Central Coast Construction Management Conditions

4 construction management conditions imposed by Central Coast across 3 development applications in our dataset. Construction management conditions govern how building work is carried out — construction management plans, approved work hours, site fencing and hoarding, dust and noise control, and protection of public roads and infrastructure.

DA/1380/2024 det. 22/08/2025

7.00 am and 5.00 pm on Monday to Saturday. The principal certifier must ensure building work, demolition or vegetation removal is not carried out on Sundays and public holidays, except where there is an emergency. Unless otherwise approved within a construction site management plan, construction vehicles, machinery, goods or materials must not be delivered to the site outside the approved hours of site works. Note: Any variation to the hours of work requires Council’s approval. 4.3. Stages 1 & 2 - Ensure a qualified arborist (AQF 5) is on-site to oversee the works in relation to tree protection measures during critical stages of construction. 4.4. Stages 1 & 2 - All care is to be taken to…

DA/320/2024 det. 12/12/2024

5.7. Create a plan of subdivision for lease purposes prior to issue of an Occupation Certificate. 5.8. Construct any additional civil works, where required by Council, to ensure satisfactory transitions to existing site formations and pavements where designs contained in the Roads Act Works Approval do not adequately address transition works. 5.9. Complete construction of the stormwater management system in accordance with the Stormwater Management Plan and Australian Standard AS 3500.3-Stormwater drainage systems. Certification of the construction by a suitably qualified consultant must be provided to the Principal Certifier. 5.10. Complete construction of all works within the road reserve…

DA/320/2024 det. 12/12/2024

5.5. Prior to issue of any Occupation Certificate, engage an Ecologist to undertake an inspection of all artificial hollows installed under this consent to determine condition, functionality and fauna usage (via an internal inspection). The Ecologist is to submit a letter to Council’s Ecologist for approval which contains results. All artificial hollows installed must be maintained or replaced where damaged or missing for a minimum of ten years following issue of the Occupation Certificate. 5.6. Create a plan of subdivision for lease purposes prior to issue of an Occupation Certificate. 5.7. Construct any additional civil works, where required by Council, to ensure satisfactory transitions…

DA/1629/2024 det. 18/09/2025

2.11. Prior to commencement of any works Jemena Lands Team is to be consulted so that any proposed construction activities can be managed with Jemena Engineering and Field staff. 2.12. Physically locate the Private Sewer Rising Mains from both the Old Wyong Dairy and the Wyong Christian Community School to ensure the proposed design does not conflict with this existing private infrastructure. 2.13. Prepare and obtain Council approval for a Construction Traffic and Pedestrian Management Plan (CTPMP) for all activities related to installation of the new sewer rising main and grout filling of the existing main. The plan must be prepared and implemented only by persons with SafeWork NSW…

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.