City of Sydney Waste Management Conditions
18 waste management conditions imposed by City of Sydney across 18 development applications in our dataset. Waste management conditions cover how waste is stored, collected and minimised — waste management plans, bin storage rooms, recycling provision and access for collection vehicles.
Where construction/building works require the use of a public place including a road or footpath, approval under Section 138 of the Roads Act 1993 for a Barricade Permit is to be obtained from Council prior to the commencement of work. Details of the barricade construction, area of enclosure and period of work are required to be submitted to the satisfaction of Council. (29) WASTE AND RECYCLING COLLECTION CONTRACT Prior to an Occupation Certificate being issued and/or commencement of the use, whichever is earlier, of the building the owner must ensure that there is a contract with a licensed contractor for the removal of all trade waste. No garbage is to be placed on the public way e.g.…
Assessment Act 1979. Reason To protect the amenity of the surrounding area. (9) NO OBSTRUCTION OF PUBLIC WAY Unless otherwise approved by Council, the public way must not be obstructed by any materials, vehicles, waste receptacles, skip-bins or the like. Non-compliance with this requirement may result in the issue of a notice by Council to stop all work on the site. Reason To protect the amenity of the public domain. D/2026/166 Page 8 (10) LOADING AND UNLOADING DURING CONSTRUCTION The following requirements apply: (a) All loading and unloading associated with construction activity must be accommodated on site, where possible. (b) If, it is not feasible for loading and unloading to take…
No cooking facilities, kitchenette or the like is approved within the Studio. Reason To ensure that the use of the site is as per the approved development. D/2025/495/A Page 5 PART B - BEFORE ISSUE OF A CONSTRUCTION CERTIFICATE (6) WASTE AND RECYCLING MANAGEMENT – GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development.…
The materials and samples schedule/board must not include generic material or colour descriptions or use terminology such as ‘or similar’. Reason To require the submission of a materials and samples board following assessment of the development. (10) WASTE AND RECYCLING MANAGEMENT – GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of…
A separate application must be made to Council or a Registered Strata Certifier to obtain approval of the Strata Plan and issue of a Strata Certificate under the Strata Schemes Development Act 2015. Reason To ensure separate approval is obtained for approval of the Strata Plan. (6) WASTE AND RECYCLING MANAGEMENT - GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately…
The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development. D/2025/1071 Page 3 (3) NO CHARCOAL OR SOLID FUEL COOKING No charcoal of solid fuel cooking is approved as part of this application. For the purpose of this condition solid fuel cooking should be defined as any solid material used as a fuel to produce energy and provide…
An Occupation Certificate must be obtained from the Principal Certifier and a copy submitted to Council prior to commencement of occupation or use of the whole or any part of a temporary structure used as an entertainment venue. Reason To ensure the use as an entertainment venue is certified appropriately. (17) WASTE AND RECYCLING The proposal must comply with the relevant provisions of Council’s Guidelines for Waste Management in New Developments 2018 which requires facilities to promote the efficient storage, separation, collection and handling of waste to maximise resources recovery. D/2025/720/C Page 10 Reason To ensure that waste and recycling is appropriately managed. (18) WASTE AND…
No solar hot water heater storage tanks, ventilators, air conditioning units, satellite dishes and antennae or the like are to be placed on the street-facing roof plane of the building. Reason To ensure an appropriate heritage/streetscape outcome. (4) WASTE AND RECYCLING MANAGEMENT – GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of…
The permitted trading hours are restricted to between 10.00am and 12.00am midnight Monday to Sunday. Reason To ensure the premises trades within the approved hours of operation. D/2025/1135 Page 3 (3) WASTE AND RECYCLING MANAGEMENT - GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development. (4) SIGN ILLUMINATION (a) At no…
Act 1993 must be submitted to and approved by Council. Reason To protect the amenity of the public domain. (10) NO OBSTRUCTION OF PUBLIC WAY Unless otherwise approved by Council, the public way must not be obstructed by any materials, vehicles, waste receptacles, skip-bins or the like. Non-compliance D/2025/1100 Page 7 with this requirement may result in the issue of a notice by Council to stop all work on the site. Reason To protect the amenity of the public domain. (11) VEHICLE CLEANSING Prior to the commencement of work, suitable measures are to be implemented to ensure that sediment and other materials are not tracked onto the roadway by vehicles leaving the site. It is an offence to…
Assessment Act 1979. Reason To protect the amenity of the surrounding area. (8) NO OBSTRUCTION OF PUBLIC WAY Unless otherwise approved by Council, the public way must not be obstructed by any materials, vehicles, waste receptacles, skip-bins or the like. Non-compliance with this requirement may result in the issue of a notice by Council to stop all work on the site. Reason To protect the amenity of the public domain. BEFORE ISSUE OF AN OCCUPATION CERTIFICATE (9) WASTE AND RECYCLING MANAGEMENT - COMMERCIAL Prior to the issue of an Occupation Certificate, the Principal Certifier is to ensure all waste management, collection, loading and supporting infrastructure is provided in accordance with…
D/2025/940/A Page 4 be submitted to and approved by Council prior to the erection or display of any such signs. Reason To require separate consent to be obtained for any additional signs. (5) WASTE AND RECYCLING MANAGEMENT - GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development. BUILDING WORK BEFORE BUILDING WORK…
Park Road (Neighbour’s tree) Reason To identify the trees that cannot be removed and must be retained and protected. (5) WASTE AND RECYCLING MANAGEMENT - GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development. BUILDING WORK BEFORE ISSUE OF A CONSTRUCTION CERTIFICATE (6) STORMWATER AND DRAINAGE - MINOR DEVELOPMENT The…
Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development. D/2026/115 Page 4 BUILDING WORK BEFORE ISSUE OF A CONSTRUCTION CERTIFICATE (5) APPROVED ACOUSTIC REPORT The acoustic Logic Pty Ltd dated 2 February 2026, ref 20260002/0202A/R0/AR, titled 133 Oxford Street, Darlinghurst – Rooftop Bar Terrace – Acoustic Barrier Wall is approved. Where there is a conflict between the approved acoustic report…
(7) NO AIR CONDITIONING UNITS TO FACADE OR BALCONIES OF BUILDING Approval is not granted for the installation of individual air conditioning units to the facade or balconies of the building. Reason To clarify the scope of the consent. (8) WASTE AND RECYCLING MANAGEMENT – GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste D/2025/1126/B Page 5 Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all…
4282. Reason D/2025/1112 Page 6 To ensure signage illumination is designed in accordance with the Australian Standards. (9) WASTE AND RECYCLING MANAGEMENT - GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development. BUILDING WORK BEFORE ISSUE OF A CONSTRUCTION CERTIFICATE (10) LANDSCAPE MAINTENANCE PLAN (a) Prior to the…
Construction Certificate. Car Parking Type Number Residential spaces 1 Reason To ensure the allocation of parking is in accordance with the Council’s DCP. (7) WASTE AND RECYCLING MANAGEMENT – GENERAL The proposal must comply with the relevant provisions of the Sydney Development Control Plan 2012 and Council's Guidelines for Waste Management in New Developments 2018, which requires facilities to promote the safe and efficient storage, separation, collection and handling of waste to maximise resource recovery. Reason To ensure that waste and recycling is appropriately managed throughout all phases of the development. D/2025/1173 Page 6
Activities On and Above Roads’ for further information. Reason To protect the amenity of the public domain. (8) NO OBSTRUCTION OF PUBLIC WAY Unless otherwise approved by Council, the public way must not be obstructed by any materials, vehicles, waste receptacles, skip-bins or the like. Non-compliance with this requirement may result in the issue of a notice by Council to stop all work on the site. Note: Refer to the City’s ‘Code of Practice: Hoisting and Construction Activities On and Above Roads’ for further information. Reason To protect the amenity of the public domain. 37
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Waste Management conditions in other councils
Burwood
58 conditions
Willoughby
47 conditions
Wollongong
35 conditions
City of Parramatta
30 conditions
City of Ryde
27 conditions
Hornsby
27 conditions
Ku-ring-gai
26 conditions
Lane Cove
24 conditions
Fairfield
19 conditions
Camden
17 conditions
Waverley
14 conditions
Inner West
13 conditions
Wollondilly
13 conditions
Cumberland
12 conditions
Canterbury-Bankstown
11 conditions
Bayside
10 conditions
Canada Bay
10 conditions
Randwick
9 conditions
Campbelltown
8 conditions
Strathfield
8 conditions
Georges River
7 conditions
Newcastle
7 conditions
Sutherland
7 conditions
Liverpool
5 conditions
Hawkesbury
3 conditions