Campbelltown Waste Management Conditions

8 waste management conditions imposed by Campbelltown across 3 development applications in our dataset. Waste management conditions cover how waste is stored, collected and minimised — waste management plans, bin storage rooms, recycling provision and access for collection vehicles.

Condition 18 584/2024/DA-SL det. 05/11/2024 Seniors Living

18. Waste Management The premises shall comply with the following waste management practices at all times: a. The business operator must enter into a commercial waste contract agreement for regular waste and recycling collection and disposal with a suitably licensed contractor. A copy of the waste agreement must be available for inspection upon request by Council. b. The approved Waste Management Plan (WMP) must be implemented throughout the ongoing use of the development. c. The landowner is responsible for the ongoing maintenance, repair, and replacement of all equipment related to waste management within the development. This includes, but is not limited to, waste chutes, compaction…

Condition 53 4712/2024/DA-SL det. 07/08/2025 Senior Living

53. Bin storage room construction A design certificate and detailed plans are to accompany any crown works certificate application which demonstrate that the bin storage room has been designed to be constructed in accordance with the approved (Revised) Waste Management Plan and including the following requirements: a) Storage is provided for all allocated bins and is appropriately dimensioned to enable safe and convenient bin movement, maintenance and cleaning and the storage of bin handling equipment. This includes a minimum of 1.5m aisle width between rows of DET001 4712/2024/DA-SL PAGE 15 bins and spacing of 50cm between all allocated bins; b) The floor is to be constructed of concrete…

Condition 24 293/2025/DA-RA det. 04/11/2025 Residential Apartment

24. Waste signage Adequate signage is to be provided and maintained on how to use the waste management system and what materials are acceptable for recycling within all waste storage areas of the development. All signage must comply with Council’s specifications for waste collection. Signage is also to be provided and maintained which clearly identifies which bins (and containers) are to be used for general waste and recycling and what materials can be placed in each bin. Reason: Comply with approval and support planning outcomes in Campbelltown SC DCP 2015.

Condition 30 4712/2024/DA-SL det. 07/08/2025 Senior Living

30. Signage Adequate signage is to be provided and maintained on how to use the waste management system and what materials are acceptable for recycling within all waste storage areas of the development. Signage is also to be provided and maintained which clearly identifies which bins (and containers) are to be used for general waste and recycling and what materials can be placed in each bin. Condition reason: Comply with approval and support planning outcomes in Campbelltown SC DCP 2015. D01.999 DET001 4712/2024/DA-SL PAGE 10

Condition 17 293/2025/DA-RA det. 04/11/2025 Residential Apartment

17. Rubbish/recycling bin storage The rubbish and recycling bins shall not be stored within vehicle parking, vehicle manoeuvring areas or landscaped areas. The bin(s) shall only be stored in accordance with the approved plans. Condition reason: To ensure waste storage does not impact areas required to be dedicated to vehicle access and landscaping.

Condition 40 4712/2024/DA-SL det. 07/08/2025 Senior Living

40. Waste Management Plan Before the issue of a crown works certificate, the relevant provisions of Council’s Waste Management Plan is to be completed to the satisfaction of Council. Condition reason: To ensure resource recovery is promoted and local amenity protected during construction. D02.06

Condition 27 4712/2024/DA-SL det. 07/08/2025 Senior Living

27. Waste Management Plan Implementation The approved WMP is to be implemented throughout the ongoing use of the development. Condition reason: Comply with approval and support planning outcomes in Campbelltown SC DCP 2015. D01.999

Condition 21 293/2025/DA-RA det. 04/11/2025 Residential Apartment

21. Waste management plan implementation The approved WMP is to be implemented throughout the ongoing use of the development. Reason: To ensure waste is managed in an orderly fashion.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.