Mosman Contamination Conditions

11 contamination conditions imposed by Mosman across 1 development application in our dataset. Contamination conditions manage land affected by past industrial, commercial or agricultural use — site investigation, remediation action plans, validation reporting and the safe handling of asbestos and hazardous material.

Condition 25 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

25. Prior to the issue of a Construction Certificate, the Certifying Authority is to be Formatted: List Paragraph, Right: 0.3 cm, Line spacing: provided with plans demonstrating that all Services (Gas meter, water meter & fire Multiple 1.01 li, Numbered + Level: 1 + Numbering hydrant and sprinkler booster valves and the like) are enclosed in a manner that Style: 1, 2, 3, … + Start at: 1 + Alignment: Left + Aligned complements the building and in accordance with the requirements of EP1.3 & at: 0.1 cm + Indent at: 1 cm, Tab stops: 1 cm, Left EP1.4 of the BCA. (Reason: To ensure essential services are appropriately screened) Fire Safety 25.26. To enable the issuing of a fire safety schedule,…

Condition 57 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

57. To minimise disturbance to acid sulfate soils, the following is required: (a) a suitably qualified validation consultant be engaged to monitor works and validate the implementation of the Acid Sulfate Soils Management Plan during works. The ASSMP procedure is to be implemented in accordance with Section 4 Management Plan of the Acid Sulfate Soils Management Plan report dated 5 March 2025, prepared by JK Environments. (b) submission to the Accredited Certifier of the completed Acid Sulphate Soils Management Plan, prepared by a suitably qualified person, for any excavation of a depth of 1.5 metres or greater. Acoustic

Condition 23 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

23. Prior to the issue of any Construction Certificate, the Accredited Certifier and Council's Compliance Team shall be advised in writing of the appointment of a suitably qualified contaminated land consultant to undertake the required investigations and site validation. The suitably qualified consultant must be a Certified Environmental Practitioner under the Environment Institute of Australia and New Zealand (EIANZ) scheme or a Soil Scientist, Certified as a Professional Soil Scientist Contaminated Site Assessment and Management (CPSS CSAM), by the NSW EPA. Site Audit Statement

Condition 4 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

4. A Site Environmental Management Plan (SEMP) must be prepared for the site in accordance with Section 9 Site Management Plan for Remediation Works contained in Remediation Action Plan (RAP), dated 28 February 2025 Ref: E35551PTrpt6Rev1. The SEMP must be submitted to Council's Compliance Team and Accredited Certifier prior to any demolition works. PRESCRIBED CONDITIONS The following prescribed conditions apply in accordance with Division 2 of the Environmental Planning and Assessment Regulation 2021. Building Code of Australia

Condition 76 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

76. Prior to the issue of an Occupation Certificate, the Accredited Certifier and Council’s Environmental Health Officer shall be provided with a Site Audit Statement (Section A Site Audit Statement) issued under the Contaminated Land Management Act 1997, specifying that the site is suitable for the proposed mixed use development. Section A Site Audit Statement shall be accompanied by a site audit report in accordance with that Act. Acoustic Certification

Condition 75 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

75. A final fire safety certificate prepared in accordance with Part 11 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021 must be issued by or on behalf of the owner. Copies of both the final fire safety certificate and the fire safety schedule must be (1) supplied to Council, (2) forwarded to the Fire Commissioner and (3) prominently displayed in the building. Site Audit

Condition 56 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

56. To ensure that siting, height and view loss objectives are achieved, all wall locations, finished floor levels and ridge levels shall be in accordance with that approved under this consent. NB – The Principal Certifying Authority may require a compliance certificate from a registered surveyor prior to the pouring of a concrete floor or the fixing of roof cladding to verify compliance. Acid Sulfate Soils Management

Condition 24 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

24. Prior to the commencement of any works the appointed principal certifier shall be provided with a Site Audit Statement (Section B Site Audit Statement) issued under the Contaminated Land Management Act 1997, specifying that the site is suitable for its intended use. The Section B Site Audit Statement shall be accompanied by a site audit report in accordance with that Act. Services and Fire Hydrant Enclosure

Condition 22 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

22. Prior to the issue of any Construction Certificate, the Accredited Certifier and Council’s Compliance Team shall be advised in writing of the appointment of a site auditor, accredited in accordance with Part 4 of the Contaminated Land Management Act 1997. The site auditor is to undertake a ‘site audit’ as defined by the Contaminated Land Management Act 1997. Appointment of Contaminated Land Consultant

Condition 3 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

3. The temporary demountable buildings on 49B The Esplanade, Mosman shall be removed and the site made good to the condition of the Tennis Court at the date of this application, 6 months after obtaining an Occupation Certificate for the works that are the subject of this development application. Site Environmental Management Plan (SEMP)

Condition 21 8.2025.47.1 det. 02/10/2025 Queenwood School for Girls (Art & Design Campus Development)

21. Materials and finishes shall be complementary to the character and streetscape of the area. Highly reflective roofing materials shall not be used. Details of finished external surface materials, including colours and texture, must be submitted to the satisfaction of the Accredited Certifier. Appointment of Site Auditor

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.