Hornsby Waste Management Conditions

27 waste management conditions imposed by Hornsby across 6 development applications in our dataset. Waste management conditions cover how waste is stored, collected and minimised — waste management plans, bin storage rooms, recycling provision and access for collection vehicles.

Condition 34 DA/850/2011/G det. 19/03/2026 Section 4.55(2) Modification to Seniors Living Development Apartment Buildings

34. Compliance with the Waste Management Plan (Mod G) For each stage of works, prior to the issue of the occupation certificate for that stage, a report(s) must be prepared by the principal contractor and submitted to the principal certifying authority after the completion of each stage, including the following: 22 a) A comparison of the estimated quantities of each waste type against the actual quantities of each waste type. b) Any deviations from the Waste Management Plan (including, but not limited to, types of waste, quantities of waste, destinations of waste, reuse and recycling achieved) have been explained and any opportunities to improve the management of waste in future stages or…

Condition 52 DA/850/2011/G det. 19/03/2026 Section 4.55(2) Modification to Seniors Living Development Apartment Buildings

52. On-site Sewerage Disposal Facility (Mod B & E) a) An on-site sewage management system, separately approved under the Local Government Act 1993, must be installed, commissioned and certified by a licensed plumber in accordance with Australian Standard 1547 - Onsite Domestic Wastewater Management (2000) and Environment & Health Protection Guidelines - Onsite Sewage Management for Single Households (1998) - On-site domestic wastewater management and Management of Private Recycled Water Schemes. b) All construction works including the road works relating to the approved on-site sewerage management facility must be completed and be operational. c) In the event where a sewer connection is…

Condition 36 DA/850/2011/G det. 19/03/2026 Section 4.55(2) Modification to Seniors Living Development Apartment Buildings

36. Garbage Collection Easement For the purpose of waste collection, an easement entitling Council, its servants and agents and persons authorised by it to enter upon the subject land and to operate thereon, vehicles and other equipment for the purposes of waste collection must be granted to Council by the owner of the land after the completion of each stage of the development. Note: The easement must be in a form prescribed by Council and must include covenants to the effect that parties will not be liable for any damage caused to the subject land or any part thereof or to any property located therein or thereon by reason of the operation thereon of any vehicle or other equipment used in…

Condition 11 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

11. In these consent conditions, recycling and recyclables refers to all waste streams that are recycled (including but not limited to mixed recycling (glass and plastic bottles, steel and aluminium cans etc), paper/cardboard, food organics, and garden organics) and are collected separately from general waste (garbage) that goes to landfill. In accordance with the Protection of the Environment Operations Act 1997, the definition of waste includes any unwanted substance, regardless of whether it is reused, recycled or disposed to landfill. Reason: to ensure the efficient and effective on-going management of waste for the operational life of the development. - End of Conditions -

Condition 13 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

13. The communal bin storage rooms must include a cleaner’s sink with water for cleaning, graded floors with drainage to sewer, smooth sealed and impervious surfaces, and have artificial lighting, ventilation in compliance with AS1668, robust door(s) and must be lockable (but able to be opened from inside the room without a key). Reason: To ensure all necessary infrastructure is provided for the efficient and effective management of waste for the full operational life of the development. Completion of external works and waste infrastructure

Condition 9 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

9. The doors to the communal bin storage rooms must be robust, close fitting and self- closing. The doors must be lockable and capable of being opened from the inside without a key. The doors must be able to be opened using a PIN code. Any door swing must not block access to the bins and must not block the pathway for moving bins to the collection vehicle. Swing doors should open outwards 180 degrees and must be able to be locked open. No bins are to be stored within the door swing.

Condition 7 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

7. Whether the waste is expected to be reused, recycled or go to landfill. Note: In accordance with the Protection of the Environment Operations Act 1997, the definition of waste includes any unwanted substance, regardless of whether it is reused, recycled or disposed to landfill. Reason: To ensure waste removed from the site is appropriately disposed of and to protect the environment and local amenity during work. Storage and Removal of Waste

Condition 10 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

10. The Owners Corporation or property owner via an authorised representative, must report back to owners and occupiers at regular intervals (no less than annually) regarding the how well waste streams have been separated into the correct bins, proper use of the bulky waste system, any investigations and corrective actions for non- conformances, and any other operational waste issues.

Condition 36 DA/1024/2021/B det. 13/03/2025 4.55(2) Modification - Seniors housing development

36. Waste Management Details (modified - Mod B) a) Prior to the commencement of each stage of works, the on-going waste collection service to the buildings to be demolished must be cancelled and the bins retrieved by the waste collection service provider. b) The on-going collection of waste from occupied buildings must not be impeded by construction works.

Condition 1 DA/820/2024 det. 20/06/2025 Sandstone Quarry

1. No building materials, skip bins, concrete pumps, cranes, machinery, temporary traffic control, signs or vehicles associated with the development shall be stored or placed on Council's footpath, nature strip, roadway, park or reserve without the prior approval being issued by Council under section 138 of the Roads Act 1993. DA/820/2024 Pag e | 7

Condition 4 DA/975/2023 det. 09/12/2024 Redevlopment of Westleigh park

4. The required Waste Classification Certificate must be provided to the Principal Contractor prior to fill being imported to the site and made available to Council at its request. Reason: To ensure soil removed from the site is appropriately disposed of and soil imported to the site is not contaminated and is safe for future occupants.

Condition 5 DA/14/2024 det. 15/07/2024 Change of use of part of site to a Waste or Resource Transfer Station – Hornsby Community…

5. Where council does not provide commercial garbage and recyclable materials collection services: a. A contract must be entered into with a licensed contractor to provide these services for the premises; and b. A copy of the contract must be kept on premises and provided to relevant authorities including council officers on request.

Condition 5 DA/975/2023 det. 09/12/2024 Redevlopment of Westleigh park

5. Where council does not provide commercial garbage and recyclable materials collection services: a. A contract must be entered into with a licensed contractor to provide these services for the premises; and b. A copy of the contract must be kept on premises and provided to relevant authorities including council officers on request.

Condition 7 DA/975/2023 det. 09/12/2024 Redevlopment of Westleigh park

7. All liquid trade waste pre-treatment devices must be regularly maintained to remain effective in accordance with the conditions of the liquid trade waste approval issued by the relevant water authority. Reason: To ensure proper handling of waste, garbage and recyclable materials generated during operation of the premises.

Condition 8 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

8. All lockable doors and gates, both pedestrian and vehicular, that are required to be opened by Council’s waste collection contractor in the provision of waste collection services, must be able to be opened using a pin code. That is, locks requiring keys, remote controls, key fobs etc are not acceptable.

Condition 50 DA/1024/2021/B det. 13/03/2025 4.55(2) Modification - Seniors housing development

50. Waste Management (modified - Mod B) a) All work relevant to each of Stages 1, 2, 3, 4 and 5 must be carried out in accordance with the approved waste management plan. b) Stockpiling, cutting and sanding must be performed a minimum of 10 metres from Tom Thumb Lagoon and be screened by sediment fencing.

Condition 6 DA/14/2024 det. 15/07/2024 Change of use of part of site to a Waste or Resource Transfer Station – Hornsby Community…

6. Where the collection of garbage and recyclable materials from the premises is undertaken by a licensed contractor, it must only occur during the approved operating hours. Reason: To ensure proper handling of waste, garbage and recyclable materials generated during operation of the premises.

Condition 58 DA/820/2024 det. 20/06/2025 Sandstone Quarry

58. Deliveries and Waste Collection Hours During ongoing quarry operations and rehabilitation activities, all deliveries, waste and recycling collection must only occur during the approved hours of operation. Reason: To protect the amenity of the local area.

Condition 104 DA/975/2023 det. 09/12/2024 Redevlopment of Westleigh park

104. Deliveries and Waste Collection Hours During ongoing use, all deliveries, waste and recycling collection must only occur during the approved hours of operation. Reason: To protect the amenity of the local area. Attachment A: Draft Conditions Page 48

Condition 53 DA/975/2023 det. 09/12/2024 Redevlopment of Westleigh park

53. Waste Management All work must be carried out in accordance with the approved waste management plan. Reason: To ensure the management of waste to protect the environment and local amenity during construction.

Condition 2 DA/14/2024 det. 15/07/2024 Change of use of part of site to a Waste or Resource Transfer Station – Hornsby Community…

2. All garbage and recyclable materials generated from the premises must be stored wholly within any approved storage area and must not be stored outside the premises (including any public place) at any time.

Condition 4 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

4. A dedicated bulky waste storage room of no less than 8 square metres for each building. Note: Bulk waste storage is acceptable on the grassed section adjacent each bin storage room.

Condition 42 DA/850/2011/G det. 19/03/2026 Section 4.55(2) Modification to Seniors Living Development Apartment Buildings

42. Site Security Site security measures implemented on the property, including electronic gates, must not prevent access to the bin collection points by waste removal services.

Condition 12 DA/254/2025 det. 22/10/2025 Seniors Living 48 Units

12. All bin storage room(s) and bulky waste storage room(s) must be free from meters, power boards, piping and any other obstructions.

Condition 59 DA/975/2023 det. 09/12/2024 Redevlopment of Westleigh park

59. Storage and Removal of Waste All control measures nominated in the Waste Management Plan must be implemented and include:

Condition 4 DA/14/2024 det. 15/07/2024 Change of use of part of site to a Waste or Resource Transfer Station – Hornsby Community…

4. Any approved waste storage area must be appropriately maintained to prevent litter and the entry of pests.

Condition 3 DA/14/2024 det. 15/07/2024 Change of use of part of site to a Waste or Resource Transfer Station – Hornsby Community…

3. Arrangements must be implemented for the separation of recyclable materials from garbage.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.