9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

City of Ryde BASIX Compliance Conditions

11 basix compliance conditions imposed by City of Ryde across 6 development applications in our dataset. BASIX conditions require residential development to meet NSW targets for water use, thermal comfort and energy efficiency, with the commitments on the BASIX certificate shown on plans and certified at completion.

LDA2025/0048 det. 28/08/2025

• building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building, or • Crown building work certified to comply with the Building Code of Australia under the Act, Part 6. • Condition Reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021. • Fulfilment of BASIX commitments • It is a condition of a development consent for the following that each commitment listed in a relevant BASIX certificate is fulfilled— • BASIX development, • BASIX optional development, if the development application was accompanied by a BASIX certificate. • Condition Reason:…

MOD2025/0062 det. 04/09/2025

• building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building, or • Crown building work certified to comply with the Building Code of Australia under the Act, Part 6. • Condition Reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021. • Fulfilment of BASIX commitments • It is a condition of a development consent for the following that each commitment listed in a relevant BASIX certificate is fulfilled— • BASIX development, • BASIX optional development, if the development application was accompanied by a BASIX certificate. • Condition Reason:…

MOD2025/0044 det. 27/08/2025

• Building Code of Australia. All building works approved by this consent must be carried out in accordance with the requirements of the Building Code of Australia. (Reason: Statutory requirement). • BASIX. Compliance with all commitments listed in BASIX Certificate number 1292681M_04 1786931M_04, dated 20 February 2024 9 April 2025. (Reason: Statutory requirement). • Spare • Support for neighbouring buildings. If the development involves excavation that extends below the base of the footings of a building on adjoining land, the person having the benefit of the development consent must, at the person’s own expense: • Protect and support the adjoining premises from possible damage from the…

Condition 133 MOD2024/0191 det. 13/02/2025 S4.56 modification to LDA2020/0199

133. Laundry facilities (Boarding House) - Washing machines and sinks shall be provided at a rate of one tub per ten rooms or one tub per twelve occupants (whichever is the greater) with a minimum WELS rating of 4 stars on the washing machines. Hot and Cold water shall be supplied to all washing machines and sinks. The internal clothes drying facilities shall be provided at a rate of one dryer per 10 rooms with a minimum energy star rating of 4 stars and shall be rated no less than one star below the maximum available energy star rating available at the time of installation. Each boarding room is to contain clothes washing facilities (i.e. a laundry) and it must be 1.1m2 and comprise a wash…

Condition 133 MOD2025/0030 det. 18/07/2025 S4.56 modification to LDA2020/0199

133. Laundry facilities (Boarding House) - Each boarding room is to contain clothes washing facilities (i.e. a laundry) and it must be 1.1m2 and comprise a wash tub and with a washing/dryer machine. Hot and Cold water shall be supplied to all washing machines and sinks. The washer/dryer is to have a minimum energy star rating of 4 stars. and shall be rated no less than one star below the maximum available energy star rating available at the time of installation. (Reason: To ensure provision of adequate and safe facilities).

Condition 174 MOD2024/0191 det. 13/02/2025 S4.56 modification to LDA2020/0199

174. BASIX. The submission of documentary evidence of compliance with all commitments listed in BASIX Certificate(s) below: • Buildings A, B & C: BASIX Certificate 1080973M_08 dated 20 November 2023 1080973M_09 dated 04 July 2024 and • Building D: 1082544M_04 dated 17 November 2022. 1082544M_06 dated 04 July 2024 (Reason: Statutory requirement).

Condition 3 MOD2024/0191 det. 13/02/2025 S4.56 modification to LDA2020/0199

3. BASIX. Compliance with all commitments listed in BASIX Certificate(s): - Buildings A, B & C: BASIX Certificate 1080973M_08 dated 20 November 2023 1080973M_09 dated 04 July 2024 and - Building D: 1082544M_04 dated 17 November 2022. 1082544M_06 dated 04 July 2024 (Reason: Statutory requirement).

Condition 116 MOD2025/0044 det. 27/08/2025 S4.56 Modification to LDA2022/0320

116. BASIX. The submission of documentary evidence of compliance with all commitments listed in BASIX Certificate(s) numbered 1292681M_04, dated 20 February 2024. (Reason: Statutory requirement).

Condition 162 MOD2025/0070 det. 20/10/2025 S4.56 Modification to LDA2019/0149

162. BASIX. The applicant must submit documentary evidence of compliance with all commitments listed in BASIX Certificate(s) numbered. 702957M_10 dated 15 December 2022.

Condition 3 MOD2025/0044 det. 27/08/2025 S4.56 Modification to LDA2022/0320

3. BASIX. Compliance with all commitments listed in BASIX Certificate number 1292681M_04, dated 20 February 2024. (Reason: Statutory requirement). 4. [Spare]

Condition 4 MOD2025/0070 det. 20/10/2025 S4.56 Modification to LDA2019/0149

4. BASIX..Compliance with all commitments listed in BASIX Certificate(s) numbered 702957M_10 dated 15 December 2022. 4 | P age

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.