9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Wollongong Waste Management Conditions

35 waste management conditions imposed by Wollongong across 6 development applications in our dataset. Waste management conditions cover how waste is stored, collected and minimised — waste management plans, bin storage rooms, recycling provision and access for collection vehicles.

DA-2023/962 det. 22/11/2024

The implementation of a landscape maintenance program in accordance with the approved Landscape Plan for a minimum period of 12 months to ensure that all landscape work becomes well established by regular maintenance. Details of the program must be submitted with the Landscape Plan to the Principal Certifier prior to issue of the Construction Certificate. Reason: To comply with Council's Development Control Plan. • Tree Protection Measures The existing trees are to be retained upon the subject property and any trees on adjoining properties shall not be impacted upon during the excavation or construction phases of the development. This will require the installation and maintenance of…

Condition 102 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

102. Waste management While building work is being carried out, the Principal Certifier must be satisfied all waste management is undertaken in accordance with the approved waste management plan. Upon disposal or removal of the waste, records of the disposal or other fate (such as re-use on site) must be compiled and provided to the Principal Certifier, detailing the following: • The name and contact details of the person(s) who removed the waste; • The waste carrier vehicle registration; • The date and time of waste collection; • A description of the waste (type of waste, classification and estimated quantity) and whether the waste is expected to be reused, recycled or go to landfill or…

Condition 102 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

102. Waste Management While building work is being carried out, the Principal Certifier must be satisfied all waste management is undertaken in accordance with the approved waste management plan. Upon disposal or removal of the waste, records of the disposal or other fate (such as re-use on site) must be compiled and provided to the Principal Certifier, detailing the following: • The name and contact details of the person(s) who removed the waste; • The waste carrier vehicle registration; • The date and time of waste collection; • A description of the waste (type of waste, classification and estimated quantity) and whether the waste is expected to be reused, recycled or go to landfill or…

Condition 143 DA-2023/767 det. 17/12/2024 The Globe Project

143. Waste management While building work is being carried out, the principal certifier must be satisfied all waste management is undertaken in accordance with the approved waste management plan. Upon disposal of waste, the applicant is to compile and provide records of the disposal to the principal certifier, detailing the following:  The name and contact details of the person(s) who removed the waste;  The waste carrier vehicle registration;  The date and time of waste collection;  A description of the waste (type of waste, classification and estimated quantity) and whether the waste is expected to be reused, recycled or go to landfill or other fate;  The contact details and address…

Condition 139 DA-2023/767 det. 17/12/2024 The Globe Project

139. Waste management While building work is being carried out, the principal certifier must be satisfied all waste management is undertaken in accordance with the approved waste management plan. Upon disposal of waste, the applicant is to compile and provide records of the disposal to the principal certifier, detailing the following: • The name and contact details of the person(s) who removed the waste; • The waste carrier vehicle registration; • The date and time of waste collection; • A description of the waste (type of waste, classification and estimated quantity) and whether the waste is expected to be reused, recycled or go to landfill or other fate; • The contact details and address…

Condition 66 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

66. Waste Management While building work is being carried out, the principal certifier must be satisfied all waste management is undertaken in accordance with the approved waste management plan. Upon disposal of waste, the applicant is to compile and provide records of the disposal to the principal certifier, detailing the following: • The name and contact details of the person(s) who removed the waste; • The waste carrier vehicle registration; • The date and time of waste collection; • A description of the waste (type of waste, classification and estimated quantity) and whether the waste is expected to be reused, recycled or go to landfill or other fate; • The contact details and address…

Condition 67 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

67. Waste Management While building work is being carried out, the principal certifier must be satisfied all waste management is undertaken in accordance with the approved waste management plan. Upon disposal of waste, the applicant is to compile and provide records of the disposal to the principal certifier, detailing the following:  The name and contact details of the person(s) who removed the waste;  The waste carrier vehicle registration;  The date and time of waste collection;  A description of the waste (type of waste, classification and estimated quantity) and whether the waste is expected to be reused, recycled or go to landfill or other fate;  The contact details and address…

Condition 110 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

110. Repair of Infrastructure At the completion of works and prior to the release of an Occupation Certificate: a. All public domain works must be completed to Council's satisfaction b. any public infrastructure damaged as a result of the carrying out of work approved under this consent (including damage caused by, but not limited to, delivery vehicles, waste collection, contractors, sub-contractors, concreting vehicles) must be fully repaired to the written satisfaction of Council, and at no cost to Council, or c. if the works in (a) are not carried out to Council’s satisfaction, Council may carry out the works required and the costs of any such works must be paid as directed by Council…

Condition 169 DA-2023/767 det. 17/12/2024 The Globe Project

169. Repair of Infrastructure Before the issue of the occupation certificate: a. All public domain works must be completed to Council's satisfaction b. any public infrastructure damaged as a result of the carrying out of work approved under this consent (including damage caused by, but not limited to, delivery vehicles, waste collection, contractors, sub-contractors, concreting vehicles) must be fully repaired to the written satisfaction of Council, and at no cost to Council, or c. if the works in (a) are not carried out to Council’s satisfaction, Council may carry out the works required and the costs of any such works must be paid as directed by Council and in the first instance will be…

Condition 173 DA-2023/767 det. 17/12/2024 The Globe Project

173. Removal of Waste upon Completion Before the issue of an Occupation Certificate, the Principal Certifier must ensure all refuse, spoil and material unsuitable for use on-site is removed from the site and disposed of in accordance with the approved waste management plan. Written evidence of the removal just be supplied to the satisfaction of the Principal Certifier. Before the issue of a partial Occupation Certificate, the applicant must ensure the temporary storage of any waste is carried out in accordance with the approved waste management plan to the Principal Certifier's satisfaction. Reason: To ensure waste material is appropriately disposed or satisfactorily stored.

Condition 167 DA-2023/767 det. 17/12/2024 The Globe Project

167. Removal of Waste upon Completion Before the issue of an Occupation Certificate, the Principal Certifier must ensure all refuse, spoil and material unsuitable for use on-site is removed from the site and disposed of in accordance with the approved waste management plan. Written evidence of the removal just be supplied to the satisfaction of the Principal Certifier. Before the issue of a partial Occupation Certificate, the applicant must ensure the temporary storage of any waste is carried out in accordance with the approved waste management plan to the Principal Certifier's satisfaction. Reason: To ensure waste material is appropriately disposed or satisfactorily stored.

Condition 97 DA-2023/785 det. 10/05/2024 Group Home

97. Removal of waste upon completion Before the issue of an Occupation Certificate, the Principal Certifier must ensure all refuse, spoil and material unsuitable for use on-site is removed from the site and disposed of in accordance with the approved waste management plan. Written evidence of the removal must be supplied to the satisfaction of the Principal Certifier. Before the issue of a partial Occupation Certificate, the applicant must ensure the temporary storage of any waste is carried out in accordance with the approved waste management plan to the Principal Certifier's satisfaction. Reason: To ensure waste material is appropriately disposed or satisfactorily stored.

Condition 101 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

101. Asbestos Waste Collection, Transportation and Disposal Asbestos waste must be prepared, contained, transported and disposed of in accordance with SafeWork NSW and NSW Environment Protection Authority requirements. Asbestos waste must only be disposed of at a landfill site that can lawfully receive this this type of waste. A receipt must be retained and submitted to the Principal Certifier, and a copy submitted to Council (in the event that Council is not the Principal Certifier), prior to commencement of the construction works. Reason: To satisfy the requirements of the legislation.

Condition 136 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

136. Removal of waste upon completion Before the issue of an Occupation Certificate: a. all refuse, spoil and material unsuitable for use on-site must be removed from the site and disposed of in accordance with the approved waste management plan, and b. written evidence of the waste removal must be provided to the satisfaction of the Principal Certifier. c. Any chemical waste generated throughout construction must be disposed of to an approved waste management facility or otherwise lawfully managed. Reason: To ensure waste material is appropriately disposed or satisfactorily stored.

Condition 136 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

136. Removal of Waste Upon Completion Before the issue of an Occupation Certificate: a. all refuse, spoil and material unsuitable for use on-site must be removed from the site and disposed of in accordance with the approved waste management plan, and b. written evidence of the waste removal must be provided to the satisfaction of the Principal Certifier. c. Any chemical waste generated throughout construction must be disposed of to an approved waste management facility or otherwise lawfully managed. Reason: To ensure waste material is appropriately disposed or satisfactorily stored.

Condition 114 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

114. Removal of waste upon completion Before the issue of an Occupation Certificate, the Principal Certifier must ensure all refuse, spoil and material unsuitable for use on-site is removed from the site and disposed of in accordance with the approved waste management plan. Written evidence of the removal must be supplied to the satisfaction of the Principal Certifier. Any chemical waste generated throughout construction must be disposed of to an approved waste management facility or otherwise lawfully managed. Reason: To ensure waste material is disposed of appropriately.

Condition 116 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

116. Removal of waste upon completion Before the issue of an Occupation Certificate, the Principal Certifier must ensure all refuse, spoil and material unsuitable for use on-site is removed from the site and disposed of in accordance with the approved waste management plan. Written evidence of the removal must be supplied to the satisfaction of the Principal Certifier. Any chemical waste generated throughout construction must be disposed of to an approved waste management facility or otherwise lawfully managed. Reason: To ensure waste material is disposed of appropriately.

Condition 122 DA-2023/767 det. 17/12/2024 The Globe Project

122. Waste Management The developer must provide an adequate receptacle to store all waste generated by the development pending disposal. The receptacle must be regularly emptied and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and reusable materials. Reason: To protect neighbourhood amenity. While Building Work is Being Carried Out

Condition 119 DA-2023/767 det. 17/12/2024 The Globe Project

119. Waste Management The developer must provide an adequate receptacle to store all waste generated by the development pending disposal. The receptacle must be regularly emptied and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and reusable materials. Reason: To protect neighbourhood amenity. While Building Work is Being Carried Out

Condition 133 DA-2023/767 det. 17/12/2024 The Globe Project

133. Provision of Waste Receptacle The developer must provide an adequate receptacle to store all waste generated by the development, pending disposal. The receptacle must be regularly emptied and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and re-usable materials. Reason: To comply with Council's Development Control Plan.

Condition 92 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

92. Provision of Waste Receptacle The developer must provide an adequate receptacle to store all waste generated by the development, pending disposal. The receptacle must be regularly emptied, and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and re-usable materials. Reason: To comply with Council's Development Control Plan.

Condition 89 DA-2023/785 det. 10/05/2024 Group Home

89. Provision of Waste Receptacle The developer must provide an adequate receptacle to store all waste generated by the development, pending disposal. The receptacle must be regularly emptied and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and re-usable materials. Reason: To comply with Council's Development Control Plan.

Condition 73 DA-2023/895 det. 16/06/2025 Former Bulli Hospital

73. Provision of Waste Receptacle The developer must provide an adequate receptacle to store all waste generated by the development, pending disposal. The receptacle must be regularly emptied and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and re-usable materials. Reason: To comply with Council's Development Control Plan.

Condition 67 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

67. Provision of Waste Receptacle The developer must provide an adequate receptacle to store all waste generated by the development, pending disposal. The receptacle must be regularly emptied and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and re-usable materials. Reason: To comply with Council's Development Control Plan.

Condition 68 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

68. Provision of Waste Receptacle The developer must provide an adequate receptacle to store all waste generated by the development, pending disposal. The receptacle must be regularly emptied and waste must not be allowed to lie or accumulate on the property other than in the receptacle. Consideration should be given to the source separation of recyclable and re-usable materials. Reason: To comply with Council's Development Control Plan.

Condition 196 DA-2023/767 det. 17/12/2024 The Globe Project

196. Food Premises - Cleaner’s Sink Where floor wastes are not installed as a means of disposing of wastewater, a cleaner’s sink serviced with hot and cold water through taps fitted with hose connectors must be provided and located outside of areas where open food is handled (AS 4674:2004 Section 4.1.8). Reason: To comply with legislation and Australian Standards.

Condition 208 DA-2023/767 det. 17/12/2024 The Globe Project

208. Storage of Waste Bins and Waste All waste and bins associated with the development shall be stored within the waste storage rooms at all times. No waste shall be allowed to accumulate or shall be stored on or adjacent to the street frontage of the site at any time. Reason: To ensure protection of the environment and neighbourhood amenity.

Condition 202 DA-2023/767 det. 17/12/2024 The Globe Project

202. Storage of Waste Bins and Waste All waste and bins associated with the development shall be stored within the waste storage rooms at all times. No waste shall be allowed to accumulate or shall be stored on or adjacent to the street frontage of the site at any time. Reason: To ensure protection of the environment and neighbourhood amenity.

Condition 195 DA-2023/767 det. 17/12/2024 The Globe Project

195. Food Premises - Waste Storage Adequate storage facilities must be provided for garbage containers, containers for recyclable materials and compacters in an external area or in a room specifically for that purpose (AS 4674:2004 Section 2.4). Reason: To comply with legislation and Australian Standards.

Condition 189 DA-2023/767 det. 17/12/2024 The Globe Project

189. Food Premises - Waste Storage Adequate storage facilities must be provided for garbage containers, containers for recyclable materials and compacters in an external area or in a room specifically for that purpose (AS 4674:2004 Section 2.4). Reason: To comply with legislation and Australian Standards.

Condition 126 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

126. Waste Storage Adequate storage facilities must be provided for garbage containers, containers for recyclable materials and compacters in an external area or in a room specifically for that purpose (AS 4674:2004 Section 2.4). Reason: To comply with legislation and Australian Standards.

Condition 197 DA-2023/767 det. 17/12/2024 The Globe Project

197. Food Premises - Floor Waste The floor waste(s) must be fitted with a basket trap and grate and constructed in all stainless steel finish (AS 4674:2004 Section 4.1.8). Reason: To comply with legislation and Australian Standards.

Condition 191 DA-2023/767 det. 17/12/2024 The Globe Project

191. Food Premises - Floor Waste The floor waste(s) must be fitted with a basket trap and grate and constructed in all stainless steel finish (AS 4674:2004 Section 4.1.8). Reason: To comply with legislation and Australian Standards.

Condition 207 DA-2023/767 det. 17/12/2024 The Globe Project

207. On-site Waste Collection Only All waste collection is to be undertaken from within the site. On-street collection of waste is not permitted at any time. Reason: To comply with Council's waste requirements.

Condition 201 DA-2023/767 det. 17/12/2024 The Globe Project

201. On-site Waste Collection Only All waste collection is to be undertaken from within the site. On-street collection of waste is not permitted at any time. Reason: To comply with Council's waste requirements.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.