifier and Council’s Landscape Officer must be satisfied all tree protection measures including AQF Level 5 Arborist Supervision & Certification have been completed in accordance with the approved plans and documents and any relevant conditions of this consent. Prior to the issue of an Occupation Certificate the Supervising Arborist’s signed and dated checkpoint list and photographic evidence must be provided to both the Principal Certifier and Council’s Landscape Officer at the time of the final landscape inspection. Condition reason: To ensure the approved tree protection works and trees have been retained in good health…
46. Tree protection during work While site work is being carried out, all required tree protection measures must be maintained in good condition in accordance with: 1. the construction site management plan required under this consent, 2. the relevant requirements of AS 4970 Protection of trees on development sites, 3 Part 3.0 of the approved Arboricultural Impact Assessment Report by Tree IQ, dated 22/05/2024. This includes maintaining adequate soil grades and ensuring all machinery, builders refuse, spoil and materials remain outside tree protection zones. Condition reason: To protect trees during the carrying out of site work. DA24/0346 PAGE 17
33. Tree protection measures Before any site work commences the principal certifier, or council where a principal certifier is not required, must be satisfied the measures for tree protection detailed in the construction site management plan are in place. DA25/0286 PAGE 13 All trees not approved for removal on the subject site and trees on the adjoining sites (which are potentially affected by the development works) must be protected by the following measures, including any additional recommendations made by the appointed supervising Arborist and outlined in the approved Arboricultural Impact Assessment Report by Ross Jackson dated 16/5/25.
5. For the remaining 53 replacement trees required, council offers offsite planting under a ‘Deed of Agreement’ as an alternative to onsite planting, at a cost specified in council’s DA25/0286 PAGE 10 schedule of fees and charges. Offsite planting will be undertaken as part of council’s Green Street Program. ‘Deed of Agreement’ forms can be downloaded from council’s website at Off-Site tree replacement and Deed of Agreement | Sutherland Shire Council (nsw.gov.au) A completed form and payment must be submitted to council prior to the release of the construction certificate. Condition reason: To inform tree removal and replacement.
11. The protective measures for the preservation of trees on-site and in adjoining public areas including measures in accordance with: a. AS 4970 - Protection of trees on development sites; b. An applicable Development Control Plan; c. An arborist’s report approved as part of this consent DA24/0346 PAGE 6 A copy of the construction site management plan must be kept on-site at all times while work is being carried out. Condition reason: To require details of measures that will protect the public, and the surrounding environment, during site works and construction.
12. The protective measures for the preservation of trees on-site and in adjoining public areas including measures in accordance with: a. AS 4970 - Protection of trees on development sites; b. An applicable Development Control Plan; c. The arborist’s report approved as part of this consent A copy of the construction site management plan must be kept on-site at all times while work is being carried out. Condition reason: To require details of measures that will protect the public, and the surrounding environment, during site works and construction.
12. The protective measures for the preservation of trees on‐site and in adjoining public areas including measures in accordance with: a. AS 4970 ‐ Protection of trees on development sites; b. An applicable Development Control Plan; c. The arborist’s report approved as part of this consent A copy of the construction site management plan must be kept on‐site at all times while work is being carried out. Condition reason: To require details of measures that will protect the public, and the surrounding environment, during site works and construction.
43. Responsibility for changes to public infrastructure While site work is being carried out, any costs incurred as a result of the approved removal, relocation or reconstruction of infrastructure (including ramps, footpaths, kerb and gutter, light poles, kerb inlet pits, service provider pits, street trees or any other infrastructure in the street footpath area) must be paid as directed by the consent authority. Condition reason: To ensure payment of approved changes to public infrastructure.
43. Responsibility for changes to public infrastructure While site work is being carried out, any costs incurred as a result of the approved removal, relocation or reconstruction of infrastructure (including ramps, footpaths, kerb and gutter, light poles, kerb inlet pits, service provider pits, street trees or any other infrastructure in the street footpath area) must be paid as directed by the consent authority. Condition reason: To ensure payment of approved changes to public infrastructure.
12. Specification for Project Arborist supervision and certification during excavation and construction works approved within the TPZ area for trees to be retained. A copy of the construction site management plan must be kept on-site at all times while work is being carried out. DA25/0286 PAGE 4 Condition reason: To require details of measures that will protect the public, and the surrounding environment including to users of the adjoining public school, during site works and construction.
20. Tree protection during work While site work is being carried out, all required tree protection measures must be maintained in good condition in accordance with: 1. the approved construction site management plan under this consent, 2. the relevant requirements of AS 4970 Protection of trees on development sites, 3. 3.2 Tree Protection Recommendations, 3.2.1 of the approved Arboricultural Impact Assessment Tree Protection Specification by Anna Hopwood, Martin Peacock dated 4.11.20244.
20. Tree protection during work While site work is being carried out, all required tree protection measures must be maintained in good condition in accordance with: 1. the approved construction site management plan under this consent, 2. the relevant requirements of AS 4970 Protection of trees on development sites, 3. 3.2 Tree Protection Recommendations, 3.2.1 of the approved Arboricultural Impact Assessment Tree Protection Specification by Anna Hopwood, Martin Peacock dated 4.11.20244.
64. Certification of tree retention and protection The principal certifier must be satisfied all tree protection including AQF Level 5 Arborist Supervision & Certification (if required) have been completed in accordance with the DA24/0346 PAGE 21 approved plans and documents and any relevant conditions of this consent. Condition reason: To ensure the approved tree protection works and trees have been retained in good health and condition.
31. Certification of tree retention and protection All tree protection including AQF Level 5 Arborist Supervision & Certification must be completed in accordance with the approved plans and documents and any relevant conditions of this consent. Condition reason: To ensure the approved tree protection works and trees have been retained in good health and condition. DA24/0290 PAGE 13 OCCUPATION AND ONGOING USE Condition
1. The walkway slab within the TPZ area of Tree 310 should either be installed above existing grade, or have the finished levels determined by preliminary excavation of the slab footprint to identify significant roots (as determined by the Project Arborist). Condition reason: To require minor amendments to the plans endorsed by the consent authority following assessment of the development.
1. The walkway slab within the TPZ area of Tree 310 should either be installed above existing grade, or have the finished levels determined by preliminary excavation of the slab footprint to identify significant roots (as determined by the Project Arborist). Condition reason: To require minor amendments to the plans endorsed by the consent authority following assessment of the development.
4. Appendix 5. Tree Protection Plan, of the approved Arboricultural Impact Assessment Tree Protection Specification by Anna Hopwood, Martin Peacock dated 4.11.2024 This includes maintaining adequate soil grades and ensuring all machinery, builders refuse, spoil and materials remain outside tree protection zones. Condition reason: To protect trees during the carrying out of site work.
4. Appendix 5. Tree Protection Plan, of the approved Arboricultural Impact Assessment Tree Protection Specification by Anna Hopwood, Martin Peacock dated 4.11.2024 This includes maintaining adequate soil grades and ensuring all machinery, builders refuse, spoil and materials remain outside tree protection zones. Condition reason: To protect trees during the carrying out of site work.
29. Certification of tree retention and protection All tree protection including AQF Level 5 Arborist Supervision & Certification must be completed in accordance with the approved plans and documents and any relevant conditions of this consent. Condition reason: To ensure the approved tree protection works and trees have been retained in good health and condition.
1. Protective measures for on-site tree preservation and trees in adjoining properties and/or public domain (if applicable) (including in accordance with AS 4970-2009 Protection of trees on development sites). Tree protection methods must comply with all Landscape, Tree Protection and Arborist Supervision requirements detailed in conditions of consent.
48. Tree protection during work While site work is being carried out, all required tree protection measures must be maintained in good condition in accordance with: 1. the construction site management plan under this consent, 2. the relevant requirements of AS 4970 Protection of trees on development sites,
3. Where pipelines are located within the “tree protection zone” of significant vegetation to be retained, the lines shall be excavated by hand or by directional under boring techniques to reduce any adverse impact on the root zone of the trees. Condition reason: Ensuring suitable drainage is provided.
2. Where pipelines are located within the “tree protection zone” of significant vegetation to be retained, the lines shall be excavated by hand or by directional underboring techniques to reduce any adverse impact on the root zone of the trees.
2. The 150W Grated drain and associated stormwater line behind proposed walling to the west of Tree 3 must be deleted. Condition reason: To require minor amendments to the plans endorsed by the consent to ensure tree protection.
5. Tree Protection Zones (TPZ) / the location of tree protective fencing must be shown on plan for all existing trees and/or natural site features to be retained and protected.
4. Protective measures for on-site tree preservation and trees in adjoining public domain
4. The approved Arboricultural Impact Assessment Report by Ross Jackson dated 16/5/25.
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Tree Management conditions in other councils
Ku-ring-gai
93 conditions
Wollongong
77 conditions
Lane Cove
69 conditions
Cumberland
45 conditions
Hornsby
37 conditions
Bayside
35 conditions
Georges River
30 conditions
Inner West
30 conditions
Willoughby
29 conditions
Camden
26 conditions
City of Ryde
23 conditions
Burwood
19 conditions
Newcastle
18 conditions
City of Parramatta
13 conditions
Fairfield
13 conditions
Waverley
12 conditions
Strathfield
11 conditions
Wollondilly
11 conditions
Canterbury-Bankstown
10 conditions
Campbelltown
9 conditions
Canada Bay
8 conditions
Blue Mountains
8 conditions
Hawkesbury
7 conditions
Randwick
6 conditions
Mosman
6 conditions
Lake Macquarie
4 conditions
City of Sydney
3 conditions
Liverpool
3 conditions