Central Coast Contamination Conditions
6 contamination conditions imposed by Central Coast across 5 development applications in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.
1. PARAMETERS OF THIS CONSENT 1.1. Implement the development substantially in accordance with the plans and supporting documents listed below as submitted by the applicant and to which is affixed a Council stamp "Development Consent" unless modified by any following condition. Architectural Plans by: Barker Ryan Stewart Drawing Description Issue Date CC180099 Plan of Subdivision T 28/2/2025 CC180099-07 Sheets: 001, 002, 011, 021, 031, 041, 051, 061, 101-106, 121, 131-136, 151, 511-516, 611-617, 621-627, 701, 702, 711, 712, 721, 722, 901-922 Concept Civil Engineering Design For Development Application F 14/4/2025 LDD001-LDD003, LDD401-LDD420, LDD 701, LDD 702 Landscaping Plans (Moir…
3. PRIOR TO COMMENCEMENT OF ANY WORKS 3.1 All conditions under this section must be met prior to the commencement of any works. (GL008) 3.2 No activity is to be carried out on-site until the Construction Certificate has been issued, other than: • Site investigation for the preparation of the construction, and / or • Implementation of environmental protection measures, such as erosion control and the like that are required by this consent • Demolition approved by this consent. 3.3 Appoint a Principal Certifying Authority for the building work: • The Principal Certifying Authority (if not Council) is to notify Council of their appointment and notify the person having the benefit of the…
5. PRIOR TO ISSUE OF ANY OCCUPATION CERTIFICATE 5.1 All conditions under this section must be met prior to the issue of any Occupation Certificate. (GL020) 5.2 Obtain an Environmental Protection Licence from the NSW Environmental Protection Authority for the activity. 5.3 Obtain the Section 307 Certificate of Compliance under the Water Management Act 2000 for water and sewer requirements for the development from Central Coast Council as the Water Supply Authority, prior to issue of the Occupation Certificate. 5.4 Construct any additional civil works, where required by Council, to ensure satisfactory transitions to existing site formations and pavements where designs contained in the Roads…
4.3. Stages 1 & 2 - Ensure a qualified arborist (AQF 5) is on-site to oversee the works in relation to tree protection measures during critical stages of construction. 4.4. Stages 1 & 2 - All care is to be taken to avoid damage to tree roots. Roots that can’t be avoided are to be cut (not ripped) with a sharp tool such as pruners or handsaw. Seek Arboricultural advice before severing roots greater than 75mm diameter. 4.5. Stages 1 & 2 - Implement all soil and water management control measures and undertake works in accordance with the approved Soil and Water Management Plan. Update the plan as required during all stages of the construction or in accordance with the ‘Blue Book’ (Managing…
3.8. Revegetate and stabilise all areas disturbed by construction activities with suitable plants native to the Central Coast. The Project Ecologist is to recommend suitable species based on adjoining native plant communities. Comply with the requirements of the Road Opening Permit and the Road Occupancy Licence issued by Council. 3.10. Undertake works in accordance with the approved Construction Environment Management Plan. Immediately notify Council of any new information which comes to light during remediation, demolition or construction works which has the potential to alter previous conclusions about site contamination and remediation. Implement all erosion and sediment control…
3.PRIOR TO COMMENCEMENT OF ANY WORKS 3.1. All conditions under this section must be met prior to the commencement of any works. 3.2 No activity is to be carried out on-site until the Construction Certificate has been issued, other than: a) Site investigation for the preparation of the construction, and / or b) Implementation of environmental protection measures, such as erosion control and the like that are required by this consent. c) Any demolition approved by this consent. 3.3 Appoint a Principal Certifying Authority for the building work: a) The Principal Certifying Authority (if not Council) is to notify Council of their appointment and notify the person having the benefit of the…
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Contamination conditions in other councils
Wollongong
94 conditions
Cumberland
65 conditions
Bayside
64 conditions
Hornsby
61 conditions
Lane Cove
53 conditions
City of Sydney
49 conditions
Newcastle
49 conditions
City of Parramatta
48 conditions
Randwick
41 conditions
City of Ryde
37 conditions
Inner West
36 conditions
Camden
34 conditions
Willoughby
34 conditions
Burwood
31 conditions
Canterbury-Bankstown
24 conditions
Canada Bay
24 conditions
Waverley
24 conditions
Campbelltown
23 conditions
Sutherland
21 conditions
Liverpool
19 conditions
Wollondilly
18 conditions
Blue Mountains
17 conditions
Hawkesbury
13 conditions
Strathfield
12 conditions
Georges River
11 conditions
Ku-ring-gai
11 conditions
Mosman
11 conditions
North Sydney
8 conditions
Fairfield
7 conditions
Lake Macquarie
6 conditions
Northern Beaches
5 conditions
Woollahra
5 conditions
Penrith
3 conditions
Hunters Hill
3 conditions