Camden Waste Management Conditions
17 waste management conditions imposed by Camden across 8 development applications in our dataset. Waste management conditions cover how waste is stored, collected and minimised — waste management plans, bin storage rooms, recycling provision and access for collection vehicles.
2. The owner of the adjoining land gives written consent to the condition not applying. Condition reason: Prescribed condition under section 74 of the Environmental Planning and Assessment Regulation 2021. (21) Anti-graffiti finish - While building work is being carried out, an anti-graffiti finish must be applied to all external facing and publicly accessible building elements (including retaining walls), to the satisfaction of the principal certifier Condition reason: To protect building structures that directly front the street from graffiti application. (22) Salinity Management – The installation of services, infrastructure, and construction of the proposed development is to comply with…
2. The owner of the adjoining land gives written consent to the condition not applying. Condition reason: Prescribed condition under section 74 of the Environmental Planning and Assessment Regulation 2021. (23) Salinity Management Plan - Installation of services and all buried concrete and steel structures are to comply with the recommendations outlined in Salinity Management Plan, 63 & 65 O’Keefe Drive and 24 & 26 Mary Fairfax Drive, Oran Park, NSW, prepared by Alliance, dated 11 March 2025, Project 18460-ER-2-1 (Rev 0) Condition reason: To ensure compliance with the salinity management plan. (24) Acoustic Compliance - Construction of the childcare centre is to comply with the façade…
2. The owner of the adjoining land gives written consent to the condition not applying. Condition reason: Prescribed condition under section 74 of the Environmental Planning and Assessment Regulation 2021. (18) Swimming pool and/or spa filling - While building work is being carried out, the swimming pool and/or spa must not be filled with water until the safety fencing required by this development consent has been installed. The principal certifier must inspect the fencing prior to the filling. Condition reason: To ensure that safety fencing has been installed before the swimming pool and/or spa is filled. (19) Material sampling and testing - While building work is being carried out and…
2. The owner of the adjoining land gives written consent to the condition not applying. Condition reason: Prescribed condition under section 74 of the Environmental Planning and Assessment Regulation 2021. (17) Salinity management - All earthworks, construction, landscaping and associated infrastructure must be carried out in accordance with Section 3.5 of the approved salinity management report titled “Preliminary Salinity and Geotechnical Assessment: Proposed Anglican School, Corner of 26 Byron Road and 50 Heath Road, Leppington, reference P1504640JR02V01” prepared by Martens Consulting Engineers, dated May 2015. Condition reason: To ensure works are carried out in accordance with the…
2. Crown building work certified to comply with the Building Code of Australia under Part 6 of the Environmental Planning and Assessment Act 1979. Condition reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021. 2.2 - During Demolition Work (1) Priority (noxious) weeds management (during work) - While demolition work is being carried out, weed dispersion must be minimised and weed infestations must be managed under the Biosecurity Act 2015 and the Biosecurity Regulation 2017. Any priority (noxious) or environmentally invasive weed infestations that occur during works must be fully and continuously suppressed and destroyed by appropriate…
5. The property owner will indemnify Council and all adjoining property owners against damage to their properties arising from the failure of any component of the facilities or the failure to clean, maintain and repair the facilities. Condition reason: To provide a legal mechanism for the long-term maintenance of water management facilities. (8) Development registration with Council - Before the issue of an occupation certificate, the development must be inspected by and registered with Council. Evidence of the inspection and registration must be provided to the principal certifier. Condition reason: To support Council’s regulatory functions related to the development. (9) Services - Before…
2. AS 1668.2 - The Use of Ventilation and Air Conditioning in Buildings - Mechanical Ventilation in Buildings. Condition reason: To ensure that mechanical ventilation system(s) are provided where natural ventilation is not achieved. (11) Waste rooms - Before the issue of a construction certificate, information must be prepared by a suitably qualified person and demonstrate, to the certifier’s satisfaction, that the waste rooms will comply with the following detailed design requirements:
4. An additional Ulmus parvifolia shall be planted within the ground floor north landscaped courtyard. OFFICIAL Condition reason: To ensure that detailed landscaping requirements are documented. (13) Waste rooms - Before the issue of a construction certificate, information must be prepared by a suitably qualified person and demonstrate, to the certifier’s satisfaction, that the waste rooms will comply with the following detailed design requirements:
2. No contributions or levies have been required since the document was issued. Condition reason: To require evidence that a special infrastructure contribution has been paid if required. OFFICIAL (4) Services - Before the issue of an occupation certificate, the following information from energy, water and wastewater service suppliers must be obtained and provided to the principal certifier:
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste OFFICIAL facilities, the retention of tipping dockets and their production to Council upon request.
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste facilities, the retention of tipping dockets and their production to Council upon request.
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste facilities, the retention of tipping dockets and their production to Council upon request.
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste facilities, the retention of tipping dockets and their production to Council upon request.
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste facilities, the retention of tipping dockets and their production to Council upon request.
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste facilities, the retention of tipping dockets and their production to Council upon request.
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste facilities, the retention of tipping dockets and their production to Council upon request.
8. Waste generation volumes, waste reuse and recycling methods, waste classification in accordance with NSW Environment Protection Authority waste classification guidelines, hazardous waste management, disposal at waste facilities, the retention of tipping dockets and their production to Council upon request.
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Waste Management conditions in other councils
Burwood
58 conditions
Willoughby
47 conditions
Wollongong
35 conditions
City of Parramatta
30 conditions
City of Ryde
27 conditions
Hornsby
27 conditions
Ku-ring-gai
26 conditions
Lane Cove
24 conditions
Fairfield
19 conditions
City of Sydney
18 conditions
Waverley
14 conditions
Inner West
13 conditions
Wollondilly
13 conditions
Cumberland
12 conditions
Canterbury-Bankstown
11 conditions
Bayside
10 conditions
Canada Bay
10 conditions
Randwick
9 conditions
Campbelltown
8 conditions
Strathfield
8 conditions
Georges River
7 conditions
Newcastle
7 conditions
Sutherland
7 conditions
Liverpool
5 conditions
Hawkesbury
3 conditions