Camden Demolition Conditions
13 demolition conditions imposed by Camden across 8 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.
1. Four (4) replacement trees must be planted for everyone (1) tree approved for removal. The container size is to be a minimum of 75 litres and a minimum height of 1.5 metres. Any replacement planting is to be undertaken near the proposed basin within the riparian corridor and planting must be in accordance with APZ Requirements. Species that are broadly accepted are below: • Eucalyptus crebra • Eucalytpus tereticornis • Eucalyptus molucanna • Eucalyptus longifolia • Angophora floribunda • Melaleuca stypheloides • Melaleuca linariifolia Condition reason: To detail approved tree work and any replacement landscaping. OFFICIAL (4) Engineering specifications - The development must be designed…
2. Crown building work certified to comply with the Building Code of Australia under Part 6 of the Environmental Planning and Assessment Act 1979. Condition reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021. 2.2 - During Demolition Work (1) Priority (noxious) weeds management (during work) - While demolition work is being carried out, weed dispersion must be minimised and weed infestations must be managed under the Biosecurity Act 2015 and the Biosecurity Regulation 2017. Any priority (noxious) or environmentally invasive weed infestations that occur during works must be fully and continuously suppressed and destroyed by appropriate…
6. If the property was built prior to 1987, an asbestos survey must be carried out by a suitably qualified person. If asbestos is found, a SafeWork NSW licensed asbestos removalist must remove all asbestos in accordance with SafeWork NSW requirements and include notification to adjoining property occupiers of the asbestos removal. Condition reason: To ensure that demolition works are carried out to appropriate standards. (3) Site management plan (preparation) - Before any demolition work commences, a site management plan must be prepared by a suitably qualified person. The plan must demonstrate, to the satisfaction of Council, that the following site work matters will be managed to protect…
7. If the property was built prior to 1987, an asbestos survey must be carried out by a suitably qualified person. If asbestos is found, a SafeWork NSW licensed asbestos removalist must remove all asbestos in accordance with SafeWork NSW requirements and include notification to adjoining property occupiers of the asbestos removal. Condition reason: To ensure that demolition works are carried out to appropriate standards. (4) Site management plan (preparation) - Before any demolition work commences, a site management plan must be prepared by a suitably qualified person. The plan must demonstrate that the following site work matters will be managed to protect the amenity of the surrounding…
2. All hazardous components on the site have been identified. Condition reason: To ensure hazardous building materials are identified before any works commence. (3) Demolition work - Before any demolition work commences, the following requirements must be complied with:
11. Complaints recording and response. Condition reason: To ensure site management practices are established before any works commence. (4) Erection of signs - Before any demolition work commences, a sign must be erected in a prominent position on the site:
11. Complaints recording and response. Condition reason: To ensure site management practices are established before any works commence. (5) Erection of signs - Before any demolition work commences, a sign must be erected in a prominent position on the site:
1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.
1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.
1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.
1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.
1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.
1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Demolition conditions in other councils
Newcastle
115 conditions
Ku-ring-gai
81 conditions
Wollongong
78 conditions
Burwood
76 conditions
Cumberland
63 conditions
Sutherland
42 conditions
Willoughby
41 conditions
Bayside
39 conditions
Randwick
30 conditions
City of Ryde
26 conditions
Lane Cove
25 conditions
Inner West
24 conditions
Waverley
23 conditions
Canterbury-Bankstown
21 conditions
City of Parramatta
19 conditions
Campbelltown
18 conditions
Hornsby
18 conditions
City of Sydney
16 conditions
Georges River
16 conditions
Strathfield
16 conditions
Blue Mountains
10 conditions
Hawkesbury
9 conditions
Wollondilly
9 conditions
Liverpool
8 conditions
Fairfield
8 conditions
Canada Bay
7 conditions
Mosman
6 conditions
Lake Macquarie
5 conditions
Woollahra
4 conditions