City of Sydney Stormwater Conditions

10 stormwater conditions imposed by City of Sydney across 10 development applications in our dataset. Stormwater conditions control how a development collects, detains and discharges rainwater runoff — on-site detention (OSD), drainage easements, water-sensitive urban design and connection to council drainage systems.

D/2025/1082

Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities relating to: the collection of stormwater, the reuse of stormwater, the detention of stormwater, the controlled release of stormwater, and connections to easements and public stormwater…

D/2025/1100

Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities relating to: the collection of stormwater, the reuse of stormwater, the detention of stormwater, the controlled release of stormwater, and connections to easements and public stormwater…

D/2025/1176

Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities relating to: the collection of stormwater, the reuse of stormwater, the detention of stormwater, the controlled release of stormwater, and connections to easements and public stormwater…

D/2025/1096

Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities relating to: the collection of stormwater, the reuse of stormwater, the detention of stormwater, the controlled release of stormwater, and connections to easements and public stormwater…

D/2025/1133

Certifier prior to the issue of a construction certification. Reason D/2025/1133 Page 4 To ensure that dilapidation reports are prepared and to identify damage to for adjoining/nearby properties resulting from building work on the development site. (6) STORMWATER AND DRAINAGE - MINOR DEVELOPMENT The drainage system is to be constructed in accordance with the City's standard requirements as detailed in the City of Sydney’s Stormwater Drainage Manual. The development is to be designed so that the flow of pollutants from the site due to stormwater is reduced. The requirements of Sydney Water regarding the on-site detention (OSD) of stormwater must be ascertained and complied with. Evidence of…

D/2025/1132/A

Assessment Act 1979. Note: Refer also to the City’s ‘Code of Practice: Hoisting and Construction Activities On and Above Roads’ for further information. Reason To protect the amenity of the surrounding area. (12) EROSION AND SEDIMENT CONTROL - LESS THAN 250SQM Where less than 250 square metres are being disturbed, no formal plan is required however, the site is to be provided with sediment control measures and these must be implemented so that sediment, including soil, excavated material, building material or other materials cannot fall, descend, percolate, be pumped, drained, washed or allowed to flow to the street, stormwater system or waterways. Reason To ensure that appropriate erosion…

D/2025/954

Note: Refer also to the City’s ‘Code of Practice: Hoisting and Construction Activities On and Above Roads’ for further information. Reason To protect the amenity of the surrounding area. 35 (4) EROSION AND SEDIMENT CONTROL - LESS THAN 250SQM Where less than 250 square metres are being disturbed, no formal plan is required however, the site is to be provided with sediment control measures and these must be implemented so that sediment, including soil, excavated material, building material or other materials cannot fall, descend, percolate, be pumped, drained, washed or allowed to flow to the street, stormwater system or waterways. Reason To ensure that appropriate erosion and sediment…

D/2025/1059

Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities relating to: the collection of stormwater, the reuse of stormwater, the detention of stormwater, the controlled release of stormwater, and connections to easements and public stormwater…

D/2025/1071

Principal certifier means the certifier appointed as the principal certifier for building work or subdivision work under section 6.6(1) or 6.12(1) of the EP&A Act respectively. Site work means any work that is physically carried out on the land to which the development the subject of this development consent is to be carried out, including but not limited to building work, subdivision work, demolition work, clearing of vegetation or remediation work. Stormwater drainage system means all works and facilities relating to: the collection of stormwater, the reuse of stormwater, the detention of stormwater, the controlled release of stormwater, and connections to easements and public stormwater…

D/2025/1171

Contribution Category Amount Open Space $12,875.00 Community Facilities $2,563.00 Traffic and Transport $3,269.00 D/2025/1171 Page 4 Stormwater Drainage $1,293.00 Total $20,000.00 The City of Sydney will index the above contribution for inflation at the time of payment using the following formula. Cpayment = Cconsent x (CPIpayment ÷ CPIconsent) Where: Cpayment = Is the contribution at time of payment; Cconsent = Is the contribution at the time of consent, as shown above; CPIpayment = Is the Consumer Price Index (All Groups Index) for Sydney published by the Australian Bureau of Statistics that applies at the time of payment; and CPI1consent = Is the Consumer Price Index (All Groups Index)…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.