9,484 conditions across 37 councils · 295 audit errors found across 33 councils · Newcastle, Central Coast, Wollongong added · CB & Lake Mac document checkers live · 37-council directory with LEP links · LEP clause reference + key timeframes ·

Camden Demolition Conditions

13 demolition conditions imposed by Camden across 8 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

Condition 1 DA/2025/390/1 det. 11/12/2025 Macarthur Anglican School

1. Four (4) replacement trees must be planted for everyone (1) tree approved for removal. The container size is to be a minimum of 75 litres and a minimum height of 1.5 metres. Any replacement planting is to be undertaken near the proposed basin within the riparian corridor and planting must be in accordance with APZ Requirements. Species that are broadly accepted are below: • Eucalyptus crebra • Eucalytpus tereticornis • Eucalyptus molucanna • Eucalyptus longifolia • Angophora floribunda • Melaleuca stypheloides • Melaleuca linariifolia Condition reason: To detail approved tree work and any replacement landscaping. OFFICIAL (4) Engineering specifications - The development must be designed…

Condition 2 DA/2025/167/1 det. 09/09/2025 Animal Boarding and Training Establishment and Plant Nursery

2. Crown building work certified to comply with the Building Code of Australia under Part 6 of the Environmental Planning and Assessment Act 1979. Condition reason: Prescribed condition under section 70 of the Environmental Planning and Assessment Regulation 2021. 2.2 - During Demolition Work (1) Priority (noxious) weeds management (during work) - While demolition work is being carried out, weed dispersion must be minimised and weed infestations must be managed under the Biosecurity Act 2015 and the Biosecurity Regulation 2017. Any priority (noxious) or environmentally invasive weed infestations that occur during works must be fully and continuously suppressed and destroyed by appropriate…

Condition 6 DA/2025/167/1 det. 09/09/2025 Animal Boarding and Training Establishment and Plant Nursery

6. If the property was built prior to 1987, an asbestos survey must be carried out by a suitably qualified person. If asbestos is found, a SafeWork NSW licensed asbestos removalist must remove all asbestos in accordance with SafeWork NSW requirements and include notification to adjoining property occupiers of the asbestos removal. Condition reason: To ensure that demolition works are carried out to appropriate standards. (3) Site management plan (preparation) - Before any demolition work commences, a site management plan must be prepared by a suitably qualified person. The plan must demonstrate, to the satisfaction of Council, that the following site work matters will be managed to protect…

Condition 7 DA/2025/390/1 det. 11/12/2025 Macarthur Anglican School

7. If the property was built prior to 1987, an asbestos survey must be carried out by a suitably qualified person. If asbestos is found, a SafeWork NSW licensed asbestos removalist must remove all asbestos in accordance with SafeWork NSW requirements and include notification to adjoining property occupiers of the asbestos removal. Condition reason: To ensure that demolition works are carried out to appropriate standards. (4) Site management plan (preparation) - Before any demolition work commences, a site management plan must be prepared by a suitably qualified person. The plan must demonstrate that the following site work matters will be managed to protect the amenity of the surrounding…

Condition 2 DA/2025/390/1 det. 11/12/2025 Macarthur Anglican School

2. All hazardous components on the site have been identified. Condition reason: To ensure hazardous building materials are identified before any works commence. (3) Demolition work - Before any demolition work commences, the following requirements must be complied with:

Condition 11 DA/2025/167/1 det. 09/09/2025 Animal Boarding and Training Establishment and Plant Nursery

11. Complaints recording and response. Condition reason: To ensure site management practices are established before any works commence. (4) Erection of signs - Before any demolition work commences, a sign must be erected in a prominent position on the site:

Condition 11 DA/2025/390/1 det. 11/12/2025 Macarthur Anglican School

11. Complaints recording and response. Condition reason: To ensure site management practices are established before any works commence. (5) Erection of signs - Before any demolition work commences, a sign must be erected in a prominent position on the site:

Condition 1 DA/2025/203/1 det. 09/09/2025 Stage 5 - Leppington Anglican College

1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.

Condition 1 DA/2025/284/1 det. 07/11/2025 Construction of a six (6) storey hotel development

1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.

Condition 1 DA/2025/309/1 det. 25/09/2025 Child Care Centre

1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.

Condition 1 DA/2025/414/1 det. 11/12/2025 Seven storey RFB

1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.

Condition 1 DA/2025/432/1 det. 11/12/2025 Construction of a six-storey high-grade commercial building

1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.

Condition 1 da/2025/17/1 det. 27/06/2025 Childcare Centre

1. Building work, subdivision work or demolition work carried out inside an existing building, if the work does not affect the external walls of the building.

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.