Camden Parking Conditions

14 parking conditions imposed by Camden across 7 development applications in our dataset. Parking conditions specify the number, layout and management of car, motorcycle, bicycle and accessible parking spaces, loading bays, and how parking is allocated and signposted.

Condition 2 DA/2025/390/1 det. 11/12/2025 Macarthur Anglican School

2. The basins will function in accordance with the design intent approved by the construction certificate. Condition reason: To ensure that water management basins will comply with the construction certificate. (8) Landscaping works completion - Before the issue of an occupation certificate, all of the landscaping works approved by this development consent and the construction certificate must be completed to the satisfaction of the principal certifier. This must include the provision of certification from the supplier of all trees certifying that the trees comply with AS 2303 - Tree Stock for Landscape use. Condition reason: To ensure that all approved landscaping works have been completed…

Condition 2 da/2025/17/1 det. 27/06/2025 Childcare Centre

2. No services or accessways encroach over the proposed boundaries other than those provided for by easements as created by the final plan of subdivision. Condition reason: To ensure that infrastructure is located within an easement. 7.1 - Occupation and Ongoing Use (1) On-site detention facility plan of management (ongoing) - During occupation and ongoing use of the development, the on-site detention facility plan of management plan required by this development must be complied with. Condition reason: To provide a management regime for on-site detention facilities. (2) Priority (noxious) weeds management (ongoing) - During occupation and ongoing use of the development, weed dispersion must…

Condition 3 DA/2025/414/1 det. 11/12/2025 Seven storey RFB

3. Compliant swept paths are to be produced demonstrating a B99 vehicle can manoeuvre through all driveways, ramps and circulation roadways in the carpark. Condition reason: To ensure that required information is provided to the certifier. (19) Drainage easements registration – Before the issue of a construction certificate, evidence must be provided and demonstrate, to the certifier’s satisfaction, that drainage easements in accordance with Council’s engineering specifications have been registered with NSW Land Registry Services over downstream properties that will accommodate drainage from the development (where the drainage will not be within a natural watercourse). Condition reason: To…

Condition 1 DA/2025/309/1 det. 25/09/2025 Child Care Centre

1. No wastewater, chemicals or other pollutant substances may be discharged to Council’s stormwater system or other waterways. Condition reason: To ensure no pollutants are discharged to stormwater systems or waterways. (21) Waste oil and by-products disposal - During occupation and ongoing use of the development, all waste oil, grease and associated by-products must be transferred to a waste or recycling facility by a liquid waste contractor. All waste disposals must be in accordance with the NSW Environment Protection Authority’s waste tracking requirements with documentation kept for 4 years. The documentation must be produced to Council upon request. Condition reason: To ensure waste…

Condition 6 DA/2025/390/1 det. 11/12/2025 Macarthur Anglican School

6. AS 4674 - Design, Construction and Fit-Out of Food Premises. Condition reason: To ensure that food premises and/or storage areas are designed to comply with statutory requirements and industry standards. (6) Sydney Water trade waste requirements - Before the issue of a construction certificate, information must be obtained from Sydney Water and a suitably qualified person and demonstrate, to the certifier’s satisfaction, any Sydney Water trade waste requirements and how the development will comply with them. Condition reason: To ensure that provisions have been made for managing trade waste. (7) Outdoor lighting provision - Before the issue of a construction certificate, information must…

DA/2025/243/1 det. 20/11/2025

Ultimately, the Panel agreed with the Council that the DA cannot be approved in its present form because: (a) the present orientation of the lots would lead to a poor outcome to Byron Road, (b) The design of some dwellings leaves the private open space accessible through one bedroom only – an issue exacerbated particularly for some of the dwellings which do not have a side path. (c) The presently proposed parking arrangements would give the internal road system the presentation of a carpark, with poor accessibility for the dwellings. Given that there is an appeal pending and the Court processes are available to encourage and facilitate compromise and settlement of the DA, with a…

Condition 9 DA/2025/414/1 det. 11/12/2025 Seven storey RFB

9. All standard car parking spaces must be designed in accordance with the AS2890. Amended plans demonstrating compliance with the above must be prepared and submitted to the certifier for approval. Condition reason: To ensure basement car parking, bicycle spaces and storage cages are appropriately allocated and achieve compliance with the relevant standards. (2) Public infrastructure alterations - Before the issue of a construction certificate, any required alterations to public infrastructure (including ramps, footpaths, kerb and gutter, light poles, kerb inlets, service provider pits, street trees or any other public infrastructure) must be approved by the roads authority under the Roads…

Condition 6 DA/2025/167/1 det. 09/09/2025 Animal Boarding and Training Establishment and Plant Nursery

6. The Staff Parking Aisle is to be extended beyond the last parking space #11 as per requirements for blind aisles under AS2890. Page 8 Condition reason: To require minor amendments to the plans endorsed by the consent authority following assessment of the development. (2) Fibre-ready facilities and telecommunications infrastructure - Before the issue of a construction certificate, written evidence from the carrier must be obtained that demonstrates, to the certifier’s satisfaction, that arrangements have been made for:

Condition 7 DA/2025/414/1 det. 11/12/2025 Seven storey RFB

7. Where storage cages are located behind a single parking space, the storage cage must also be allocated to the same unit who has been allocated the adjoining parking space.

Condition 1 DA/2025/414/1 det. 11/12/2025 Seven storey RFB

1. All car parking spaces within the basement levels must be allocated to an individual unit or as visitor parking. The relevant plans must be marked accordingly.

Condition 3 DA/2025/432/1 det. 11/12/2025 Construction of a six-storey high-grade commercial building

3. Compliant swept paths are to be produced demonstrating that a B99 vehicle can manoeuvre through all driveways, ramps and circulation roadways in the carpark.

Condition 2 DA/2025/432/1 det. 11/12/2025 Construction of a six-storey high-grade commercial building

2. The car park shall be designed to be compliant with relevant parts of AS2890.

Condition 2 DA/2025/414/1 det. 11/12/2025 Seven storey RFB

2. Car park is to be designed to be compliant with relevant parts of AS2890.

Condition 4 DA/2025/414/1 det. 11/12/2025 Seven storey RFB

4. Adaptable units must be allocated an accessible parking space (minimum).

Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.