Wollongong Demolition Conditions

78 demolition conditions imposed by Wollongong across 6 development applications in our dataset. Demolition conditions set requirements for safely removing existing structures — demolition work plans, asbestos removal and disposal, waste classification, hoarding, and notification of neighbours and authorities.

DA-2023/962 det. 22/11/2024

Prior to commencement of work, the person having the benefit of the Development Consent and a Construction Certificate must: • appoint a Principal Certifier and notify Council in writing of the appointment irrespective of whether Council or a Registered Certifier is appointed; and • notify Council in writing of their intention to commence work (at least two [2] days' notice is required). The Principal Certifier must determine when inspections and compliance certificates are required. Reason: To satisfy the requirements of the legislation. • Demolition Works The demolition of the existing structures shall be carried out in accordance with Australian Standard AS 2601:2001: The Demolition of…

Condition 11 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

11. Demolition and Construction Noise and Vibration Management Before the issue of a Construction Certificate or the commencement of any works, a noise and vibration assessment to identify all sensitive receivers where the construction noise and vibration levels may exceed the NSW EPA Interim Construction Noise Guidelines (July 2009) (or as superseded) construction noise goals for that receiver must be undertaken. Parameters of the assessment are to consider: a. Levels recommended by a registered Geotechnical/Structural Engineer with regards to structural damage buildings; b. German Standard DIN 4150 Part 3 Structural Vibration in Buildings. Effects on Structures; and c. For human exposure…

Condition 11 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

11. Demolition and Construction Noise and Vibration Management Before the issue of a Construction Certificate or the commencement of any works, a noise and vibration assessment to identify all sensitive receivers where the construction noise and vibration levels may exceed the NSW EPA Interim Construction Noise Guidelines (July 2009) (or as superseded) construction noise goals for that receiver must be undertaken. Parameters of the assessment are to consider: a. Levels recommended by a registered Geotechnical/Structural Engineer with regards to structural damage buildings; b. German Standard DIN 4150 Part 3 Structural Vibration in Buildings. Effects on Structures; and c. For human exposure…

Condition 31 DA-2023/767 det. 17/12/2024 The Globe Project

31. Demolition and Construction Noise and Vibration Management Before to the release of the Construction Certificate, a noise and vibration assessment to identify all sensitive receivers where the construction noise and vibration levels may exceed the NSW EPA Interim Construction Noise Guidelines (July 2009) (or as superseded) construction noise goals for that receiver must be undertaken. Parameters of the assessment are to consider: a. Levels recommended by a registered Geotechnical/Structural Engineer with regards to structural damage buildings; b. German Standard DIN 4150 Part 3 Structural Vibration in Buildings. Effects on Structures; and c. For human exposure to vibration, the…

Condition 30 DA-2023/767 det. 17/12/2024 The Globe Project

30. Demolition and Construction Noise and Vibration Management Before to the release of the Construction Certificate, a noise and vibration assessment to identify all sensitive receivers where the construction noise and vibration levels may exceed the NSW EPA Interim Construction Noise Guidelines (July 2009) (or as superseded) construction noise goals for that receiver must be undertaken. Parameters of the assessment are to consider: a. Levels recommended by a registered Geotechnical/Structural Engineer with regards to structural damage buildings; b. German Standard DIN 4150 Part 3 Structural Vibration in Buildings. Effects on Structures; and c. For human exposure to vibration, the…

Condition 82 DA-2023/785 det. 10/05/2024 Group Home

82. Hours of Work The Principal Certifier must ensure that building work, demolition or vegetation removal is only carried out between: • 7:00am to 5:00pm on Monday to Saturday The Principal Certifier must ensure building work, demolition or vegetation removal is not carried out on Sundays and public holidays, except where there is an emergency. Unless otherwise approved within a construction site management plan, construction vehicles, machinery, goods or materials must not be delivered to the site outside the approved hours of site works. Any variation to the hours of work requires Council's approval. Any request to vary the approved hours shall be submitted to the Council in writing…

Condition 70 DA-2023/895 det. 16/06/2025 Former Bulli Hospital

70. Hours of Work The Principal Certifier must ensure that building work, demolition or vegetation removal is only carried out between: • 7:00am to 5:00pm on Monday to Saturday The Principal Certifier must ensure building work, demolition or vegetation removal is not carried out on Sundays and public holidays, except where there is an emergency. Unless otherwise approved within a construction site management plan, construction vehicles, machinery, goods or materials must not be delivered to the site outside the approved hours of site works. Any variation to the hours of work requires Council's approval. Any request to vary the approved hours shall be submitted to the Council in writing…

Condition 34 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

34. Demolition and Construction Noise and Vibration Management Before the release of the Construction Certificate, a noise and vibration assessment to identify all sensitive receivers where the construction noise and vibration levels may exceed the NSW EPA Interim Construction Noise Guidelines (July 2009) (or as superseded) construction noise goals for that receiver must be undertaken. Parameters of the assessment are to consider: a. For human exposure to vibration, the evaluation criteria presented in British Standard BS 6472 - Guide to Evaluation of Human Exposure to Vibration in Buildings (1Hz to 80Hz) for low probability of adverse comment. The findings, recommendations and management…

Condition 84 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

84. Demolition and Construction Noise and Vibration Management The findings, recommendations and management controls from the Construction Noise and Vibration Management Plan provided to the Principal Certifier must be adhered to in full for the duration of the works subject of the plan. Where the duration or excavation methods of the demolition and excavation vary from those prescribed in the Demolition Construction Noise and Vibration Management Plan, Council may require an updated management plan be prepared to incorporate the changes in excavation methods and/or duration. Once reviewed by Council, the updated Management Plan is to be adhered to at all times. Where all such control…

Condition 128 DA-2023/767 det. 17/12/2024 The Globe Project

128. Construction Noise and Vibration Management The findings, recommendations and management controls from the Construction Noise and Vibration Management Plan provided to the principal certifier must be adhered to in full for the duration of the works subject of the plan. Where the duration or excavation methods of the demolition and excavation vary from those prescribed in the Demolition Construction Noise and Vibration Management Plan, Council may require an updated management plan be prepared to incorporate the changes in excavation methods and/or duration. Once reviewed by Council, the updated Management Plan is to be adhered to at all times. Where all such control measures have been…

Condition 125 DA-2023/767 det. 17/12/2024 The Globe Project

125. Construction Noise and Vibration Management The findings, recommendations and management controls from the Construction Noise and Vibration Management Plan provided to the principal certifier must be adhered to in full for the duration of the works subject of the plan. Where the duration or excavation methods of the demolition and excavation vary from those prescribed in the Demolition Construction Noise and Vibration Management Plan, Council may require an updated management plan be prepared to incorporate the changes in excavation methods and/or duration. Once reviewed by Council, the updated Management Plan is to be adhered to at all times. Where all such control measures have been…

Condition 57 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

57. Construction Noise and Vibration Management The findings, recommendations and management controls from the Construction Noise and Vibration Management Plan provided to the principal certifier must be adhered to in full for the duration of the works subject of the plan. Where the duration or excavation methods of the demolition and excavation vary from those prescribed in the Demolition Construction Noise and Vibration Management Plan, Council may require an updated management plan be prepared to incorporate the changes in excavation methods and/or duration. Once reviewed by Council, the updated Management Plan is to be adhered to at all times. Where all such control measures have been…

Condition 58 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

58. Construction Noise and Vibration Management The findings, recommendations and management controls from the Construction Noise and Vibration Management Plan provided to the principal certifier must be adhered to in full for the duration of the works subject of the plan. Where the duration or excavation methods of the demolition and excavation vary from those prescribed in the Demolition Construction Noise and Vibration Management Plan, Council may require an updated management plan be prepared to incorporate the changes in excavation methods and/or duration. Once reviewed by Council, the updated Management Plan is to be adhered to at all times. Where all such control measures have been…

Condition 103 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

103. Demolition and Construction Noise and Vibration Management The findings, recommendations and management controls from the Environmental Acoustical Assessment prepared by Harwood Acoustics (July 2023) must be adhered to in full for the duration of the works subject of the plan. Where the duration or excavation methods of the demolition and excavation vary from those prescribed in the Environmental Acoustical Assessment, Council may require an updated management plan be prepared to incorporate the changes in demolition/excavation methods and/or duration. Once reviewed by Council, the updated Environmental Acoustical Assessment is to be adhered to at all times. Where all such control…

Condition 105 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

105. Demolition and Construction Noise and Vibration Management The findings, recommendations and management controls from the Environmental Acoustical Assessment prepared by Harwood Acoustics (July 2023) must be adhered to in full for the duration of the works subject of the plan. Where the duration or excavation methods of the demolition and excavation vary from those prescribed in the Environmental Acoustical Assessment, Council may require an updated management plan be prepared to incorporate the changes in demolition/excavation methods and/or duration. Once reviewed by Council, the updated Environmental Acoustical Assessment is to be adhered to at all times. Where all such control…

Condition 79 DA-2023/785 det. 10/05/2024 Group Home

79. Waste management While demolition or building work is being carried out, the principal certifier must be satisfied all waste management is undertaken in accordance with the waste management plan. Upon disposal of waste, the applicant is to compile and provide records of the disposal to the principal certifier, detailing the following: • The contract details of the person(s) who removed the waste; • The waste carrier vehicle registration; • The date and time of waste collection; • A description of the waste (type of waste and estimated quantity) and whether the waste is expected to be reused, recycled or go to landfill; • The address of the disposal location(s) where the waste was taken;…

Condition 58 DA-2023/785 det. 10/05/2024 Group Home

58. Demolition Works The demolition of the existing structures shall be carried out in accordance with Australian Standard AS 2601:2001: The Demolition of Structures or any other subsequent relevant Australian Standard and the requirements of SafeWork NSW. No demolition materials shall be burnt or buried on-site. The person responsible for the demolition works shall ensure that all vehicles leaving the site carrying demolition materials have their loads covered and do not track soil or waste materials onto the road. Any unforeseen hazardous and/or intractable wastes shall be disposed of to the satisfaction of the Principal Certifier. In the event that the demolition works may involve the…

Condition 55 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

55. Demolition Works The demolition works shall be carried out in accordance with Australian Standard AS 2601:2001: The Demolition of Structures or any other subsequent relevant Australian Standard and the requirements of SafeWork NSW. No demolition materials shall be burnt or buried on-site. The person responsible for the demolition works shall ensure that all vehicles leaving the site carrying demolition materials have their loads covered and do not track soil or waste materials onto the road. Any unforeseen hazardous and/or intractable wastes shall be disposed of to the satisfaction of the Principal Certifier. In the event that the demolition works may involve the obstruction of any road…

Condition 52 DA-2023/895 det. 16/06/2025 Former Bulli Hospital

52. Demolition Works Demolition shall be carried out in accordance with Australian Standard AS 2601:2001: The Demolition of Structures or any other subsequent relevant Australian Standard and the requirements of SafeWork NSW. No demolition materials shall be burnt or buried on-site. The person responsible for the demolition works shall ensure that all vehicles leaving the site carrying demolition materials have their loads covered and do not track soil or waste materials onto the road. Any unforeseen hazardous and/or intractable wastes shall be disposed of to the satisfaction of the Principal Certifier. In the event that the demolition works may involve the obstruction of any road…

Condition 103 DA-2023/767 det. 17/12/2024 The Globe Project

103. Signs On Site A sign must be erected in a prominent position on any site on which building work or demolition work is being carried out: a. showing the name, address and telephone number of the Principal Certifier for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the worksite is prohibited. Any such sign is to be maintained while the building work or demolition work is being carried out but must be removed when the work has been completed. Note: This does not apply in relation to building work or demolition work…

Condition 102 DA-2023/767 det. 17/12/2024 The Globe Project

102. Signs On Site A sign must be erected in a prominent position on any site on which building work or demolition work is being carried out: a. showing the name, address and telephone number of the Principal Certifier for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the worksite is prohibited. Any such sign is to be maintained while the building work or demolition work is being carried out but must be removed when the work has been completed. Note: This does not apply in relation to building work or demolition work…

Condition 54 DA-2023/785 det. 10/05/2024 Group Home

54. Signs On Site A sign must be erected in a prominent position on any site on which building work or demolition work is being carried out: a. showing the name, address and telephone number of the Principal Certifier for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the worksite is prohibited. Any such sign is to be maintained while the building work or demolition work is being carried out but must be removed when the work has been completed. Note: This does not apply in relation to building work or demolition work that…

Condition 60 DA-2023/895 det. 16/06/2025 Former Bulli Hospital

60. Signs On Site A sign must be erected in a prominent position on any site on which building work or demolition work is being carried out: a. showing the name, address and telephone number of the Principal Certifier for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the worksite is prohibited. Any such sign is to be maintained while the building work or demolition work is being carried out but must be removed when the work has been completed. Note: This does not apply in relation to building work or demolition work that…

Condition 29 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

29. Signs On Site A sign must be erected in a prominent position on any site on which building work or demolition work is being carried out: a. showing the name, address and telephone number of the Principal Certifier for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the worksite is prohibited. Any such sign is to be maintained while the building work or demolition work is being carried out but must be removed when the work has been completed. Note: This does not apply in relation to building work or demolition work that…

Condition 30 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

30. Signs On Site A sign must be erected in a prominent position on any site on which building work or demolition work is being carried out: a. showing the name, address and telephone number of the Principal Certifier for the work, and b. showing the name of the principal contractor (if any) for any building work and a telephone number on which that person may be contacted outside working hours, and c. stating that unauthorised entry to the worksite is prohibited. Any such sign is to be maintained while the building work or demolition work is being carried out but must be removed when the work has been completed. Note: This does not apply in relation to building work or demolition work that…

Condition 59 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

59. Notification to Surrounding Property Owners/Occupants Prior to Commencement of Demolition Works At least five (5) days' notice must be given in writing to any residence or business within 100 metres of the premises to which this consent pertains of the impending demolition works. The written notice must include at least the following information: a. a summary of the work plan and method for the demolition and a timetable for completion of works, including hours of operation, transport routes etc; b. details of the primary contractor and/or company conducting the demolition works; c. the name and telephone number for a person supervising the works to which residents can direct questions,…

Condition 48 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

48. Notification to Surrounding Property Owners/Occupants Prior to Commencement of Demolition Works At least five (5) days' notice must be given in writing to any residence or business within 100 metres of the premises to which this consent pertains of the impending demolition works. The written notice must include at least the following information: a. a summary of the work plan and method for the demolition and a timetable for completion of works, including hours of operation, transport routes etc; b. details of the primary contractor and/or company conducting the demolition works; c. the name and telephone number for a person supervising the works to which residents can direct questions,…

Condition 49 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

49. Notification to Surrounding Property Owners/Occupants Prior to Commencement of Demolition Works At least five (5) days' notice must be given in writing to any residence or business within 100 metres of the premises to which this consent pertains of the impending demolition works. The written notice must include at least the following information: a. a summary of the work plan and method for the demolition and a timetable for completion of works, including hours of operation, transport routes etc; b. details of the primary contractor and/or company conducting the demolition works; c. the name and telephone number for a person supervising the works to which residents can direct questions,…

Condition 119 DA-2023/767 det. 17/12/2024 The Globe Project

119. Protection of Public Places If the work involved in the erection or demolition of a building involves the enclosure of a public place or is likely to cause pedestrian/vehicular traffic in a public place to be obstructed or rendered inconvenient: a. A hoarding or fence must be erected between the work site and the public place; b. An awning is to be erected, sufficient to prevent any substance from, or in connection with, the work falling into the public place; c. The work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in a public place; d. Safe pedestrian access must be maintained at all times; e. Any such hoarding, fence or awning is to be…

Condition 117 DA-2023/767 det. 17/12/2024 The Globe Project

117. Protection of Public Places If the work involved in the erection or demolition of a building involves the enclosure of a public place or is likely to cause pedestrian/vehicular traffic in a public place to be obstructed or rendered inconvenient: a. A hoarding or fence must be erected between the work site and the public place; b. An awning is to be erected, sufficient to prevent any substance from, or in connection with, the work falling into the public place; c. The work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in a public place; d. Safe pedestrian access must be maintained at all times; e. Any such hoarding, fence or awning is to be…

Condition 37 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

37. Protection of Public Places If the work involved in the erection or demolition of a building involves the enclosure of a public place or is likely to cause pedestrian/vehicular traffic in a public place to be obstructed or rendered inconvenient: a. A hoarding or fence must be erected between the work site and the public place; b. An awning is to be erected, sufficient to prevent any substance from, or in connection with, the work falling into the public place; c. The work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in a public place; d. Safe pedestrian access must be maintained at all times; e. Any such hoarding, fence or awning is to be…

Condition 38 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

38. Protection of Public Places If the work involved in the erection or demolition of a building involves the enclosure of a public place or is likely to cause pedestrian/vehicular traffic in a public place to be obstructed or rendered inconvenient: a. A hoarding or fence must be erected between the work site and the public place; b. An awning is to be erected, sufficient to prevent any substance from, or in connection with, the work falling into the public place; c. The work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in a public place; d. Safe pedestrian access must be maintained at all times; e. Any such hoarding, fence or awning is to be…

Condition 147 DA-2023/767 det. 17/12/2024 The Globe Project

147. Excavation Protection and Notification If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of a building on adjoining allotment of land, the person causing the excavation to be made: a. Must preserve and protect the adjoining building from damage; and b. if necessary, must underpin and support the building in an approved manner; and c. must, at least seven (7) days before excavation below the level of the base of the footings of a building on an adjoining allotment of land, give notice of intention to do so to the owner of the adjoining allotment of land and furnish particulars of the excavation. Reason: To…

Condition 143 DA-2023/767 det. 17/12/2024 The Globe Project

143. Excavation Protection and Notification If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of a building on adjoining allotment of land, the person causing the excavation to be made: a. Must preserve and protect the adjoining building from damage; and b. if necessary, must underpin and support the building in an approved manner; and c. must, at least seven (7) days before excavation below the level of the base of the footings of a building on an adjoining allotment of land, give notice of intention to do so to the owner of the adjoining allotment of land and furnish particulars of the excavation. Reason: To…

Condition 88 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

88. Excavation Protection and Notification If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of a building on adjoining allotment of land, the person causing the excavation to be made: a. Must preserve and protect the adjoining building from damage; and b. if necessary, must underpin and support the building in an approved manner; and c. must, at least seven (7) days before excavation below the level of the base of the footings of a building on an adjoining allotment of land, give notice of intention to do so to the owner of the adjoining allotment of land and furnish particulars of the excavation. Reason: To ensure…

Condition 90 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

90. Excavation Protection and Notification If an excavation associated with the erection or demolition of a building extends below the level of the base of the footings of a building on adjoining allotment of land, the person causing the excavation to be made: a. Must preserve and protect the adjoining building from damage; and b. if necessary, must underpin and support the building in an approved manner; and c. must, at least seven (7) days before excavation below the level of the base of the footings of a building on an adjoining allotment of land, give notice of intention to do so to the owner of the adjoining allotment of land and furnish particulars of the excavation. Reason: To ensure…

Condition 69 DA-2023/895 det. 16/06/2025 Former Bulli Hospital

69. Temporary Toilet/Closet Facilities Toilet facilities are to be provided at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be: a. a standard flushing toilet, and b. connected to either: a. the Sydney Water Corporation Ltd sewerage system or b. an accredited sewage management facility or c. an approved chemical closet. The toilet facilities shall be provided on-site, prior to the commencement of any works. Reason: To satisfy the requirements of the legislation. DURING BUILDING WORK Conditions

Condition 104 DA-2023/767 det. 17/12/2024 The Globe Project

104. Temporary Toilet/Closet Facilities Toilet facilities are to be provided at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be: a. a standard flushing toilet, and b. connected to either: i. the Sydney Water Corporation Ltd sewerage system or ii. an accredited sewage management facility or iii. an approved chemical closet. The toilet facilities shall be provided on-site, prior to the commencement of any works. Reason: To satisfy the requirements of the legislation.

Condition 103 DA-2023/767 det. 17/12/2024 The Globe Project

103. Temporary Toilet/Closet Facilities Toilet facilities are to be provided at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be: a. a standard flushing toilet, and b. connected to either: i. the Sydney Water Corporation Ltd sewerage system or ii. an accredited sewage management facility or iii. an approved chemical closet. The toilet facilities shall be provided on-site, prior to the commencement of any works. Reason: To satisfy the requirements of the legislation.

Condition 55 DA-2023/785 det. 10/05/2024 Group Home

55. Temporary Toilet/Closet Facilities Toilet facilities are to be provided at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be: a. a standard flushing toilet, and b. connected to either: i. the Sydney Water Corporation Ltd sewerage system or ii. an accredited sewage management facility or iii. an approved chemical closet. The toilet facilities shall be provided on-site, prior to the commencement of any works. Reason: To satisfy the requirements of the legislation.

Condition 30 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

30. Temporary Toilet/Closet Facilities Toilet facilities are to be provided at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be: a. a standard flushing toilet, and b. connected to either: i. the Sydney Water Corporation Ltd sewerage system or ii. an accredited sewage management facility or iii. an approved chemical closet. The toilet facilities shall be provided on-site, prior to the commencement of any works. Reason: To satisfy the requirements of the legislation.

Condition 31 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

31. Temporary Toilet/Closet Facilities Toilet facilities are to be provided at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be: a. a standard flushing toilet, and b. connected to either: i. the Sydney Water Corporation Ltd sewerage system or ii. an accredited sewage management facility or iii. an approved chemical closet. The toilet facilities shall be provided on-site, prior to the commencement of any works. Reason: To satisfy the requirements of the legislation.

Condition 91 DA-2023/785 det. 10/05/2024 Group Home

91. Asbestos Waste Collection, Transportation and Disposal Asbestos waste must be prepared, contained, transported and disposed of in accordance with SafeWork NSW and NSW Environment Protection Authority requirements. Asbestos waste must only be disposed of at a landfill site that can lawfully receive this this type of waste. A receipt must be retained and submitted to the Principal Certifier, and a copy submitted to Council (in the event that Council is not the Principal Certifier), prior to commencement of the construction works. Reason: To satisfy the requirements of the legislation. Before the Issue of an Occupation Certificate

Condition 86 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

86. Asbestos Waste Collection, Transportation and Disposal 26 DA-2024/502 Asbestos waste must be prepared, contained, transported and disposed of in accordance with SafeWork NSW and NSW Environment Protection Authority requirements. Asbestos waste must only be disposed of at a landfill site that can lawfully receive this this type of waste. A receipt must be retained and submitted to the Principal Certifier, and a copy submitted to Council (in the event that Council is not the Principal Certifier), prior to commencement of the construction works. Reason: To satisfy the requirements of the legislation.

Condition 118 DA-2023/767 det. 17/12/2024 The Globe Project

118. Hoardings (within any Public Road Reserve) The site must be enclosed with a suitable hoarding (type A or B) or security fence of a type in accordance with the Works and Services Division Design Standard, and must satisfy the requirements of the Occupational Health and Safety Act, the Occupational Health and Safety Regulations and Australian Standard AS 2601. This application must be submitted to Council’s Works and Services Division, and a permit obtained, before the erection of any such hoarding or fence. Reason: To satisfy the requirements of the legislation and Australian Standards.

Condition 116 DA-2023/767 det. 17/12/2024 The Globe Project

116. Hoardings (within any Public Road Reserve) The site must be enclosed with a suitable hoarding (type A or B) or security fence of a type in accordance with the Works and Services Division Design Standard, and must satisfy the requirements of the Occupational Health and Safety Act, the Occupational Health and Safety Regulations and Australian Standard AS 2601. This application must be submitted to Council’s Works and Services Division, and a permit obtained, before the erection of any such hoarding or fence. Reason: To satisfy the requirements of the legislation and Australian Standards.

Condition 36 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

36. Hoardings (within any Public Road Reserve) The site must be enclosed with a suitable hoarding (type A or B) or security fence of a type in accordance with the Works and Services Division Design Standard, and must satisfy the requirements of the Occupational Health and Safety Act, the Occupational Health and Safety Regulations and Australian Standard AS 2601. This application must be submitted to Council’s Works and Services Division, and a permit obtained, before the erection of any such hoarding or fence. Reason: To satisfy the requirements of the legislation and Australian Standards.

Condition 37 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

37. Hoardings (within any Public Road Reserve) The site must be enclosed with a suitable hoarding (type A or B) or security fence of a type in accordance with the Works and Services Division Design Standard, and must satisfy the requirements of the Occupational Health and Safety Act, the Occupational Health and Safety Regulations and Australian Standard AS 2601. This application must be submitted to Council’s Works and Services Division, and a permit obtained, before the erection of any such hoarding or fence. Reason: To satisfy the requirements of the legislation and Australian Standards.

Condition 103 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

103. Asbestos Waste Collection, Transportation and Disposal Asbestos waste must be prepared, contained, transported and disposed of in accordance with SafeWork NSW and NSW Environment Protection Authority requirements. Asbestos waste must only be disposed of at a landfill site that can lawfully receive this this type of waste. A receipt must be retained and submitted to the Principal Certifier, and a copy submitted to Council (in the event that Council is not the Principal Certifier), prior to commencement of the construction works. Reason: To satisfy the requirements of the legislation.

Condition 86 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

86. Asbestos Waste Collection, Transportation and Disposal Asbestos waste must be prepared, contained, transported and disposed of in accordance with SafeWork NSW and NSW Environment Protection Authority requirements. Asbestos waste must only be disposed of at a landfill site that can lawfully receive this this type of waste. A receipt must be retained and submitted to the Principal Certifier, and a copy submitted to Council (in the event that Council is not the Principal Certifier), prior to commencement of the construction works. Reason: To satisfy the requirements of the legislation.

Condition 78 DA-2023/785 det. 10/05/2024 Group Home

78. Stop Work - Green and Golden Bell Frogs If green and golden bell frogs are found at any time during the demolition, excavation or construction phases of the development, work shall cease immediately, and a qualified zoologist experienced in the identification and management of the green and golden bell frog shall be contacted and a report of the find made to Environment Line (telephone 1300 361 967). Reason: To satisfy the requirements of the legislation.

Condition 58 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

58. Notification to SafeWork NSW The demolition licence holder who proposes demolition of a structure or part of a structure that is loadbearing or otherwise related to the physical integrity of the structure that is at least six (6) metres in height, involving load shifting machinery on a suspended floor, or involving the use of explosives must notify SafeWork NSW in writing at least five (5) calendar days before the work commences. Reason: To ensure safety.

Condition 101 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

101. Asbestos - Removal, Handling and Disposal Measures/Requirements Asbestos Removal by a Licensed Asbestos Removalist The removal of any asbestos material must be carried out by a licensed asbestos removalist if over 10 square metres in area of non-friable asbestos, or if any type of friable asbestos in strict accordance with SafeWork NSW requirements (https://www.safework.nsw.gov.au). Reason: To satisfy the requirements of the legislation.

Condition 85 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

85. Asbestos - Removal, Handling and Disposal Measures/Requirements Asbestos Removal by a Licensed Asbestos Removalist The removal of any asbestos material must be carried out by a licensed asbestos removalist if over 10 square metres in area of non-friable asbestos, or if any type of friable asbestos in strict accordance with SafeWork NSW requirements (https://www.safework.nsw.gov.au). Reason: To satisfy the requirements of the legislation.

Condition 85 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

85. Asbestos - Removal, Handling and Disposal Measures/Requirements Asbestos Removal by a Licensed Asbestos Removalist The removal of any asbestos material must be carried out by a licensed asbestos removalist if over 10 square metres in area of non-friable asbestos, or if any type of friable asbestos in strict accordance with SafeWork NSW requirements (https://www.safework.nsw.gov.au). Reason: To satisfy the requirements of the legislation.

Condition 99 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

99. Asbestos - Removal, Handling and Disposal Measures/Requirements Asbestos Removal by a Licensed Asbestos Removalist The removal of any asbestos material must be carried out by a licensed asbestos removalist if over 10 square metres in area of non-friable asbestos, or if any type of friable asbestos in strict accordance with SafeWork NSW requirements (https://www.safework.nsw.gov.au). Reason: To satisfy the requirements of the legislation.

Condition 35 DA-2023/767 det. 17/12/2024 The Globe Project

35. Dust Suppression Measures The submission of details of the proposed dust suppression measures for the demolition, excavation and construction phases of the development to the Principal Certifier prior to issue of the Construction Certificate. Reason: To comply with Council's Development Control Plan.

Condition 34 DA-2023/767 det. 17/12/2024 The Globe Project

34. Dust Suppression Measures The submission of details of the proposed dust suppression measures for the demolition, excavation and construction phases of the development to the Principal Certifier prior to issue of the Construction Certificate. Reason: To comply with Council's Development Control Plan.

Condition 34 DA-2023/785 det. 10/05/2024 Group Home

34. Dust Suppression Measures The submission of details of the proposed dust suppression measures for the demolition, excavation and construction phases of the development to the Principal Certifier prior to issue of the Construction Certificate. Reason: To comply with Council's Development Control Plan.

Condition 16 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

16. Dust Suppression Measures The submission of details of the proposed dust suppression measures for the demolition, excavation and construction phases of the development to the Principal Certifier prior to issue of the Construction Certificate. Reason: To comply with Council's Development Control Plan.

Condition 16 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

16. Dust Suppression Measures The submission of details of the proposed dust suppression measures for the demolition, excavation and construction phases of the development to the Principal Certifier prior to issue of the Construction Certificate. Reason: To comply with Council's Development Control Plan.

Condition 100 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

100. Asbestos Clearance Certificate An Asbestos Clearance Certificate to certify that the site area is free of asbestos is to be submitted to Council by a licensed asbestos assessor within 14 days of the completion of demolition works. Reason: To satisfy the requirements of the legislation.

Condition 102 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

102. Asbestos Clearance Certificate An Asbestos Clearance Certificate to certify that the site area is free of asbestos is to be submitted to Council by a licensed asbestos assessor within 14 days of the completion of demolition works. Reason: To satisfy the requirements of the legislation.

Condition 90 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

90. Asbestos Clearance Certificate An asbestos clearance certificate issued by a suitably qualified person must be submitted to the Principal Certifier within fourteen (14) days of completion of the demolition work. Reason: To satisfy the requirements of the legislation.

Condition 104 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

104. Demolition Materials - Disposal All demolition materials not being reused on-site shall be disposed of only at a recycling or waste management facility that may lawfully receive that waste. Reason: To ensure protection of the environment and comply with legislation.

Condition 106 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

106. Demolition Materials - Disposal All demolition materials not being reused on-site shall be disposed of only at a recycling or waste management facility that may lawfully receive that waste. Reason: To ensure protection of the environment and comply with legislation.

Condition 75 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

75. Dust Suppression Measures Activities occurring during the demolition and excavation phase of the development must be carried out in a manner that will minimise the generation of dust. Reason: To ensure ongoing protection of the environment and neighbourhood amenity.

Condition 76 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

76. Dust Suppression Measures Activities occurring during the demolition and excavation phase of the development must be carried out in a manner that will minimise the generation of dust. Reason: To ensure ongoing protection of the environment and neighbourhood amenity.

Condition 61 DA-2023/785 det. 10/05/2024 Group Home

61. Consultation with SafeWork NSW - Prior to Asbestos Removal A licensed asbestos removalist must give written notice to SafeWork NSW at least five (5) days before licensed asbestos removal work is commenced. Reason: To satisfy the requirements of the legislation.

Condition 60 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

60. Construction with SafeWork NSW - Prior to Asbestos Removal A licensed asbestos removalist must give written notice to SafeWork NSW at least five (5) days before licensed asbestos removal work is commenced. Reason: To satisfy the requirements of the legislation.

Condition 50 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

50. Consultation with SafeWork NSW - Prior to Asbestos Removal A licensed asbestos removalist must give written notice to SafeWork NSW at least five (5) days before licensed asbestos removal work is commenced. Reason: To satisfy the requirements of the legislation.

Condition 51 DA-2024/870 det. 25/02/2025 Demolition works for 'The Globe' project

51. Consultation with SafeWork NSW - Prior to Asbestos Removal A licensed asbestos removalist must give written notice to SafeWork NSW at least five (5) days before licensed asbestos removal work is commenced. Reason: To satisfy the requirements of the legislation.

Condition 59 DA-2023/785 det. 10/05/2024 Group Home

59. Demolition Notification to Surrounding Residents Demolition must not commence unless at least two (2) days written notice has been given to adjoining residents of the date on which demolition works will commence. Reason: To advise neighbourhood.

Condition 69 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

69. Demolition Notification to Surrounding Residents Demolition must not commence unless at least two (2) days written notice has been given to adjoining residents of the date on which demolition works will commence. Reason: To advise neighbourhood.

Condition 13 DA-2023/767 det. 17/12/2024 The Globe Project

13. Demolition Prior to the issue of a construction certificate, separate development consent shall be obtained for the demolition of existing structures (within the relevant stages) from the site. Reason: To comply with the applicable legislation.

Condition 62 DA-2024/502 det. 25/02/2025 Dapto Leagues Club

62. Demolition Works Demolition works must be carried out in accordance with the Demolition Management Plan provided to the Principal Certifier. Reason: To ensure all parties are aware of the approved plans and supporting documentation.

Condition 79 DA-2023/895 det. 16/06/2025 Former Bulli Hospital

79. Demolition Materials - Disposal All demolition materials not being reused on-site shall be disposed of only at a recycling or waste management facility that may lawfully receive that waste. Reason: To comply with legislation.

Condition 13 DA-2023/767 det. 17/12/2024 The Globe Project

13. Demolition Separate development consent shall be obtained for the demolition of existing structures from the site. Reason: To comply with the applicable legislation.