Central Coast Contamination Conditions

6 contamination conditions imposed by Central Coast across 5 development applications in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.

Condition 1 DA/161/2024 det. 13/05/2025 Subdivision

1. PARAMETERS OF THIS CONSENT 1.1. Implement the development substantially in accordance with the plans and supporting documents listed below as submitted by the applicant and to which is affixed a Council stamp "Development Consent" unless modified by any following condition. Architectural Plans by: Barker Ryan Stewart Drawing Description Issue Date CC180099 Plan of Subdivision T 28/2/2025 CC180099-07 Sheets: 001, 002, 011, 021, 031, 041, 051, 061, 101-106, 121, 131-136, 151, 511-516, 611-617, 621-627, 701, 702, 711, 712, 721, 722, 901-922 Concept Civil Engineering Design For Development Application F 14/4/2025 LDD001-LDD003, LDD401-LDD420, LDD 701, LDD 702 Landscaping Plans (Moir…

Condition 3 DA/683/2024 det. 10/12/2025 Industrial - Metal Recycling Plant

3. PRIOR TO COMMENCEMENT OF ANY WORKS 3.1 All conditions under this section must be met prior to the commencement of any works. (GL008) 3.2 No activity is to be carried out on-site until the Construction Certificate has been issued, other than: • Site investigation for the preparation of the construction, and / or • Implementation of environmental protection measures, such as erosion control and the like that are required by this consent • Demolition approved by this consent. 3.3 Appoint a Principal Certifying Authority for the building work: • The Principal Certifying Authority (if not Council) is to notify Council of their appointment and notify the person having the benefit of the…

Condition 5 DA/683/2024 det. 10/12/2025 Industrial - Metal Recycling Plant

5. PRIOR TO ISSUE OF ANY OCCUPATION CERTIFICATE 5.1 All conditions under this section must be met prior to the issue of any Occupation Certificate. (GL020) 5.2 Obtain an Environmental Protection Licence from the NSW Environmental Protection Authority for the activity. 5.3 Obtain the Section 307 Certificate of Compliance under the Water Management Act 2000 for water and sewer requirements for the development from Central Coast Council as the Water Supply Authority, prior to issue of the Occupation Certificate. 5.4 Construct any additional civil works, where required by Council, to ensure satisfactory transitions to existing site formations and pavements where designs contained in the Roads…

DA/1380/2024 det. 22/08/2025

4.3. Stages 1 & 2 - Ensure a qualified arborist (AQF 5) is on-site to oversee the works in relation to tree protection measures during critical stages of construction. 4.4. Stages 1 & 2 - All care is to be taken to avoid damage to tree roots. Roots that can’t be avoided are to be cut (not ripped) with a sharp tool such as pruners or handsaw. Seek Arboricultural advice before severing roots greater than 75mm diameter. 4.5. Stages 1 & 2 - Implement all soil and water management control measures and undertake works in accordance with the approved Soil and Water Management Plan. Update the plan as required during all stages of the construction or in accordance with the ‘Blue Book’ (Managing…

DA/1629/2024 det. 18/09/2025

3.8. Revegetate and stabilise all areas disturbed by construction activities with suitable plants native to the Central Coast. The Project Ecologist is to recommend suitable species based on adjoining native plant communities. Comply with the requirements of the Road Opening Permit and the Road Occupancy Licence issued by Council. 3.10. Undertake works in accordance with the approved Construction Environment Management Plan. Immediately notify Council of any new information which comes to light during remediation, demolition or construction works which has the potential to alter previous conclusions about site contamination and remediation. Implement all erosion and sediment control…

DA/2113/2024 det. 15/01/2026

3.PRIOR TO COMMENCEMENT OF ANY WORKS 3.1. All conditions under this section must be met prior to the commencement of any works. 3.2 No activity is to be carried out on-site until the Construction Certificate has been issued, other than: a) Site investigation for the preparation of the construction, and / or b) Implementation of environmental protection measures, such as erosion control and the like that are required by this consent. c) Any demolition approved by this consent. 3.3 Appoint a Principal Certifying Authority for the building work: a) The Principal Certifying Authority (if not Council) is to notify Council of their appointment and notify the person having the benefit of the…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.