Mosman Construction Management Conditions
9 construction management conditions imposed by Mosman across 1 development application in our dataset. Construction management conditions govern how building work is carried out — construction management plans, approved work hours, site fencing and hoarding, dust and noise control, and protection of public roads and infrastructure.
7. Development involving excavation that extends below the level of the base of the footings of a building, structure or work (including any structure within a road corridor) on adjoining land, the person having the benefit of the development consent must at the person’s own expense: (a) protect and support the building, structure or work from possible damage from the excavation, and (b) where necessary, underpin the adjoining premises to prevent any such damage. PRIOR TO THE RELEASE OF THE CONSTRUCTION CERTIFICATE The following conditions must be satisfied prior to the release of the Construction Certificate. Conditions may require the submission of additional information with the…
79. As part of the ongoing assessment of the tree/s to be retained, an Australian Qualification Framework level 5 aborist engaged by the applicant is to assess their health and any impacts suffered by them as a result of the approved development. Findings are to be compiled in a detailed report to be provided to Council at the completion of construction and prior to the release of the Occupation Certificate which documents the following: • The methods of excavation or construction used to carry out works; • Any damage sustained by the tree/s as a result of the works; • Any subsequent remedial works required to be carried out by the Aborist as a result of the damage; and • Any future or on…
8. Architectural and Structural Engineer’s plans must be submitted with the Construction Certificate application. The structural engineering plans must be signed by a qualified practicing Structural Engineer with membership of the Institute of Engineers Australia or who is eligible to become a member and has appropriate experience and competence in the related field. The plans are to incorporate and note any changes from the approved development application plans as required by conditions of this consent. Where Council is nominated as the Principal Certifying Authority, two copies of the architectural and structural engineer’s plans must be submitted and for applications involving…
10. The applicant shall supply Council with a dilapidation report for the adjoining properties at Nos. 252 Raglan Street and 1 Esther Road which documents and photographs the condition of buildings and improvements on those properties. The dilapidation report shall be submitted as a PDF in Adobe format or in A4 format. A copy of the report must be provided to Council, any other owners of public infrastructure and the owners of nominated properties. Council shall be provided with a list of owners to whom a copy of the report has been provided. Excavation, Backfilling and Support for Neighbouring Buildings
25. Prior to the issue of a Construction Certificate, the Certifying Authority is to be provided with plans demonstrating that all Services (Gas meter, water meter & fire hydrant and sprinkler booster valves and the like) are enclosed in a manner that complements the building and in accordance with the requirements of EP1.3 & EP1.4 of the BCA. (Reason: To ensure essential services are appropriately screened) Fire Safety
20. Before the construction of the approved development, it is necessary to obtain a Construction Certificate. A Construction Certificate may be issued by Council or an Accredited Certifier. Plans submitted with the Construction Certificate are to be amended to incorporate the conditions of the development consent. Materials and Finishes
26. To enable the issuing of a fire safety schedule, information required by Part 10 of the Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021 must be submitted with the Construction Certificate application. Long Service Levy
60. All records of noise monitoring, community consultations, complaints diaries and mitigation responses associated with construction works must be kept on site and produced on request for Council Officers. Construction Hoarding or Fencing
61. Any construction hoarding or fencing is to be maintained in good order throughout the life of the fence. Shoring and Adequacy of Adjoining Property
Snippets shown for reference only. Verify against the original consent on the NSW Planning Portal.
Construction Management conditions in other councils
Cumberland
138 conditions
Burwood
129 conditions
Willoughby
95 conditions
Wollongong
95 conditions
City of Parramatta
82 conditions
Ku-ring-gai
79 conditions
Bayside
68 conditions
Lane Cove
64 conditions
Fairfield
60 conditions
City of Ryde
51 conditions
Sutherland
40 conditions
Waverley
40 conditions
City of Sydney
39 conditions
Campbelltown
38 conditions
Canterbury-Bankstown
35 conditions
Randwick
35 conditions
Newcastle
32 conditions
Inner West
31 conditions
Hornsby
30 conditions
Strathfield
23 conditions
Georges River
22 conditions
Hawkesbury
19 conditions
Wollondilly
15 conditions
Camden
12 conditions
Blue Mountains
12 conditions
Liverpool
7 conditions
Woollahra
6 conditions
Canada Bay
5 conditions
Lake Macquarie
5 conditions
North Sydney
5 conditions
Central Coast
4 conditions